-
1
-
-
54849143400
-
-
Carnegie Mellon University, Software Engineering Institute, Pittsburgh, Pa
-
CMMI® for Development, Version 1.2, CMU/SEI-2006-TR- 008, ESC-TR-2006-008. Carnegie Mellon University, Software Engineering Institute, Pittsburgh, Pa., 2006.
-
(2006)
CMMI® for Development, Version 1.2, CMU/SEI-2006-TR- 008, ESC-TR-2006-008
-
-
-
2
-
-
33947217417
-
Software project management with gas
-
Alba, E. and Chicano, J. F. Software Project Management with GAs. Journal of Information Sciences, 177, 11 2007), 2380-2401.
-
(2007)
Journal of Information Sciences
, vol.177
, Issue.11
, pp. 2380-2401
-
-
Alba, E.1
Chicano, J.F.2
-
4
-
-
0025791156
-
Software risk management: Principles and practices
-
Boehm, B. Software risk management: principles and practices. IEEE Software, 8, 1 1991), 32 - 41.
-
(1991)
IEEE Software
, vol.8
, Issue.1
, pp. 32-41
-
-
Boehm, B.1
-
6
-
-
49549099773
-
Timeline based model for software project scheduling with genetic algorithms
-
Chang, C. K., Jiang, H.-y., Di, Y., Zhu, D. and Ge, Y. Timeline based model for software project scheduling with genetic algorithms. Information and Software Technology, 50, 11 2008), 1142-1154.
-
(2008)
Information and Software Technology
, vol.50
, Issue.11
, pp. 1142-1154
-
-
Chang, C.K.1
Jiang, H.-Y.2
Di, Y.3
Zhu, D.4
Ge, Y.5
-
8
-
-
84878444434
-
-
City
-
Freimut, B., Hartkopf, S., Kontio, J. and Kobitzsch, W. An Industrial Case Study of Implementing Software Risk Management. City, 2001.
-
(2001)
An Industrial Case Study of Implementing Software Risk Management
-
-
Freimut, B.1
Hartkopf, S.2
Kontio, J.3
Kobitzsch, W.4
-
13
-
-
38749119736
-
A bi-objective genetic algorithm approach to risk mitigation in project scheduling
-
Kilic, M., Ulusoy, G. n. z. and lu, F. S. S.-e. A bi-objective genetic algorithm approach to risk mitigation in project scheduling. International Journal of Production Economics, 1122008), 202-216.
-
International Journal of Production Economics, 1122008
, pp. 202-216
-
-
Kilic, M.1
Ulusoy, G.N.Z.2
Lu, F.S.S.-E.3
-
14
-
-
35348918836
-
-
LASER. UM-CS-2006-51, Laboratory for Advanced Software Engineering Research, University of Massachusetts
-
LASER. Little-JIL 1.5 Language Report. UM-CS-2006-51, Laboratory for Advanced Software Engineering Research, University of Massachusetts, 2006.
-
(2006)
Little-JIL 1.5 Language Report
-
-
-
15
-
-
84857564432
-
An integrated risk measurement and optimization model for trustworthy software process management
-
Li, J., Li, M., Wu, D. and Song, H. An integrated risk measurement and optimization model for trustworthy software process management. Information Sciences, 1912012), 47-60.
-
Information Sciences, 1912012
, pp. 47-60
-
-
Li, J.1
Li, M.2
Wu, D.3
Song, H.4
-
18
-
-
77955433085
-
Disruption- driven resource rescheduling in software development processes
-
Xiao, J., Osterweil, L. J., Wang, Q. and Li, M. Disruption- Driven Resource Rescheduling in Software Development Processes. Proceedings of International Conference on Software Process, LNCS61952010), 234-247.
-
Proceedings of International Conference on Software Process, LNCS61952010
, pp. 234-247
-
-
Xiao, J.1
Osterweil, L.J.2
Wang, Q.3
Li, M.4
-
19
-
-
79952832808
-
-
City
-
Xiao, J., Wang, Q., Li, M., Yang, Q., Xie, L. and Liu, D. Value-based Multiple Software Projects Scheduling with Genetic Algorithm. City, 2009.
-
(2009)
Value-based Multiple Software Projects Scheduling with Genetic Algorithm
-
-
Xiao, J.1
Wang, Q.2
Li, M.3
Yang, Q.4
Xie, L.5
Liu, D.6
-
20
-
-
33746890233
-
Optimizing software process based on risk assessment and control
-
Xu, R., Nie, P., Sai, Y., Qu, L. and Lee, Y. Optimizing Software Process Based On Risk Assessment and Control. Proceedings of the 2005 The Fifth International Conference on Computer and Information Technology (CIT'05)2005).
-
(2005)
Proceedings of the 2005 the Fifth International Conference on Computer and Information Technology (CIT'05)
-
-
Xu, R.1
Nie, P.2
Sai, Y.3
Qu, L.4
Lee, Y.5
-
21
-
-
42949161020
-
Using a risk-based approach to project scheduling: A case illustration from semiconductor manufacturing
-
Zafra-Cabeza, A., Ridao, M. A. and Camacho, E. F. Using A Risk-Based Approach to Project Scheduling: A Case Illustration from Semiconductor Manufacturing. European Journal of Operation Research, 1902008), 708-723.
-
European Journal of Operation Research, 1902008
, pp. 708-723
-
-
Zafra-Cabeza, A.1
Ridao, M.A.2
Camacho, E.F.3
|