메뉴 건너뛰기




Volumn 14, Issue 4, 2006, Pages 213-217

Minimizing the makespan in a two-stage flowshop scheduling problem with a function constraint on alternative machines

Author keywords

Alternative machines; Function constraint; Scheduling

Indexed keywords

ALGORITHMS; COMPUTATIONAL COMPLEXITY; HEURISTIC METHODS; OPTIMIZATION; PRODUCTION CONTROL; SCHEDULING;

EID: 33846433522     PISSN: 10232796     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (5)

References (9)
  • 1
    • 0033078202 scopus 로고    scopus 로고
    • Heuristics for Scheduling in a Flow Shop with Multiple Processors
    • Brah, S.A. and Loo, L.L., "Heuristics for Scheduling in a Flow Shop with Multiple Processors," European Journal of Operational Research, Vol. 113, No. 1, pp. 113-122 (1999).
    • (1999) European Journal of Operational Research , vol.113 , Issue.1 , pp. 113-122
    • Brah, S.A.1    Loo, L.L.2
  • 2
    • 0036604821 scopus 로고    scopus 로고
    • Nonpreemptive Flowshop Scheduling with Machine Dominance
    • Cepek, O., Okada, M., and Vlach, M., "Nonpreemptive Flowshop Scheduling with Machine Dominance," European Journal of Operational Research, Vol. 139, No. 2, pp. 245-261 (2002).
    • (2002) European Journal of Operational Research , vol.139 , Issue.2 , pp. 245-261
    • Cepek, O.1    Okada, M.2    Vlach, M.3
  • 3
    • 0037052717 scopus 로고    scopus 로고
    • A Study of the Multi-Stage Flowshop Scheduling Problem with Alternative Operation Assignments
    • Futatsuishi, Y., Watanabe, I., and Nakanishi, T., "A Study of the Multi-Stage Flowshop Scheduling Problem with Alternative Operation Assignments," Mathimatics and Computers in Simulation, Vol. 59, No. 3, pp. 73-79 (2002).
    • (2002) Mathimatics and Computers in Simulation , vol.59 , Issue.3 , pp. 73-79
    • Futatsuishi, Y.1    Watanabe, I.2    Nakanishi, T.3
  • 5
    • 0029244346 scopus 로고
    • Flowshop Scheduling with Sominant Machines
    • Ho, J.C. and Gupta, J.N.D., "Flowshop Scheduling with Sominant Machines," Computers and Operations Research, Vol. 22, No. 2, pp. 237-246 (1995).
    • (1995) Computers and Operations Research , vol.22 , Issue.2 , pp. 237-246
    • Ho, J.C.1    Gupta, J.N.D.2
  • 6
    • 0003075019 scopus 로고
    • Optimal Two- and Three-Stage Production Schedules with Setup Times Included
    • Johnson, S.M., "Optimal Two- and Three-Stage Production Schedules with Setup Times Included," Naval Research Logistics Quarterly, Vol. 1, No. 1, pp. 61-68 (1954).
    • (1954) Naval Research Logistics Quarterly , vol.1 , Issue.1 , pp. 61-68
    • Johnson, S.M.1
  • 7
    • 0031258498 scopus 로고    scopus 로고
    • Transfer Batch Scheduling for a Two-Stage Flowshop with Identical Parallel Machines at Each Stage
    • Kim, J.S., Kang, S.H., and Lee, S.M., "Transfer Batch Scheduling for a Two-Stage Flowshop with Identical Parallel Machines at Each Stage," Omega, Vol. 25, No. 1, pp. 547-555 (1997).
    • (1997) Omega , vol.25 , Issue.1 , pp. 547-555
    • Kim, J.S.1    Kang, S.H.2    Lee, S.M.3
  • 8
    • 0034079033 scopus 로고    scopus 로고
    • Two-Machine Flowshop Group Scheduling Problem
    • Yang, D.L. and Chern, M.S., "Two-Machine Flowshop Group Scheduling Problem," Computers and Operations Research, Vol. 27, No. 10, pp. 975-985 (2000).
    • (2000) Computers and Operations Research , vol.27 , Issue.10 , pp. 975-985
    • Yang, D.L.1    Chern, M.S.2
  • 9
    • 0018520161 scopus 로고
    • Optimal Two-Stage Production Scheduling with Setup Times Separated
    • Yoshida, T. and Hitomi, K., "Optimal Two-Stage Production Scheduling with Setup Times Separated," AIIE Transactions, Vol. 11, No. 1, pp. 261-273 (1979).
    • (1979) AIIE Transactions , vol.11 , Issue.1 , pp. 261-273
    • Yoshida, T.1    Hitomi, K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.