-
1
-
-
69449084420
-
Composite materials for commercial transport - issues and future research direction
-
W. Lafayette, IN
-
th Technical Conference, W. Lafayette, IN, 2002.
-
(2002)
th Technical Conference
-
-
Stickler, P.1
-
2
-
-
0026153207
-
Manufacturing costs for advanced composites aerospace parts
-
Gutowski T, Henderson R and Shipp C. Manufacturing costs for advanced composites aerospace parts. SAMPE Journal, Vol. 27, No. 3, 1991.
-
(1991)
SAMPE Journal
, vol.27
, Issue.3
-
-
Gutowski, T.1
Henderson, R.2
Shipp, C.3
-
4
-
-
84878905313
-
Aerospace product cost management at the early concept operations phase.
-
Anchorage, Alaska, September 14-19, AIAA Paper No. 2008-094
-
Curran R, Gilmour M, McAlleenan C and Kelly P. Aerospace product cost management at the early concept operations phase. The 26h Congress of International Council of the Aeronautical Sciences (ICAS), Anchorage, Alaska, September 14-19, AIAA Paper No. 2008-094, 2008.
-
(2008)
The 26h Congress of International Council of the Aeronautical Sciences (ICAS)
-
-
Curran, R.1
Gilmour, M.2
McAlleenan, C.3
Kelly, P.4
-
5
-
-
0029699930
-
Toward manufacturing and cost consideration in multidisciplinary aircraft design.
-
Salt Lake City, UT, pp. 2606-2612, April 15 - 17
-
Rais-Rohani M and Dean E B. Toward manufacturing and cost consideration in multidisciplinary aircraft design. 37th AIAA/ASME/ASCE/AHS/ASC Structures, Dynamics and Materials Conference and Exhibit, Salt Lake City, UT, pp. 2606-2612, April 15 - 17, 1996.
-
(1996)
37th AIAA/ASME/ASCE/AHS/ASC Structures, Dynamics and Materials Conference and Exhibit
-
-
Rais-Rohani, M.1
Dean, E.B.2
-
6
-
-
84983111391
-
Integrated product/process design/development (IPPD) through robust design simulation
-
Los Angeles, CA, AIAA Paper No. 95-3892, September 19-21
-
Schrage D P and Mavris D N. Integrated product/process design/development (IPPD) through robust design simulation. The 1st AIAA Aircraft Engineering, Technology and Operations Congress, Los Angeles, CA, AIAA Paper No. 95-3892, September 19-21, 1995.
-
(1995)
The 1st AIAA Aircraft Engineering, Technology and Operations Congress
-
-
Schrage, D.P.1
Mavris, D.N.2
-
7
-
-
85086615425
-
Fabrication and assembly cost drivers for aircraft manufacturing
-
Denver, Colorado, AIAA Paper No. 2003-6827, November 17-19
-
Crosby S, Kundu A K, Curran R and Raghunathan S. Fabrication and assembly cost drivers for aircraft manufacturing. The 3rd Annual Aviation Technology Integration, and Operations Conference (ATIO), Denver, Colorado, AIAA Paper No. 2003-6827, November 17-19, 2003.
-
(2003)
The 3rd Annual Aviation Technology Integration, and Operations Conference (ATIO)
-
-
Crosby, S.1
Kundu, A.K.2
Curran, R.3
Raghunathan, S.4
-
8
-
-
4444287020
-
The multi-disciplinary design of a large-scale civil aircraft wing taking account of manufacturing costs
-
August
-
Gantois K and Morris A J. The multi-disciplinary design of a large-scale civil aircraft wing taking account of manufacturing costs. Structural and Multidisciplinary Optimization, Vol. 28, No. 1, pp 31-46, August, 2001, .
-
(2001)
Structural and Multidisciplinary Optimization
, vol.28
, Issue.1
, pp. 31-46
-
-
Gantois, K.1
Morris, A.J.2
-
11
-
-
79959739010
-
Handbook of computer aided geometric design.
-
Farin G, Hoschek J and Kim M S. Handbook of computer aided geometric design. Elsevier Science, pp. 519-520, 2002.
-
(2002)
Elsevier Science
, pp. 519-520
-
-
Farin, G.1
Hoschek, J.2
Kim, M.S.3
-
12
-
-
0004200761
-
Aircraft performance and design
-
McGraw-Hill
-
Anderson J D. Aircraft performance and design. McGraw-Hill, 1999.
-
(1999)
-
-
Anderson, J.D.1
-
14
-
-
84880786606
-
A Parametric, Preliminary Structural Analysis and Optimization Approach with Manufacturing Cost Considerations
-
rd Structures, Structural Dynamics, and Materials and Co-located Conferences, Honolulu, Hawaii, April 17
-
rd Structures, Structural Dynamics, and Materials and Co-located Conferences, Honolulu, Hawaii, April 17, 2012.
-
(2012)
-
-
Lee, M.1
Ceisel, J.2
Liu, Z.3
Mavris, D.4
-
15
-
-
84878951403
-
Parametric Production Planning and Scheduling Optimization for Preliminary Design
-
28th Congress, ICAS, Brisbane, Australia, September
-
C. Sundaresan, Z. Tang, J. Ceisel, D. Mavris, "Parametric Production Planning and Scheduling Optimization for Preliminary Design," 28th Congress, ICAS, Brisbane, Australia, September 2012.
-
(2012)
-
-
Sundaresan, C.1
Tang, Z.2
Ceisel, J.3
Mavris, D.4
-
16
-
-
80052073518
-
A Probabilistic Risk-Based Methodology for Manufacturing Influenced Aircraft Design
-
Long Beach, CA, May 23
-
R. Combier, J. Ceisel, Z. Liu, D. Mavris, "A Probabilistic Risk-Based Methodology for Manufacturing Influenced Aircraft Design", SAMPE 2011 Conference, Long Beach, CA, May 23, 2011.
-
(2011)
SAMPE 2011 Conference
-
-
Combier, R.1
Ceisel, J.2
Liu, Z.3
Mavris, D.4
-
17
-
-
33750479859
-
Extension of the TOPSIS method for decision-making problems with fuzzy data
-
G. Jahanshahloo, F. Lotfi, M. Izadikhah, "Extension of the TOPSIS method for decision-making problems with fuzzy data", Applied Mathematics and Computation, 181 (2006) 1544-1551.
-
(2006)
Applied Mathematics and Computation
, vol.181
, pp. 1544-1551
-
-
Jahanshahloo, G.1
Lotfi, F.2
Izadikhah, M.3
|