메뉴 건너뛰기




Volumn 24, Issue 2, 2009, Pages 930-939

Unit commitment risk analysis of wind integrated power systems

Author keywords

Load carrying capability; Operating capacity; Risk assessment; Wind power probability models

Indexed keywords

AUTOREGRESSIVE MOVING AVERAGE; BASIC CONCEPTS; GENERATING CAPACITY; INHERENT VARIABILITY; INTEGRATED POWER SYSTEMS; LOAD CARRYING CAPABILITY; OPERATING CAPACITY; POWER GENERATING SYSTEMS; POWER OUT PUT; TEST SYSTEMS; TIME SERIES MODELS; UNIT COMMITMENTS; WIND POWER GENERATING; WIND SPEED;

EID: 67349107331     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2009.2016485     Document Type: Article
Times cited : (89)

References (41)
  • 1
    • 84991301486 scopus 로고    scopus 로고
    • Online, Available
    • NERC/WECC Planning Standards. [Online]. Available: http://www.wecc.biz/ documents/library/procedures/ WECC_Reliability_Criteria_definitions_8-02.pdf
    • NERC/WECC Planning Standards
  • 3
    • 33947319093 scopus 로고    scopus 로고
    • Considering load-carrying capability and wind speed correlation of WECS in generation adequacy assessment
    • Sep
    • W. Wangdee and R. Billinton, "Considering load-carrying capability and wind speed correlation of WECS in generation adequacy assessment," IEEE Trans. Energy Convers., vol. 21, no. 3, pp. 734-741, Sep. 2006.
    • (2006) IEEE Trans. Energy Convers , vol.21 , Issue.3 , pp. 734-741
    • Wangdee, W.1    Billinton, R.2
  • 4
    • 49249086737 scopus 로고    scopus 로고
    • Population-based intelligent search in reliability evaluation of generation systems with wind power penetration
    • Aug
    • L. Wang and C. Singh, "Population-based intelligent search in reliability evaluation of generation systems with wind power penetration," IEEE Trans. Power Syst., vol. 23, no. 3, pp. 1336-1345, Aug. 2008.
    • (2008) IEEE Trans. Power Syst , vol.23 , Issue.3 , pp. 1336-1345
    • Wang, L.1    Singh, C.2
  • 6
    • 0037292303 scopus 로고    scopus 로고
    • Online risk-based security assessment
    • Feb
    • M. Ni, J. D. McCalley, V. Vittal, and T. Tayyib, "Online risk-based security assessment," IEEE Trans. Power Syst., vol. 18, no. 1, pp. 258-265, Feb. 2003.
    • (2003) IEEE Trans. Power Syst , vol.18 , Issue.1 , pp. 258-265
    • Ni, M.1    McCalley, J.D.2    Vittal, V.3    Tayyib, T.4
  • 7
    • 0028371902 scopus 로고
    • Unit commitment literature synopsis
    • Feb
    • G. B. Sheble and G. N. Fahd, "Unit commitment literature synopsis," IEEE Trans. Power Syst., vol. 9, no. 1, pp. 128-135, Feb. 1994.
    • (1994) IEEE Trans. Power Syst , vol.9 , Issue.1 , pp. 128-135
    • Sheble, G.B.1    Fahd, G.N.2
  • 8
    • 2542598480 scopus 로고    scopus 로고
    • Unit commitment - a bibliographical survey
    • May
    • N. P. Padhy, "Unit commitment - a bibliographical survey," IEEE Trans. Power Syst., vol. 19, no. 2, pp. 1196-1205, May 2004.
    • (2004) IEEE Trans. Power Syst , vol.19 , Issue.2 , pp. 1196-1205
    • Padhy, N.P.1
  • 9
    • 46149096962 scopus 로고    scopus 로고
    • Comparison of practical unit commitment problem solutions
    • I. J. Raglend and N. P. Padhy, "Comparison of practical unit commitment problem solutions," Elect. Power Compon. Syst., vol. 36, no. 8, pp. 844-863, 2008.
    • (2008) Elect. Power Compon. Syst , vol.36 , Issue.8 , pp. 844-863
    • Raglend, I.J.1    Padhy, N.P.2
  • 10
    • 38749084550 scopus 로고    scopus 로고
    • Short-term scheduling of thermal units: Emission constraints and trade-off curves
    • J. P. S. Catalao, S. J. P. Mariano, V. M. F. Mendes, and L. A. F. Ferreira, "Short-term scheduling of thermal units: Emission constraints and trade-off curves," Eur. Trans. Elect. Power, vol. 18, no. 1, pp. 1-14, 2008.
    • (2008) Eur. Trans. Elect. Power , vol.18 , Issue.1 , pp. 1-14
