Volumn 64, Issue 8, 2013, Pages 1118-1136

A Benders decomposition algorithm for a multi-area, multi-stage integrated resource planning in power systems

Author keywords

Benders decomposition; composite generation and transmission planning; demand side management; integrated resource planning; power systems

Indexed keywords

DEMAND SIDE MANAGEMENT; ECONOMICS; ELECTRIC POWER TRANSMISSION; ELECTRIC UTILITIES; INTEGER PROGRAMMING; LINEARIZATION; NONLINEAR PROGRAMMING; RESOURCE ALLOCATION; STANDBY POWER SYSTEMS; STOCHASTIC PROGRAMMING;

EID: 84879680576     PISSN: 01605682     EISSN: 14769360     Source Type: Journal    
DOI: 10.1057/jors.2012.142     Document Type: Article
Times cited : (9)

References (39)
  • 3
    • 0842333988 scopus 로고    scopus 로고
    • A multiple objective mixed integer linear programming model for power generation expansion planning
    • Antunes CH, Martins AG and Brito IS (2004). A multiple objective mixed integer linear programming model for power generation expansion planning. Energy 29(4): 613-627
    • (2004) Energy , vol.29 , Issue.4 , pp. 613-627
    • Antunes, C.H.1    Martins, A.G.2    Brito, I.S.3
  • 4
    • 42749088183 scopus 로고    scopus 로고
    • Multi-objective optimization for capacity expansion of regional power-generation systems: Case study of far west Texas
    • Becerra-Lopez HR and Golding P (2008). Multi-objective optimization for capacity expansion of regional power-generation systems: Case study of far west Texas. Energy Conversion and Management 49(6): 1433-1445
    • (2008) Energy Conversion and Management , vol.49 , Issue.6 , pp. 1433-1445
    • Becerra-Lopez, H.R.1    Golding, P.2
  • 5
    • 9644308639 scopus 로고
    • Partitioning methods for solving mixed-variables programming problems
    • Benders JF (1962). Partitioning methods for solving mixed-variables programming problems. Numerische Mathematik 4(4): 238-252
    • (1962) Numerische Mathematik , vol.4 , Issue.4 , pp. 238-252
    • Benders, J.F.1
  • 6
    • 0035339650 scopus 로고    scopus 로고
    • A new Benders decomposition approach to solve power transmission network design problems
    • Binato S, Veiga M, Pereira F and Granville S (2001). A new Benders decomposition approach to solve power transmission network design problems. IEEE Transactions on Power Systems 16(2): 235-240
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.2 , pp. 235-240
    • Binato, S.1    Veiga, M.2    Pereira, F.3    Granville, S.4
  • 7
    • 43849112156 scopus 로고    scopus 로고
    • Congestion-driven transmission planning considering the impact of generator expansion
    • Bulent Tor O, Nezih Guven A and Shahidehpour M (2008). Congestion-driven transmission planning considering the impact of generator expansion. IEEE Transactions on Power Systems 23(2): 781-789
    • (2008) IEEE Transactions on Power Systems , vol.23 , Issue.2 , pp. 781-789
    • Bulent Tor, O.1    Nezih Guven, A.2    Shahidehpour, M.3
  • 10
    • 41849131850 scopus 로고    scopus 로고
    • Combined generation and transmission system expansion planning using implicit enumeration and linear programming technique. IE(I
    • Das PK, Chanda RS and Bhattacharjee PK (2005). Combined generation and transmission system expansion planning using implicit enumeration and linear programming technique. IE(I) Journal-EL 86(1): 110-116
    • (2005) Journal-EL , vol.86 , Issue.1 , pp. 110-116
    • Das, P.K.1    Chanda, R.S.2    Bhattacharjee, P.K.3
  • 11
    • 0022134368 scopus 로고
    • Demand side management alternatives
    • Delgado RM (1985). Demand side management alternatives. IEEE Conference 73(10): 1471-1489
    • (1985) IEEE Conference , vol.73 , Issue.10 , pp. 1471-1489
    • Delgado, R.M.1
  • 12
    • 0022132650 scopus 로고
    • The concept of demand-side management for electric utilities
    • Gellings CW (1985). The concept of demand-side management for electric utilities. IEEE Conference 73(10): 1468-1470
    • (1985) IEEE Conference , vol.73 , Issue.10 , pp. 1468-1470
    • Gellings, C.W.1
  • 13
  • 14
    • 0001281946 scopus 로고
    • Optimisation methods for electric utility resource planning
    • Hobbs BF (1995). Optimisation methods for electric utility resource planning. European Journal of Operational Research 83(1): 1-20
    • (1995) European Journal of Operational Research , vol.83 , Issue.1 , pp. 1-20
    • Hobbs, B.F.1
  • 15
    • 38049012935 scopus 로고    scopus 로고
