메뉴 건너뛰기




Volumn 4, Issue 3, 2013, Pages 554-562

Stochastic price-based coordination of intrahour wind energy and storage in a generation company

Author keywords

Day ahead market; generating companies (GENCOs); pumped storage (PS) hydro units; stochastic price based unit commitment (PBUC); variable wind power generation

Indexed keywords

COORDINATED SCHEDULING; DAY AHEAD MARKET; ELECTRICITY MARKET; GENERATING COMPANIES; GENERATION COMPANIES; PUMPED-STORAGE; SCHEDULING STRATEGIES; STOCHASTIC PRICE-BASED UNIT COMMITMENTS;

EID: 84880063909     PISSN: 19493029     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSTE.2012.2228284     Document Type: Article
Times cited : (55)

References (33)
  • 3
    • 84880074346 scopus 로고    scopus 로고
    • ERCOT wind impact/integration analysis, phase 1 review: Variability and predictability
    • Austin, TX, Oct. 2007, Electric Reliability Council of Texas (ERCOT)
    • "ERCOT wind impact/integration analysis, phase 1 review: Variability and predictability, " in Proc. ROS Wind A/S Task Force Meeting, Austin, TX, Oct. 2007, Electric Reliability Council of Texas (ERCOT).
    • Proc. ROS Wind A/S Task Force Meeting
  • 4
    • 84880069211 scopus 로고    scopus 로고
    • ERCOT wind impact/integration analysis, phase 2 review: Ancillary services requirements
    • Austin, TX, Feb. 2008, Electric Reliability Council of Texas (ERCOT)
    • "ERCOT wind impact/integration analysis, phase 2 review: Ancillary services requirements, " in Proc. Wind Impact Task Force Meeting, Austin, TX, Feb. 2008, Electric Reliability Council of Texas (ERCOT).
    • Proc. Wind Impact Task Force Meeting
  • 5
    • 49249095955 scopus 로고    scopus 로고
    • Security-constrained unit commitment with volatile wind power generation
    • Jul.
    • J. Wang, M. Shahidehpour, and Z. Li, "Security-constrained unit commitment with volatile wind power generation, " IEEE Trans. Power Syst., vol. 23, no. 3, pp. 1319-1327, Jul. 2008.
    • (2008) IEEE Trans. Power Syst. , vol.23 , Issue.3 , pp. 1319-1327
    • Wang, J.1    Shahidehpour, M.2    Li, Z.3
  • 7
    • 13344293626 scopus 로고    scopus 로고
    • Executive overview: Energy storage options for a sustainable energy future
    • 2004 IEEE Power Engineering Society General Meeting
    • R. B. Schainker, "Executive overview: Energy storage options for a sustainable energy future, " in Proc. 2004 IEEE Power Engineering Society General Meeting, Jun. 2004, vol. 2, pp. 2309-2314. (Pubitemid 40197110)
    • (2004) 2004 IEEE Power Engineering Society General Meeting , vol.2 , pp. 2309-2314
    • Schainker, R.B.1
  • 10
    • 76649106403 scopus 로고    scopus 로고
    • Short-term trading for a wind power producer
    • Feb
    • J. M. Morales, A. J. Conejo, and J. Perez-Ruiz, "Short-term trading for a wind power producer, " IEEE Trans. Power Syst., vol. 25, no. 1, pp. 554-564, Feb. 2010.
    • (2010) IEEE Trans. Power Syst. , vol.25 , Issue.1 , pp. 554-564
    • Morales, J.M.1    Conejo, A.J.2    Perez-Ruiz, J.3
  • 12
    • 67349249985 scopus 로고    scopus 로고
    • Economic valuation of reserves in power systems with high penetration of wind power
    • May
    • J. M. Morales, A. J. Conejo, and J. Perez-Ruiz, "Economic valuation of reserves in power systems with high penetration of wind power, " IEEE Trans. Power Syst., vol. 24, no. 2, pp. 900-910, May 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.2 , pp. 900-910