    • Catalao, J.P.S.1    Mariano, S.J.P.2    Mendes, V.M.F.3    Ferreira, L.A.F.4
  • 11
    • 40849089324 scopus 로고    scopus 로고
    • Optimal wind-thermal generating unit commitment
    • Mar
    • C.-L. Chen, "Optimal wind-thermal generating unit commitment," IEEE Trans. Energy Convers., vol. 23, no. 1, pp. 273-280, Mar. 2008.
    • (2008) IEEE Trans. Energy Convers , vol.23 , Issue.1 , pp. 273-280
    • Chen, C.-L.1
  • 12
    • 36749022145 scopus 로고    scopus 로고
    • An integration of ANN wind power estimation into unit commitment considering the forecasting uncertainty
    • Nov.-Dec
    • K. Methaprayoon, C. Yingvivatanapong, W.-J. Lee, and J. R. Liao, "An integration of ANN wind power estimation into unit commitment considering the forecasting uncertainty," IEEE Trans. Ind. Appl., vol. 43, no. 6, pp. 1441-1448, Nov.-Dec. 2007.
    • (2007) IEEE Trans. Ind. Appl , vol.43 , Issue.6 , pp. 1441-1448
    • Methaprayoon, K.1    Yingvivatanapong, C.2    Lee, W.-J.3    Liao, J.R.4
  • 13
    • 36348943626 scopus 로고    scopus 로고
    • Optimal spinning reserve for a wind-thermal power system using EIPSO
    • Nov
    • T.-Y. Lee, "Optimal spinning reserve for a wind-thermal power system using EIPSO," IEEE Trans. Power Syst., vol. 22, no. 4, pp. 1612-1621, Nov. 2007.
    • (2007) IEEE Trans. Power Syst , vol.22 , Issue.4 , pp. 1612-1621
    • Lee, T.-Y.1
  • 14
    • 49249086942 scopus 로고    scopus 로고
    • Cost of reliability analysis based on stochastic unit commitment
    • Aug
    • L. Wu, M. Shahidehpour, and T. Li, "Cost of reliability analysis based on stochastic unit commitment," IEEE Trans. Power Syst., vol. 23, no. 3, pp. 1364-1374, Aug. 2008.
    • (2008) IEEE Trans. Power Syst , vol.23 , Issue.3 , pp. 1364-1374
    • Wu, L.1    Shahidehpour, M.2    Li, T.3
  • 15
    • 49249095955 scopus 로고    scopus 로고
    • Security-constrained unit commitment with volatile wind power generation
    • Aug
    • J. Wang, M. Shahidehpour, and Z. Li, "Security-constrained unit commitment with volatile wind power generation," IEEE Trans. Power Syst., vol. 23, no. 3, pp. 1319-1327, Aug. 2008.
    • (2008) IEEE Trans. Power Syst , vol.23 , Issue.3 , pp. 1319-1327
    • Wang, J.1    Shahidehpour, M.2    Li, Z.3
  • 16
    • 0015330713 scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation
    • Mar
    • R. Billinton, "Bibliography on the application of probability methods in power system reliability evaluation," IEEE Trans. Power App. Syst., vol. PAS-91, no. 2, pp. 649-660, Mar. 1972.
    • (1972) IEEE Trans. Power App. Syst , vol.PAS-91 , Issue.2 , pp. 649-660
    • Billinton, R.1
  • 17
    • 0018032476 scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation 1971-1977
    • IEEE-PES APM Subcommittee, Nov
    • IEEE-PES APM Subcommittee, "Bibliography on the application of probability methods in power system reliability evaluation 1971-1977," IEEE Trans. Power App. Syst., vol. PAS-97, no. 6, pp. 2235-2242, Nov. 1978.
    • (1978) IEEE Trans. Power App. Syst , vol.PAS-97 , Issue.6 , pp. 2235-2242
  • 18
    • 0024103858 scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation: 1982-1987
    • Nov
    • R. N. Allan, R. Billinton, S. M. Shahidehpour, and C. Singh, "Bibliography on the application of probability methods in power system reliability evaluation: 1982-1987," IEEE Trans. Power Syst., vol. 3, no. 4, pp. 1555-1564, Nov. 1988.
    • (1988) IEEE Trans. Power Syst , vol.3 , Issue.4 , pp. 1555-1564
    • Allan, R.N.1    Billinton, R.2    Shahidehpour, S.M.3    Singh, C.4
  • 19
    • 84937657196 scopus 로고
    • Application of probability methods to the determination of spinning reserve requirements for the Pennsylvania-New Jersey-Maryland interconnection