    • A portfolio risk analysis on electricity supply planning
    • Huang YH and Wu JH (2008). A portfolio risk analysis on electricity supply planning. Energy Policy 36(2): 627-641
    • (2008) Energy Policy , vol.36 , Issue.2 , pp. 627-641
    • Huang, Y.H.1    Wu, J.H.2
  • 17
    • 13844311440 scopus 로고    scopus 로고
    • Application and comparison of metaheuristic techniques to generation expansion planning problem
    • IEEE
    • Kannan S, Slochanal SMR and Padhy NP (2005). Application and comparison of metaheuristic techniques to generation expansion planning problem. IEEE Transactions on Power Systems 20(1): 466-475
    • (2005) Transactions on Power Systems , vol.20 , Issue.1 , pp. 466-475
    • Kannan, S.1    Slochanal, S.M.R.2    Padhy, N.P.3
  • 19
    • 13544249630 scopus 로고    scopus 로고
    • Developing concurrent investment plans for power generation and transmission
    • Kucukyazici B, Ozdamar L and Pokharel S (2005). Developing concurrent investment plans for power generation and transmission. European Journal of Operational Research 166(2): 449-468
    • (2005) European Journal of Operational Research , vol.166 , Issue.2 , pp. 449-468
    • Kucukyazici, B.1    Ozdamar, L.2    Pokharel, S.3
  • 20
    • 0035917421 scopus 로고    scopus 로고
    • Application of network topology to long range composite expansion planning of generation and transmission lines
    • Liu G, Sasaki H and Yorino N (2001). Application of network topology to long range composite expansion planning of generation and transmission lines. Electric Power Systems Research 57(3): 157-162
    • (2001) Electric Power Systems Research , vol.57 , Issue.3 , pp. 157-162
    • Liu, G.1    Sasaki, H.2    Yorino, N.3
  • 21
    • 0041784238 scopus 로고    scopus 로고
    • Transmission-constrained unit commitment based on Benders decomposition
    • Ma H and Shahidehpour M (1998). Transmission-constrained unit commitment based on Benders decomposition. Electrical Power and Energy Systems 20(4): 287-294
    • (1998) Electrical Power and Energy Systems , vol.20 , Issue.4 , pp. 287-294
    • Ma, H.1    Shahidehpour, M.2
  • 22
    • 0035371648 scopus 로고    scopus 로고
    • Modeling and economic analysis of DSM programs in generation planning
    • Malik AS (2001). Modeling and economic analysis of DSM programs in generation planning. Electrical Power and Energy Systems 23(5): 413-419
    • (2001) Electrical Power and Energy Systems , vol.23 , Issue.5 , pp. 413-419
    • Malik, A.S.1
  • 23
    • 34548495141 scopus 로고    scopus 로고
    • Impact on power planning due to demand-side management (DSM) in commercial and government sectors with rebound effect - A case study of central grid of Oman
    • Malik AS (2007). Impact on power planning due to demand-side management (DSM) in commercial and government sectors with rebound effect - A case study of central grid of Oman. Energy 32(11): 2157-2166
    • (2007) Energy , vol.32 , Issue.11 , pp. 2157-2166
    • Malik, A.S.1
  • 24
    • 34248592608 scopus 로고    scopus 로고
    • A model for the multiperiod multiobjective power generation expansion problem
    • Meza JLC, Yildirim MB and Masud ASM (2007). A model for the multiperiod multiobjective power generation expansion problem. IEEE Transactions on Power Systems 22(2): 871-878
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.2 , pp. 871-878
    • Meza, J.L.C.1    Yildirim, M.B.2    Masud, A.S.M.3
  • 25
    • 59349107948 scopus 로고    scopus 로고
    • NSGA-II algorithm for multi-objective generation expansion planning problem
    • Murugan P, Kannan S and Baskar S (2009). NSGA-II algorithm for multi-objective generation expansion planning problem. Electric Power Systems Research 79(4): 622-628
    • (2009) Electric Power Systems Research , vol.79 , Issue.4 , pp. 622-628
    • Murugan, P.1    Kannan, S.2    Baskar, S.3
  • 28
    • 68349128690 scopus 로고    scopus 로고
    • A multiyear security constrained hybrid generation-transmission expansion planning algorithm including fuel supply costs
    • Sepasian MS, Seifi H, Akbari Foroud A and Hatami AR (2009). A multiyear security constrained hybrid generation-transmission expansion planning algorithm including fuel supply costs. IEEE Transactions on Power Systems 24(3): 1609-1618
    • (2009) IEEE Transactions on Power Systems , vol.24 , Issue.3 , pp. 1609-1618
    • Sepasian, M.S.1    Seifi, H.2    Akbari Foroud, A.3    Hatami, A.R.4
  • 29