    • Morales, J.M.1    Conejo, A.J.2    Perez-Ruiz, J.3
  • 13
    • 33645659220 scopus 로고    scopus 로고
    • The future of wind forecasting and utility operations
    • Nov./Dec.
    • M. Ahlstrom, L. Jones, R. Zavadil, and W. Grant, "The future of wind forecasting and utility operations, " IEEE Power Energy Mag., vol. 3, no. 6, pp. 57-64, Nov./Dec. 2005.
    • (2005) IEEE Power Energy Mag. , vol.3 , Issue.6 , pp. 57-64
    • Ahlstrom, M.1    Jones, L.2    Zavadil, R.3    Grant, W.4
  • 14
    • 2542593940 scopus 로고    scopus 로고
    • Pumped-storage hydro-turbine bidding strategies in a competitive electricity market
    • May
    • N. Lu, J. H. Chow, and A. A. Desrochers, "Pumped-storage hydro-turbine bidding strategies in a competitive electricity market, " IEEE Trans. Power Syst., vol. 19, no. 2, pp. 834-841, May 2004.
    • (2004) IEEE Trans. Power Syst. , vol.19 , Issue.2 , pp. 834-841
    • Lu, N.1    Chow, J.H.2    Desrochers, A.A.3
  • 15
    • 4043118236 scopus 로고    scopus 로고
    • On the optimization of the daily operation of a wind-hydro power plant
    • Aug.
    • E. D. Castronuovo and J. A. P. Lopes, "On the optimization of the daily operation of a wind-hydro power plant, " IEEE Trans. Power Syst., vol. 19, no. 3, pp. 1599-1606, Aug. 2004.
    • (2004) IEEE Trans. Power Syst. , vol.19 , Issue.3 , pp. 1599-1606
    • Castronuovo, E.D.1    Lopes, J.A.P.2
  • 16
    • 43849086803 scopus 로고    scopus 로고
    • Stochastic joint optimization of wind generation and pumped-storage units in an electricity market
    • DOI 10.1109/TPWRS.2008.919430
    • J. Garcia-Gonzalez, R. M. R. de la Muela, L. M. Santos, and A. M. Gonzalez, "Stochastic joint optimization of wind generation and pumped-storage units in an electricity market, " IEEE Trans. Power Syst., vol. 23, no. 2, pp. 460-468, May 2008. (Pubitemid 351695825)
    • (2008) IEEE Transactions on Power Systems , vol.23 , Issue.2 , pp. 460-468
    • Garcia-Gonzalez, J.1    De La Muela, R.M.R.2    Santos, L.M.3    Gonzalez, A.M.4
  • 18
    • 14344264580 scopus 로고    scopus 로고
    • Grid impacts of wind power: A summary of recent studies in the United States
    • DOI 10.1002/we.111
    • B. Parson, M. Milligan, B. Zavadil, D. Brooks, B. Kirby, K. Dragoon, and J. Caldwell, "Grid impacts of wind power: A summary of recent studies in the united states, " Wind Energy, vol. 7, no. 2, pp. 87-108, May 2004. (Pubitemid 40290419)
    • (2004) Wind Energy , vol.7 , Issue.2 , pp. 87-108
    • Parsons, B.1    Milligan, M.2    Zavadil, B.3    Brooks, D.4    Kirby, B.5    Dragoon, K.6    Caldwell, J.7
  • 20
    • 28244479344 scopus 로고    scopus 로고
    • Price-based unit commitment: A case of Lagrangian relaxation versus mixed integer programming
    • DOI 10.1109/TPWRS.2005.857391
    • T. Li and M. Shahidehpour, "Price-based unit commitment: A case of lagrangian relaxation versus mixed integer programming, " IEEE Trans. Power Syst., vol. 20, no. 4, pp. 2015-2025, Nov. 2005. (Pubitemid 41700555)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.4 , pp. 2015-2025
    • Li, T.1    Shahidehpour, M.2
  • 21
    • 67349107331 scopus 로고    scopus 로고