    • Oct
    • L. T. Anstine, R. E. Burke, J. E. Casey, R. Holgate, R. S. John, and H. G. Stewart, "Application of probability methods to the determination of spinning reserve requirements for the Pennsylvania-New Jersey-Maryland interconnection," IEEE Trans. Power App. Syst., vol. PAS-82, no. 68, pp. 726-735, Oct. 1963.
    • (1963) IEEE Trans. Power App. Syst , vol.PAS-82 , Issue.68 , pp. 726-735
    • Anstine, L.T.1    Burke, R.E.2    Casey, J.E.3    Holgate, R.4    John, R.S.5    Stewart, H.G.6
  • 20
    • 67349226562 scopus 로고
    • Spinning reserve criteria in a hydro thermal system by the application of probability mathematics
    • R. Billinton and M. P. Musick, "Spinning reserve criteria in a hydro thermal system by the application of probability mathematics," Eng. J., vol. 48, no. 10, pp. 40-45, 1965.
    • (1965) Eng. J , vol.48 , Issue.10 , pp. 40-45
    • Billinton, R.1    Musick, M.P.2
  • 21
    • 0015316250 scopus 로고
    • The effect of rapid start and hot reserve units in spinning reserve studies
    • Mar
    • R. Billinton and A. V. Jain, "The effect of rapid start and hot reserve units in spinning reserve studies," IEEE Trans. Power App. Syst., vol. PAS-91, no. 2, pp. 511-516, Mar. 1972.
    • (1972) IEEE Trans. Power App. Syst , vol.PAS-91 , Issue.2 , pp. 511-516
    • Billinton, R.1    Jain, A.V.2
  • 22
    • 0015315893 scopus 로고
    • Interconnected system spinning reserve requirements
    • Mar
    • R. Billinton and A. V. Jain, "Interconnected system spinning reserve requirements," IEEE Trans. Power App. Syst., vol. PAS-91, no. 2, pp. 517-525, Mar. 1972.
    • (1972) IEEE Trans. Power App. Syst , vol.PAS-91 , Issue.2 , pp. 517-525
    • Billinton, R.1    Jain, A.V.2
  • 23
    • 0015094397 scopus 로고
    • Unit derating levels in spinning reserve studies
    • Jul
    • R. Billinton and A. V. Jain, "Unit derating levels in spinning reserve studies," IEEE Trans. Power App. Syst., vol. PAS-90, no. 4, pp. 1677-1687, Jul. 1971.
    • (1971) IEEE Trans. Power App. Syst , vol.PAS-90 , Issue.4 , pp. 1677-1687
    • Billinton, R.1    Jain, A.V.2
  • 24
    • 0034186776 scopus 로고    scopus 로고
    • Impact of load management on composite system reliability evaluation short-term operating benefits
    • May
    • M. Fotuhi-Firuzabad and R. Billinton, "Impact of load management on composite system reliability evaluation short-term operating benefits," IEEE Trans. Power Syst., vol. 15, no. 2, pp. 858-864, May 2000.
    • (2000) IEEE Trans. Power Syst , vol.15 , Issue.2 , pp. 858-864
    • Fotuhi-Firuzabad, M.1    Billinton, R.2
  • 25
    • 0028482457 scopus 로고
    • Generating system operating health analysis considering stand-by units, interruptible load and postponable outages
    • Aug
    • R. Billinton and M. Fotuhi-Firuzabad, "Generating system operating health analysis considering stand-by units, interruptible load and postponable outages," IEEE Trans. Power Syst., vol. 9, no. 3, pp. 1618-1625, Aug. 1994.
    • (1994) IEEE Trans. Power Syst , vol.9 , Issue.3 , pp. 1618-1625
    • Billinton, R.1    Fotuhi-Firuzabad, M.2
  • 26
    • 0034298498 scopus 로고    scopus 로고
    • A reliability framework for generating unit commitment
    • R. Billinton and M. Fotuhi-Firuzabad, "A reliability framework for generating unit commitment," Elect. Power Syst. Res., vol. 56, no. 1, pp. 81-88, 2000.
    • (2000) Elect. Power Syst. Res , vol.56 , Issue.1 , pp. 81-88
    • Billinton, R.1    Fotuhi-Firuzabad, M.2
  • 28
    • 33947655421 scopus 로고    scopus 로고
    • Impacts of wind power on thermal generation unit commitment and dispatch
    • Mar
    • B. C. Ummels, M. Gibescu, E. Pelgrum, W. L. Kling, and A. J. Brand, "Impacts of wind power on thermal generation unit commitment and dispatch," IEEE Trans. Energy Convers., vol. 22, no. 1, pp. 44-51, Mar. 2007.
