Volumn 40, Issue 12, 2013, Pages 2836-2843

A two-stage hybrid flow shop with dedicated machines at the first stage

Author keywords

Computational complexity; Heuristic; Two stage hybrid flow shop; Worst case bound on the relative error

Indexed keywords

DECISION VERSION; HEURISTIC; MULTIPLE MACHINE; RELATIVE ERRORS; SCHEDULING RULES; SINGLE- MACHINES; SOLUTION PROCEDURE; TWO-STAGE HYBRID FLOW SHOP;

EID: 84880279998     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2013.05.020     Document Type: Article
Times cited : (17)

References (15)
  • 1
  • 4
    • 0031543097 scopus 로고    scopus 로고
    • Scheduling a two-stage hybrid flow shop with parallel machines at the first stage
    • J.N.D. Gupta, A.M.A. Hairi, and C.N. Potts Scheduling a two-stage hybrid flow shop with parallel machines at the first stage Annals of Operations Research 69 1997 171 191 (Pubitemid 127503103)
    • (1997) Annals of Operations Research , vol.69 , pp. 171-191
    • Gupta, J.N.D.1    Hariri, A.M.A.2    Potts, C.N.3
  • 5
    • 33947104553 scopus 로고    scopus 로고
    • A hybrid two-stage flowshop scheduling problem
    • DOI 10.1142/S0217595907001036
    • L. He, and S. Sun A hybrid two-stage flowshop scheduling problem Asia-Pacific Journal of Operational Research 24 2007 45 56 (Pubitemid 46411091)
    • (2007) Asia-Pacific Journal of Operational Research , vol.24 , Issue.1 , pp. 45-56
    • He, L.1    Sun, S.2    Luo, R.3
  • 6
    • 33846433522 scopus 로고    scopus 로고
    • Minimizing the makespan in a two-stage flowshop scheduling problem with a function constraint on alternative machines
    • C.-J. Hsu, W.-H. Kuo, D.-L. Yang, and M.-S. Chern Minimizing the makespan in a two-stage flowshop scheduling problem with a function constraint on alternative machines Journal of Marine Science and Technology 14 2006 213 217 (Pubitemid 46143826)
    • (2006) Journal of Marine Science and Technology , vol.14 , Issue.4 , pp. 213-217
    • Hsu, C.-J.1    Kuo, W.-H.2    Yang, D.-L.3    Chern, M.-S.4
  • 9
    • 0033166747 scopus 로고    scopus 로고
    • The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine
    • DOI 10.1016/S0305-0548(98)00080-X, PII S030505489800080X
    • B.M.T. Lin The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine Computers and Operations Research 26 1999 695 698 (Pubitemid 29346446)
    • (1999) Computers and Operations Research , vol.26 , Issue.7 , pp. 695-698
    • Lin, B.M.T.1
  • 10
    • 34548462907 scopus 로고    scopus 로고
    • A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines
    • DOI 10.1016/j.cor.2006.04.004, PII S0305054806001237
    • C. Low, C.-J. Hsu, and C.-T. Su A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated machines Computers and Operations Research 35 2008 845 853 (Pubitemid 47368842)
    • (2008) Computers and Operations Research , vol.35 , Issue.3 , pp. 845-853
    • Low, C.1    Hsu, C.-J.2    Su, C.-T.3
  • 11
    • 0031363501 scopus 로고    scopus 로고
    • Two-stage flowshop scheduling with a common second-stage machine
    • C. Oǧuz, B.M.T. Lin, and T.C. Cheng Two-stage flowshop scheduling with a common second-stage machine Computers and Operations Research 24 1997 1169 1174
    • (1997) Computers and Operations Research , vol.24 , pp. 1169-1174
    • Oǧuz, C.1    Lin, B.M.T.2    Cheng, T.C.3
  • 12
    • 73449099561 scopus 로고    scopus 로고
    • Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective
    • I. Ribas, R. Leisten, and J.M. Framiñan Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective Computers and Operations Research 37 2010 1439 1454
    • (2010) Computers and Operations Research , vol.37 , pp. 1439-1454
    • Ribas, I.1    Leisten, R.2    Framiñan, J.M.3
  • 14
    • 78649635166 scopus 로고    scopus 로고
    • Minimizing total completion time in two-stage hybrid flow shop with dedicated machines
    • J. Yang Minimizing total completion time in two-stage hybrid flow shop with dedicated machines Computers and Operations Research 38 2011 1045 1053
    • (2011) Computers and Operations Research , vol.38 , pp. 1045-1053
    • Yang, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.