1
-
-
0033078202
-
Heuristics for Scheduling in a Flow Shop with Multiple Processors
-
Brah, S.A. and Loo, L.L., "Heuristics for Scheduling in a Flow Shop with Multiple Processors," European Journal of Operational Research, Vol. 113, No. 1, pp. 113-122 (1999).
-
(1999)
European Journal of Operational Research
, vol.113
, Issue.1
, pp. 113-122
-
-
Brah, S.A.1
Loo, L.L.2
-
2
-
-
0036604821
-
Nonpreemptive Flowshop Scheduling with Machine Dominance
-
Cepek, O., Okada, M., and Vlach, M., "Nonpreemptive Flowshop Scheduling with Machine Dominance," European Journal of Operational Research, Vol. 139, No. 2, pp. 245-261 (2002).
-
(2002)
European Journal of Operational Research
, vol.139
, Issue.2
, pp. 245-261
-
-
Cepek, O.1
Okada, M.2
Vlach, M.3
-
3
-
-
0037052717
-
A Study of the Multi-Stage Flowshop Scheduling Problem with Alternative Operation Assignments
-
Futatsuishi, Y., Watanabe, I., and Nakanishi, T., "A Study of the Multi-Stage Flowshop Scheduling Problem with Alternative Operation Assignments," Mathimatics and Computers in Simulation, Vol. 59, No. 3, pp. 73-79 (2002).
-
(2002)
Mathimatics and Computers in Simulation
, vol.59
, Issue.3
, pp. 73-79
-
-
Futatsuishi, Y.1
Watanabe, I.2
Nakanishi, T.3
-
4
-
-
0003603813
-
-
Freeman, San Francisco, CA, pp
-
Graey, M.R. and Johnson, D.S., Computers and Intractability: A Guide to the Theory of NP-Completeness, Freeman, San Francisco, CA, pp. 60-62 (1979).
-
(1979)
Computers and Intractability: A Guide to the Theory of NP-Completeness
, pp. 60-62
-
-
Graey, M.R.1
Johnson, D.S.2
-
5
-
-
0029244346
-
Flowshop Scheduling with Sominant Machines
-
Ho, J.C. and Gupta, J.N.D., "Flowshop Scheduling with Sominant Machines," Computers and Operations Research, Vol. 22, No. 2, pp. 237-246 (1995).
-
(1995)
Computers and Operations Research
, vol.22
, Issue.2
, pp. 237-246
-
-
Ho, J.C.1
Gupta, J.N.D.2
-
6
-
-
0003075019
-
Optimal Two- and Three-Stage Production Schedules with Setup Times Included
-
Johnson, S.M., "Optimal Two- and Three-Stage Production Schedules with Setup Times Included," Naval Research Logistics Quarterly, Vol. 1, No. 1, pp. 61-68 (1954).
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, Issue.1
, pp. 61-68
-
-
Johnson, S.M.1
-
7
-
-
0031258498
-
Transfer Batch Scheduling for a Two-Stage Flowshop with Identical Parallel Machines at Each Stage
-
Kim, J.S., Kang, S.H., and Lee, S.M., "Transfer Batch Scheduling for a Two-Stage Flowshop with Identical Parallel Machines at Each Stage," Omega, Vol. 25, No. 1, pp. 547-555 (1997).
-
(1997)
Omega
, vol.25
, Issue.1
, pp. 547-555
-
-
Kim, J.S.1
Kang, S.H.2
Lee, S.M.3
-
8
-
-
0034079033
-
Two-Machine Flowshop Group Scheduling Problem
-
Yang, D.L. and Chern, M.S., "Two-Machine Flowshop Group Scheduling Problem," Computers and Operations Research, Vol. 27, No. 10, pp. 975-985 (2000).
-
(2000)
Computers and Operations Research
, vol.27
, Issue.10
, pp. 975-985
-
-
Yang, D.L.1
Chern, M.S.2
-
9
-
-
0018520161
-
Optimal Two-Stage Production Scheduling with Setup Times Separated
-
Yoshida, T. and Hitomi, K., "Optimal Two-Stage Production Scheduling with Setup Times Separated," AIIE Transactions, Vol. 11, No. 1, pp. 261-273 (1979).
-
(1979)
AIIE Transactions
, vol.11
, Issue.1
, pp. 261-273
-
-
Yoshida, T.1
Hitomi, K.2
|