메뉴 건너뛰기




Volumn 29, Issue 1-2, 2006, Pages 165-169

Further study of minimizing total tardiness for the worker assignment scheduling problem in the identical parallel-machine models

Author keywords

LMC procedure; SES heuristic; Simulation; Total tardiness; Worker assignment scheduling problem

Indexed keywords

COMPUTER SIMULATION; HEURISTIC METHODS; IDENTIFICATION (CONTROL SYSTEMS); OPTIMIZATION; PROBLEM SOLVING; SIMULATION;

EID: 33744535196     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-004-2487-7     Document Type: Article
Times cited : (13)

References (14)
  • 1
    • 1942473649 scopus 로고    scopus 로고
    • Minimizing total tardiness for the worker assignment scheduling problem in identical parallel-machine models
    • Hu P (2004) Minimizing total tardiness for the worker assignment scheduling problem in identical parallel-machine models. Int J Adv Manuf Technol 23:383-388
    • (2004) Int J Adv Manuf Technol , vol.23 , pp. 383-388
    • Hu, P.1
  • 2
    • 0016035331 scopus 로고
    • Scheduling jobs on a number of identical machines
    • Elmaghraby SE, Park SH (1974) Scheduling jobs on a number of identical machines. AIIE Trans 6:1-13
    • (1974) AIIE Trans , vol.6 , pp. 1-13
    • Elmaghraby, S.E.1    Park, S.H.2
  • 3
    • 0001021215 scopus 로고
    • Complexity of scheduling parallel task systems
    • Du J, Leung JY-H (1989) Complexity of scheduling parallel task systems. SIAM J Discrete Math 2(4):473-487
    • (1989) SIAM J Discrete Math , vol.2 , Issue.4 , pp. 473-487
    • Du, J.1    Leung, J.Y.-H.2
  • 4
    • 0026152333 scopus 로고
    • The processor working set and its use in scheduling multiprocessor systems
    • Ghosal D, Serazzi G, Tripathi SK (1991) The processor working set and its use in scheduling multiprocessor systems. IEEE Trans Softw Eng 17(5):443-453
    • (1991) IEEE Trans Softw Eng , vol.17 , Issue.5 , pp. 443-453
    • Ghosal, D.1    Serazzi, G.2    Tripathi, S.K.3
  • 5
    • 0001439212 scopus 로고
    • Gang scheduling performance benefits for fine-grain synchronization
    • Feitelson DG, Rudolph L (1992) Gang scheduling performance benefits for fine-grain synchronization. J. Parallel Distr Comput 16(4): 306-318
    • (1992) J. Parallel Distr Comput , vol.16 , Issue.4 , pp. 306-318
    • Feitelson, D.G.1    Rudolph, L.2
  • 6
    • 0002522922 scopus 로고
    • A heuristic of scheduling parallel tasks and its analysis
    • Wand Q, Cheng KH (1992) A heuristic of scheduling parallel tasks and its analysis. SIAM J Comput 21(2):281-294
    • (1992) SIAM J Comput , vol.21 , Issue.2 , pp. 281-294
    • Wand, Q.1    Cheng, K.H.2
  • 7
    • 0035681031 scopus 로고    scopus 로고
    • List scheduling in a parallel machine environment with precedence constraints and setup rimes
    • Hurink J, Knust S (2001) List scheduling in a parallel machine environment with precedence constraints and setup rimes. Oper Res Lett 29:231-239
    • (2001) Oper Res Lett , vol.29 , pp. 231-239
    • Hurink, J.1    Knust, S.2
  • 8
    • 0032313785 scopus 로고    scopus 로고
    • A heuristic procedure for makespan minimization in job shops with multiple identical processors
    • Sule DR, Vijayasundaram K (1998) A heuristic procedure for makespan minimization in job shops with multiple identical processors. Comput Ind Eng 35(3-4):399 - 402
    • (1998) Comput Ind Eng , vol.35 , Issue.3-4 , pp. 399-402
    • Sule, D.R.1    Vijayasundaram, K.2
  • 9
    • 85005403655 scopus 로고
    • Scheduling jobs on parallel processors with dynamic programming
    • Gupta JND, Maykut AR (1973) Scheduling jobs on parallel processors with dynamic programming. Decis Sci 4(4):447-457
    • (1973) Decis Sci , vol.4 , Issue.4 , pp. 447-457
    • Gupta, J.N.D.1    Maykut, A.R.2
  • 10
    • 0001491109 scopus 로고
    • Scheduling independent tasks on parallel processors
    • Rothkopf MH (1966) Scheduling independent tasks on parallel processors. Manage Sci 12(5):437-447
    • (1966) Manage Sci , vol.12 , Issue.5 , pp. 437-447
    • Rothkopf, M.H.1
  • 11
    • 0018685640 scopus 로고
    • Evaluation of a heuristic for scheduling independent jobs on parallel identical processors
    • Dogramaci A, Surkis J (1979) Evaluation of a heuristic for scheduling independent jobs on parallel identical processors. Manage Sci 25(12):1208-1216
    • (1979) Manage Sci , vol.25 , Issue.12 , pp. 1208-1216
    • Dogramaci, A.1    Surkis, J.2
  • 12
    • 84989675202 scopus 로고
    • Heuristics for minimizing mean tardiness for m parallel machines
    • Ho JC, Chang YL (1991) Heuristics for minimizing mean tardiness for m parallel machines. Navel Res Logist 38:367-381
    • (1991) Navel Res Logist , vol.38 , pp. 367-381
    • Ho, J.C.1    Chang, Y.L.2
  • 13
    • 0031075568 scopus 로고    scopus 로고
    • Decomposition and hybrid simulated annealing heuristics for the parallel-machine total tardiness problem
    • Koulamas C (1997) Decomposition and hybrid simulated annealing heuristics for the parallel-machine total tardiness problem. Naval Res Logist 44:109-125
    • (1997) Naval Res Logist , vol.44 , pp. 109-125
    • Koulamas, C.1
  • 14
    • 0031341489 scopus 로고    scopus 로고
    • Search heuristics for a parallel machine scheduling problem with ready times and due dates
    • Park M-W, Kim Y-D, (1997) Search heuristics for a parallel machine scheduling problem with ready times and due dates. Comput Ind Eng 33(3-4):793-796
    • (1997) Comput Ind Eng , vol.33 , Issue.3-4 , pp. 793-796
    • Park, M.-W.1    Kim, Y.-D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.