-
3
-
-
0842333988
-
A multiple objective mixed integer linear programming model for power generation expansion planning
-
Antunes CH, Martins AG and Brito IS (2004). A multiple objective mixed integer linear programming model for power generation expansion planning. Energy 29(4): 613-627
-
(2004)
Energy
, vol.29
, Issue.4
, pp. 613-627
-
-
Antunes, C.H.1
Martins, A.G.2
Brito, I.S.3
-
4
-
-
42749088183
-
Multi-objective optimization for capacity expansion of regional power-generation systems: Case study of far west Texas
-
Becerra-Lopez HR and Golding P (2008). Multi-objective optimization for capacity expansion of regional power-generation systems: Case study of far west Texas. Energy Conversion and Management 49(6): 1433-1445
-
(2008)
Energy Conversion and Management
, vol.49
, Issue.6
, pp. 1433-1445
-
-
Becerra-Lopez, H.R.1
Golding, P.2
-
5
-
-
9644308639
-
Partitioning methods for solving mixed-variables programming problems
-
Benders JF (1962). Partitioning methods for solving mixed-variables programming problems. Numerische Mathematik 4(4): 238-252
-
(1962)
Numerische Mathematik
, vol.4
, Issue.4
, pp. 238-252
-
-
Benders, J.F.1
-
6
-
-
0035339650
-
A new Benders decomposition approach to solve power transmission network design problems
-
Binato S, Veiga M, Pereira F and Granville S (2001). A new Benders decomposition approach to solve power transmission network design problems. IEEE Transactions on Power Systems 16(2): 235-240
-
(2001)
IEEE Transactions on Power Systems
, vol.16
, Issue.2
, pp. 235-240
-
-
Binato, S.1
Veiga, M.2
Pereira, F.3
Granville, S.4
-
7
-
-
43849112156
-
Congestion-driven transmission planning considering the impact of generator expansion
-
Bulent Tor O, Nezih Guven A and Shahidehpour M (2008). Congestion-driven transmission planning considering the impact of generator expansion. IEEE Transactions on Power Systems 23(2): 781-789
-
(2008)
IEEE Transactions on Power Systems
, vol.23
, Issue.2
, pp. 781-789
-
-
Bulent Tor, O.1
Nezih Guven, A.2
Shahidehpour, M.3
-
10
-
-
41849131850
-
Combined generation and transmission system expansion planning using implicit enumeration and linear programming technique. IE(I
-
Das PK, Chanda RS and Bhattacharjee PK (2005). Combined generation and transmission system expansion planning using implicit enumeration and linear programming technique. IE(I) Journal-EL 86(1): 110-116
-
(2005)
Journal-EL
, vol.86
, Issue.1
, pp. 110-116
-
-
Das, P.K.1
Chanda, R.S.2
Bhattacharjee, P.K.3
-
11
-
-
0022134368
-
Demand side management alternatives
-
Delgado RM (1985). Demand side management alternatives. IEEE Conference 73(10): 1471-1489
-
(1985)
IEEE Conference
, vol.73
, Issue.10
, pp. 1471-1489
-
-
Delgado, R.M.1
-
12
-
-
0022132650
-
The concept of demand-side management for electric utilities
-
Gellings CW (1985). The concept of demand-side management for electric utilities. IEEE Conference 73(10): 1468-1470
-
(1985)
IEEE Conference
, vol.73
, Issue.10
, pp. 1468-1470
-
-
Gellings, C.W.1
-
14
-
-
0001281946
-
Optimisation methods for electric utility resource planning
-
Hobbs BF (1995). Optimisation methods for electric utility resource planning. European Journal of Operational Research 83(1): 1-20
-
(1995)
European Journal of Operational Research
, vol.83
, Issue.1
, pp. 1-20
-
-
Hobbs, B.F.1
-
15
-
-
38049012935
-
A portfolio risk analysis on electricity supply planning
-
Huang YH and Wu JH (2008). A portfolio risk analysis on electricity supply planning. Energy Policy 36(2): 627-641
-
(2008)
Energy Policy
, vol.36
, Issue.2
, pp. 627-641
-
-
Huang, Y.H.1
Wu, J.H.2
-
17
-
-
13844311440
-
Application and comparison of metaheuristic techniques to generation expansion planning problem
-
IEEE
-
Kannan S, Slochanal SMR and Padhy NP (2005). Application and comparison of metaheuristic techniques to generation expansion planning problem. IEEE Transactions on Power Systems 20(1): 466-475
-
(2005)
Transactions on Power Systems
, vol.20
, Issue.1
, pp. 466-475
