메뉴 건너뛰기




Volumn , Issue , 2012, Pages

Energy-aware scheduling under reliability and makespan constraints

Author keywords

[No Author keywords available]

Indexed keywords

CONTINUOUS MODELS; DYNAMIC VOLTAGE AND FREQUENCY SCALING; ENERGY-AWARE SCHEDULING; HOMOGENEOUS PROCESSORS; MAKESPAN CONSTRAINTS; RELIABILITY THRESHOLD; SCHEDULING HEURISTICS; SCHEDULING PROBLEM;

EID: 84880273607     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/HiPC.2012.6507482     Document Type: Conference Paper
Times cited : (31)

References (25)
  • 2
    • 33947225230 scopus 로고    scopus 로고
    • Speed scaling to manage energy and temperature
    • N. Bansal, T. Kimbrel, and K. Pruhs, "Speed scaling to manage energy and temperature," Journal of the ACM, vol. 54, no. 1, pp. 1 -39, 2007.
    • (2007) Journal of the ACM , vol.54 , Issue.1 , pp. 1-39
    • Bansal, N.1    Kimbrel, T.2    Pruhs, K.3
  • 3
    • 33745136467 scopus 로고    scopus 로고
    • Multiprocessor energy-efficient scheduling for real-time tasks
    • IEEE CS Press
    • J.-J. Chen and T.-W. Kuo, "Multiprocessor energy-efficient scheduling for real-time tasks," in Proc. of Int. Conf. on Parallel Processing (ICPP). IEEE CS Press, 2005, pp. 13-20.
    • (2005) Proc. of Int. Conf. on Parallel Processing (ICPP) , pp. 13-20
    • Chen, J.-J.1    Kuo, T.-W.2
  • 6
    • 79959671741 scopus 로고    scopus 로고
    • Reclaiming the energy of a schedule, models and algorithms
    • INRIA research report 7598 at graal.ens-lyon.fr/-abenoit
    • G. Aupy, A. Benoit, F. Dufossé, and Y. Robert, "Reclaiming the energy of a schedule, models and algorithms," Concurrency and Computation: Practice and Experience, 2012, also available as INRIA research report 7598 at graal.ens-lyon.fr/-abenoit.
    • (2012) Concurrency and Computation: Practice and Experience
    • Aupy, G.1    Benoit, A.2    Dufossé, F.3    Robert, Y.4
  • 7
    • 84867433583 scopus 로고
    • Scheduling parallel programs assuming preallocation
    • P. Chrétienne, E. G. Coffman Jr., J. K. Lenstra, and Z. Liu, Eds. John Wiley and Sons
    • V. J. Rayward-Smith, F. W. Burton, and G. J. Janacek, "Scheduling parallel programs assuming preallocation," in Scheduling Theory and its Applications, P. Chrétienne, E. G. Coffman Jr., J. K. Lenstra, and Z. Liu, Eds. John Wiley and Sons, 1995.
    • (1995) Scheduling Theory and Its Applications
    • Rayward-Smith, V.J.1    Burton, F.W.2    Janacek, G.J.3
  • 11
    • 16244394835 scopus 로고    scopus 로고
    • The effects of energy management on reliability in real-time embedded systems
    • Washington, DC, USA: IEEE CS Press
    • D. Zhu, R. Melhem, and D. Mossé, "The effects of energy management on reliability in real-time embedded systems," in Proc. of IEEE/ACM Int. Conf. on Computer-Aided Design (ICCAD). Washington, DC, USA: IEEE CS Press, 2004, pp. 35-40.
    • (2004) Proc. of IEEE/ACM Int. Conf. on Computer-Aided Design (ICCAD) , pp. 35-40
    • Zhu, D.1    Melhem, R.2    Mossé, D.3
  • 17
    • 59149105005 scopus 로고    scopus 로고
    • Reliability versus performance for critical applications
    • March
    • A. Girault, E. Saule, and D. Trystram, "Reliability versus performance for critical applications," J. Parallel Distrib. Comput., vol. 69, pp. 326-336, March 2009.
    • (2009) J. Parallel Distrib. Comput. , vol.69 , pp. 326-336
    • Girault, A.1    Saule, E.2    Trystram, D.3
  • 18
    • 1342323873 scopus 로고    scopus 로고
    • The interplay of power management and fault recovery in real-time systems
    • R. Melhem, D. Mosse, and E. Elnozahy, "The interplay of power management and fault recovery in real-time systems," IEEE Trans. on Computers, vol. 53, p. 2004, 2003.
    • (2003) IEEE Trans. on Computers , vol.53 , pp. 2004
    • Melhem, R.1    Mosse, D.2    Elnozahy, E.3
  • 20
    • 0024645634 scopus 로고
    • Models and algorithms for reliabilityoriented task-allocation in redundant distributed-computer systems
    • S. M. Shatz and J.-P. Wang, "Models and algorithms for reliabilityoriented task-allocation in redundant distributed-computer systems," IEEE Transactions on Reliability, vol. 38, pp. 16-27, 1989.
    • (1989) IEEE Transactions on Reliability , vol.38 , pp. 16-27
    • Shatz, S.M.1    Wang, J.-P.2
  • 22
    • 84880264724 scopus 로고    scopus 로고
    • Energy-aware scheduling under reliability and makespan constraint
    • France, Research Report 7757, Feb. 2012, available at graal.ens-lyon.fr/-abenoit
    • G. Aupy, A. Benoit, and Y. Robert, "Energy-aware scheduling under reliability and makespan constraint," INRIA, France, Research Report 7757, Feb. 2012, available at graal.ens-lyon.fr/-abenoit.
    • INRIA
    • Aupy, G.1    Benoit, A.2    Robert, Y.3
  • 24
    • 84880299744 scopus 로고    scopus 로고
    • G. Aupy, "Source code and data." 2012. [Online]. Available: http://gaupy.org/tri-criteria-scheduling.
    • (2012) Source Code and Data
    • Aupy, G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.