    • Unit commitment risk analysis of wind integrated power systems
    • May
    • R. Billinton, B. Karki, R. Karki, and G. Ramakrishna, "Unit commitment risk analysis of wind integrated power systems, " IEEE Trans. Power Syst., vol. 24, no. 2, pp. 930-939, May 2009.
    • (2009) IEEE Trans. Power Syst. , vol.24 , Issue.2 , pp. 930-939
    • Billinton, R.1    Karki, B.2    Karki, R.3    Ramakrishna, G.4
  • 24
    • 14544296200 scopus 로고    scopus 로고
    • Simulation of wind speed forecast errors for operation planning of multiarea power systems
    • Sep. 12-16
    • L. Söder, "Simulation of wind speed forecast errors for operation planning of multiarea power systems, " in Proc. 2004 Int. Conf. Probabilistic Methods Applied to Power Systems, Sep. 12-16, 2004, pp. 723-728.
    • (2004) Proc. 2004 Int. Conf. Probabilistic Methods Applied to Power Systems , pp. 723-728
    • Söder, L.1
  • 26
    • 84880081257 scopus 로고    scopus 로고
    • ISO New England five-minute LMPs historical data [Online]
    • ISO New England five-minute LMPs historical data [Online]. Available: http://www.iso-ne.com/markets/hst-rpts/hstRpts.do?cate-gory=Fivemin
  • 27
    • 34248512634 scopus 로고    scopus 로고
    • Stochastic security-constrained unit commitment
    • DOI 10.1109/TPWRS.2007.894843
    • L. Wu, M. Shahidehpour, and T. Li, "Stochastic security-constrained unit commitment, " IEEE Trans. Power Syst., vol. 22, no. 2, pp. 800-811, May 2007. (Pubitemid 46746244)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.2 , pp. 800-811
    • Wu, L.1    Shahidehpour, M.2    Li, T.3
  • 28
    • 39749084088 scopus 로고    scopus 로고
    • GENCO's risk-based maintenance outage scheduling
    • DOI 10.1109/TPWRS.2007.913295
    • L. Wu, M. Shahidehpour, and T. Li, "GENCO's risk-based maintenance outage scheduling, " IEEE Trans. Power Syst., vol. 23, no. 1, pp. 127-136, Feb. 2008. (Pubitemid 351292097)
    • (2008) IEEE Transactions on Power Systems , vol.23 , Issue.1 , pp. 127-136
    • Wu, L.1    Shahidehpour, M.2    Li, T.3
  • 29
    • 33751071102 scopus 로고    scopus 로고
    • Scenario reduction in stochastic programming An approach using probability metrics
    • DOI 10.1007/s10107-002-0331-0
    • J. Dupacová, N. Gröwe-Kuska, and W. Römisch, "Scenario reduction in stochastic programming: An approach using probability metrics, " Math. Program., ser. A 95, pp. 493-511, 2003. (Pubitemid 44769765)
    • (2003) Mathematical Programming, Series B , vol.95 , Issue.3 , pp. 493-511
    • Dupacova, J.1    Growe-Kuska, N.2    Romisch, W.3
  • 30
    • 84880056365 scopus 로고    scopus 로고
    • GAMS/SCENRED Documentation, [Online]
    • GAMS/SCENRED Documentation, [Online]. Available: http://www. gams.com/docs/document.htm
  • 33
    • 77954834555 scopus 로고    scopus 로고
    • Sharing of profit from coordinated operation planning and bidding of hydro and wind power
    • Aug
    • M. Zima-Bockarjova, J. Matevoysan, M. Zima, and L. Söder, "Sharing of profit from coordinated operation planning and bidding of hydro and wind power, " IEEE Trans. Power Syst., vol. 25, no. 3, pp. 1663-1673, Aug. 2010.
    • (2010) IEEE Trans. Power Syst. , vol.25 , Issue.3 , pp. 1663-1673
    • Zima-Bockarjova, M.1    Matevoysan, J.2    Zima, M.3    Söder, L.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.