    • 16244405919 scopus 로고    scopus 로고
    • Benders decomposition: Applying Benders decomposition to power systems
    • Shahidehpour M and Fu Y (2005). Benders decomposition: Applying Benders decomposition to power systems. IEEE Power Energy Magazine 3(2): 20-21
    • (2005) IEEE Power Energy Magazine , vol.3 , Issue.2 , pp. 20-21
    • Shahidehpour, M.1    Fu, Y.2
  • 30
    • 17044405536 scopus 로고    scopus 로고
    • Fuzzy financial analyses of demand-side management alternatives
    • Sheen JN (2005). Fuzzy financial analyses of demand-side management alternatives. IEE Proceedings - Generation, Transmission, Distribution 152(2): 215-226
    • (2005) IEE Proceedings-Generation, Transmission, Distribution , vol.152 , Issue.2 , pp. 215-226
    • Sheen, J.N.1
  • 31
    • 34548042336 scopus 로고    scopus 로고
    • A new efficient GA-Benders' decomposition method: For power generation expansion planning with emission controls
    • Sirikum J, Techanitisawad A and Kachitvichyanukul V (2007). A new efficient GA-Benders' decomposition method: For power generation expansion planning with emission controls. IEEE Transactions on Power Systems 22(3): 1092-1100
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.3 , pp. 1092-1100
    • Sirikum, J.1    Techanitisawad, A.2    Kachitvichyanukul, V.3
  • 33
    • 0042731780 scopus 로고    scopus 로고
    • CO2 mitigation and power generation implications of clean supplyside and demand-side technologies in Thailand
    • Tanatvanit S, Limmeechokchai B and Shrestha RM (2004). CO2 mitigation and power generation implications of clean supplyside and demand-side technologies in Thailand. Energy Policy 32(1): 83-90
    • (2004) Energy Policy , vol.32 , Issue.1 , pp. 83-90
    • Tanatvanit, S.1    Limmeechokchai, B.2    Shrestha, R.M.3
  • 34
    • 84886730015 scopus 로고    scopus 로고
    • An improved Benders decomposition algorithm for the logistics facility location problem with capacity expansions
    • DOI 10.1007/s10479-011-1050-9
    • Tang L, JiangWand Saharidis GKD (2012). An improved Benders decomposition algorithm for the logistics facility location problem with capacity expansions. Annals of Operation Research. DOI 10.1007/s10479-011-1050-9
    • (2012) Annals of Operation Research
    • Tang, L.1    Jiang, W.2    Saharidis, G.K.D.3
  • 36
    • 78650920420 scopus 로고    scopus 로고
    • Multistage expansion planning of generation and interconnections with sustainable energy development criteria: A multiobjective model
    • Unsihuay-Vila C, Marangon-Lima JW, Souza ACZ and Perez- Arriaga IJ (2011). Multistage expansion planning of generation and interconnections with sustainable energy development criteria: A multiobjective model. Electrical Power and Energy Systems 33(2): 258-270
    • (2011) Electrical Power and Energy Systems , vol.33 , Issue.2 , pp. 258-270
    • Unsihuay-Vila, C.1    Marangon-Lima, J.W.2    Souza, A.C.Z.3    Perez- Arriaga, I.J.4
  • 37
    • 36549014721 scopus 로고    scopus 로고
    • Benders decomposition with alternative multiple cuts for a multi-product closed-loop supply chain network design model
    • Üster H, Easwaran G, Akçali E and Çetinkaya S (2007). Benders decomposition with alternative multiple cuts for a multi-product closed-loop supply chain network design model. Naval Research Logistics 54(8): 890-907
    • (2007) Naval Research Logistics , vol.54 , Issue.8 , pp. 890-907
    • Üster, H.1    Easwaran, G.2    Akçali, E.3    Çetinkaya, S.4
  • 38
    • 33947642663 scopus 로고    scopus 로고
    • Demand matching wind power generation with wide-area measurement and demandside management
    • Westermann D and John A (2007). Demand matching wind power generation with wide-area measurement and demandside management. IEEE Transaction on Energy Conversion 22(1): 145-149
    • (2007) IEEE Transaction on Energy Conversion , vol.22 , Issue.1 , pp. 145-149
    • Westermann, D.1    John, A.2
  • 39
    • 77954027380 scopus 로고    scopus 로고
    • Impact of demand side management on composite generation and transmission system reliability
    • Baoding, China, October 29-November 1
    • Zhou M, Li G and Zhang P (2006). Impact of demand side management on composite generation and transmission system reliability. PSCE conference 819-824, Baoding, China, October 29-November 1
    • (2006) PSCE conference , pp. 819-824
    • Zhou, M.1    Li, G.2    Zhang, P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.