-
-
Kannan, S.1
Slochanal, S.M.R.2
Padhy, N.P.3
-
20
-
-
0035917421
-
Application of network topology to long range composite expansion planning of generation and transmission lines
-
Liu G, Sasaki H and Yorino N (2001). Application of network topology to long range composite expansion planning of generation and transmission lines. Electric Power Systems Research 57(3): 157-162
-
(2001)
Electric Power Systems Research
, vol.57
, Issue.3
, pp. 157-162
-
-
Liu, G.1
Sasaki, H.2
Yorino, N.3
-
21
-
-
0041784238
-
Transmission-constrained unit commitment based on Benders decomposition
-
Ma H and Shahidehpour M (1998). Transmission-constrained unit commitment based on Benders decomposition. Electrical Power and Energy Systems 20(4): 287-294
-
(1998)
Electrical Power and Energy Systems
, vol.20
, Issue.4
, pp. 287-294
-
-
Ma, H.1
Shahidehpour, M.2
-
22
-
-
0035371648
-
Modeling and economic analysis of DSM programs in generation planning
-
Malik AS (2001). Modeling and economic analysis of DSM programs in generation planning. Electrical Power and Energy Systems 23(5): 413-419
-
(2001)
Electrical Power and Energy Systems
, vol.23
, Issue.5
, pp. 413-419
-
-
Malik, A.S.1
-
23
-
-
34548495141
-
Impact on power planning due to demand-side management (DSM) in commercial and government sectors with rebound effect - A case study of central grid of Oman
-
Malik AS (2007). Impact on power planning due to demand-side management (DSM) in commercial and government sectors with rebound effect - A case study of central grid of Oman. Energy 32(11): 2157-2166
-
(2007)
Energy
, vol.32
, Issue.11
, pp. 2157-2166
-
-
Malik, A.S.1
-
24
-
-
34248592608
-
A model for the multiperiod multiobjective power generation expansion problem
-
Meza JLC, Yildirim MB and Masud ASM (2007). A model for the multiperiod multiobjective power generation expansion problem. IEEE Transactions on Power Systems 22(2): 871-878
-
(2007)
IEEE Transactions on Power Systems
, vol.22
, Issue.2
, pp. 871-878
-
-
Meza, J.L.C.1
Yildirim, M.B.2
Masud, A.S.M.3
-
25
-
-
59349107948
-
NSGA-II algorithm for multi-objective generation expansion planning problem
-
Murugan P, Kannan S and Baskar S (2009). NSGA-II algorithm for multi-objective generation expansion planning problem. Electric Power Systems Research 79(4): 622-628
-
(2009)
Electric Power Systems Research
, vol.79
, Issue.4
, pp. 622-628
-
-
Murugan, P.1
Kannan, S.2
Baskar, S.3
-
27
-
-
34547759758
-
Multi-voltage approach to long-term network expansion planning
-
Seifi H, Sepasian MS, Haghighat H, Foroud AA, Yousefi GR and Rae S (2007). Multi-voltage approach to long-term network expansion planning. IET Generation, Transmission, Distribution 1(5): 826-835
-
(2007)
IET Generation, Transmission, Distribution
, vol.1
, Issue.5
, pp. 826-835
-
-
Seifi, H.1
Sepasian, M.S.2
Haghighat, H.3
Foroud, A.A.4
Yousefi, G.R.5
Rae, S.6
-
28
-
-
68349128690
-
A multiyear security constrained hybrid generation-transmission expansion planning algorithm including fuel supply costs
-
Sepasian MS, Seifi H, Akbari Foroud A and Hatami AR (2009). A multiyear security constrained hybrid generation-transmission expansion planning algorithm including fuel supply costs. IEEE Transactions on Power Systems 24(3): 1609-1618
-
(2009)
IEEE Transactions on Power Systems
, vol.24
, Issue.3
, pp. 1609-1618
-
-
Sepasian, M.S.1
Seifi, H.2
Akbari Foroud, A.3
Hatami, A.R.4
-
29
-
-
16244405919
-
Benders decomposition: Applying Benders decomposition to power systems
-
Shahidehpour M and Fu Y (2005). Benders decomposition: Applying Benders decomposition to power systems. IEEE Power Energy Magazine 3(2): 20-21
-
(2005)
IEEE Power Energy Magazine
, vol.3
, Issue.2
, pp. 20-21
-
-
Shahidehpour, M.1
Fu, Y.2
-
30
-
-
17044405536
-
Fuzzy financial analyses of demand-side management alternatives
-
Sheen JN (2005). Fuzzy financial analyses of demand-side management alternatives. IEE Proceedings - Generation, Transmission, Distribution 152(2): 215-226
-
(2005)