    • (2007) IEEE Trans. Energy Convers , vol.22 , Issue.1 , pp. 44-51
    • Ummels, B.C.1    Gibescu, M.2    Pelgrum, E.3    Kling, W.L.4    Brand, A.J.5
  • 31
    • 0028667890 scopus 로고
    • Short-term prediction of local wind conditions
    • L. Landberg and S. J. Watson, "Short-term prediction of local wind conditions," Bound.-Layer Meteorol., vol. 70, no. 1, pp. 171-195, 1994.
    • (1994) Bound.-Layer Meteorol , vol.70 , Issue.1 , pp. 171-195
    • Landberg, L.1    Watson, S.J.2
  • 32
    • 0035280497 scopus 로고    scopus 로고
    • Short-term prediction of local wind conditions
    • L. Landberg, "Short-term prediction of local wind conditions," J. Wind Eng. Ind. Aerodynam., vol. 89, no. 3, pp. 235-245, 2001.
    • (2001) J. Wind Eng. Ind. Aerodynam , vol.89 , Issue.3 , pp. 235-245
    • Landberg, L.1
  • 33
    • 36049028805 scopus 로고    scopus 로고
    • Simulation of short-term wind speed forecast errors using a multi-variate ARMA(1,1) time-series model,
    • M.Sc. thesis, Royal Inst. Technol, Stockholm, Sweden
    • A. Boone, "Simulation of short-term wind speed forecast errors using a multi-variate ARMA(1,1) time-series model,"M.Sc. thesis, Royal Inst. Technol., Stockholm, Sweden, 2005.
    • (2005)
    • Boone, A.1
  • 36
    • 13844260429 scopus 로고    scopus 로고
    • The State-of-the-Art in Short-Term Prediction of Wind Power - A Literature Overview
    • Tech. Rep. Project Anemos, Contract No. ENK5-CT-2002-00665, Online, Available
    • G. Giebel, R. Brownsword, and G. Kariniotakis, The State-of-the-Art in Short-Term Prediction of Wind Power - A Literature Overview, Tech. Rep. Project Anemos, Contract No. ENK5-CT-2002-00665. [Online]. Available: http://anemos.cma.fr/download/ANEMOS_D1.1_StateOfTheArt_v1.1.pdf.
    • Giebel, G.1    Brownsword, R.2    Kariniotakis, G.3
  • 38
    • 40849147501 scopus 로고    scopus 로고
    • One day ahead prediction of wind speed and direction
    • Mar
    • T. H. M. El-Fouly, E. F. El-Saadany, and M. M. A. Salama, "One day ahead prediction of wind speed and direction," IEEE Trans. Energy Convers., vol. 23, no. 1, pp. 191-201, Mar. 2008.
    • (2008) IEEE Trans. Energy Convers , vol.23 , Issue.1 , pp. 191-201
    • El-Fouly, T.H.M.1    El-Saadany, E.F.2    Salama, M.M.A.3
  • 39
    • 0030241740 scopus 로고    scopus 로고
    • Time-series models for reliability evaluation of power systems including wind energy
    • R. Billinton, H. Chen, and R. Ghajar, "Time-series models for reliability evaluation of power systems including wind energy," Microelectron. Reliab., vol. 36, no. 9, pp. 1253-1261, 1996.
    • (1996) Microelectron. Reliab , vol.36 , Issue.9 , pp. 1253-1261
    • Billinton, R.1    Chen, H.2    Ghajar, R.3
  • 40
    • 33947301794 scopus 로고    scopus 로고
    • Reliability-based transmission reinforcement planning associated with large-scale wind farms
    • Feb
    • R. Billinton and W. Wangdee, "Reliability-based transmission reinforcement planning associated with large-scale wind farms," IEEE Trans. Power Syst., vol. 22, no. 1, pp. 34-41, Feb. 2007.
    • (2007) IEEE Trans. Power Syst , vol.22 , Issue.1 , pp. 34-41
    • Billinton, R.1    Wangdee, W.2
  • 41
    • 0020497503 scopus 로고
    • Development of a new procedure for reliability modeling of wind turbine generators
    • Jan
    • P. Giorsetto and K. F. Utsurogi, "Development of a new procedure for reliability modeling of wind turbine generators," IEEE Trans. Power App. Syst., vol. PAS-102, no. 1, pp. 134-143, Jan. 1983.
    • (1983) IEEE Trans. Power App. Syst , vol.PAS-102 , Issue.1 , pp. 134-143
    • Giorsetto, P.1    Utsurogi, K.F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.