IEE Proceedings-Generation, Transmission, Distribution
, vol.152
, Issue.2
, pp. 215-226
-
-
Sheen, J.N.1
-
31
-
-
34548042336
-
A new efficient GA-Benders' decomposition method: For power generation expansion planning with emission controls
-
Sirikum J, Techanitisawad A and Kachitvichyanukul V (2007). A new efficient GA-Benders' decomposition method: For power generation expansion planning with emission controls. IEEE Transactions on Power Systems 22(3): 1092-1100
-
(2007)
IEEE Transactions on Power Systems
, vol.22
, Issue.3
, pp. 1092-1100
-
-
Sirikum, J.1
Techanitisawad, A.2
Kachitvichyanukul, V.3
-
33
-
-
0042731780
-
CO2 mitigation and power generation implications of clean supplyside and demand-side technologies in Thailand
-
Tanatvanit S, Limmeechokchai B and Shrestha RM (2004). CO2 mitigation and power generation implications of clean supplyside and demand-side technologies in Thailand. Energy Policy 32(1): 83-90
-
(2004)
Energy Policy
, vol.32
, Issue.1
, pp. 83-90
-
-
Tanatvanit, S.1
Limmeechokchai, B.2
Shrestha, R.M.3
-
34
-
-
84886730015
-
An improved Benders decomposition algorithm for the logistics facility location problem with capacity expansions
-
DOI 10.1007/s10479-011-1050-9
-
Tang L, JiangWand Saharidis GKD (2012). An improved Benders decomposition algorithm for the logistics facility location problem with capacity expansions. Annals of Operation Research. DOI 10.1007/s10479-011-1050-9
-
(2012)
Annals of Operation Research
-
-
Tang, L.1
Jiang, W.2
Saharidis, G.K.D.3
-
35
-
-
77951667593
-
A model to long-term, multiarea, multistage, and integrated expansion planning of electricity and natural gas systems
-
Unsihuay-Vila C, Marangon-Lima JW, Souza ACZ, Perez-Arriaga IJ and Balestrassi PP (2010). A model to long-term, multiarea, multistage, and integrated expansion planning of electricity and natural gas systems. IEEE Transactions on Power Systems 25(2): 1154-1168
-
(2010)
IEEE Transactions on Power Systems
, vol.25
, Issue.2
, pp. 1154-1168
-
-
Unsihuay-Vila, C.1
Marangon-Lima, J.W.2
Souza, A.C.Z.3
Perez-Arriaga, I.J.4
Balestrassi, P.P.5
-
36
-
-
78650920420
-
Multistage expansion planning of generation and interconnections with sustainable energy development criteria: A multiobjective model
-
Unsihuay-Vila C, Marangon-Lima JW, Souza ACZ and Perez- Arriaga IJ (2011). Multistage expansion planning of generation and interconnections with sustainable energy development criteria: A multiobjective model. Electrical Power and Energy Systems 33(2): 258-270
-
(2011)
Electrical Power and Energy Systems
, vol.33
, Issue.2
, pp. 258-270
-
-
Unsihuay-Vila, C.1
Marangon-Lima, J.W.2
Souza, A.C.Z.3
Perez- Arriaga, I.J.4
-
37
-
-
36549014721
-
Benders decomposition with alternative multiple cuts for a multi-product closed-loop supply chain network design model
-
Üster H, Easwaran G, Akçali E and Çetinkaya S (2007). Benders decomposition with alternative multiple cuts for a multi-product closed-loop supply chain network design model. Naval Research Logistics 54(8): 890-907
-
(2007)
Naval Research Logistics
, vol.54
, Issue.8
, pp. 890-907
-
-
Üster, H.1
Easwaran, G.2
Akçali, E.3
Çetinkaya, S.4
-
38
-
-
33947642663
-
Demand matching wind power generation with wide-area measurement and demandside management
-
Westermann D and John A (2007). Demand matching wind power generation with wide-area measurement and demandside management. IEEE Transaction on Energy Conversion 22(1): 145-149
-
(2007)
IEEE Transaction on Energy Conversion
, vol.22
, Issue.1
, pp. 145-149
-
-
Westermann, D.1
John, A.2
-
39
-
-
77954027380
-
Impact of demand side management on composite generation and transmission system reliability
-
Baoding, China, October 29-November 1
-
Zhou M, Li G and Zhang P (2006). Impact of demand side management on composite generation and transmission system reliability. PSCE conference 819-824, Baoding, China, October 29-November 1
-
(2006)
PSCE conference
, pp. 819-824
-
-
Zhou, M.1
Li, G.2
Zhang, P.3
|