메뉴 건너뛰기




Volumn 53, Issue 1, 2013, Pages 382-389

Evaluation of a payments proposal for blackstart services in the Colombian electricity system: A system dynamics approach

Author keywords

Keywords Ancillary services Blackstart service Power system restoration System dynamics

Indexed keywords

BLACK START; ELECTRICAL POWER SYSTEM; ELECTRICITY SECTOR; ELECTRICITY SYSTEM; INSTALLED CAPACITY; PLANNING HORIZONS; SYSTEM DYNAMICS APPROACH; SYSTEM DYNAMICS MODEL;

EID: 84878374427     PISSN: 01420615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijepes.2013.05.006     Document Type: Article
Times cited : (8)

References (28)
  • 3
    • 79952007346 scopus 로고    scopus 로고
    • Analysis of major failures in Europés power grid
    • M. Rosas-Casals, and R. Solé Analysis of major failures in Europés power grid Int J Electr Power Syst 33 2011 805 808
    • (2011) Int J Electr Power Syst , vol.33 , pp. 805-808
    • Rosas-Casals, M.1    Solé, R.2
  • 5
    • 13344293630 scopus 로고    scopus 로고
    • New Strategies to improve bulk power system security: Lessons learned from large blackouts
    • IEEE, Colorado; USA
    • Gomes P. New Strategies to improve bulk power system security: lessons learned from large blackouts. In: Power Engineering Society General Meeting, IEEE, Colorado; USA; 2004.
    • (2004) Power Engineering Society General Meeting
    • Gomes, P.1
  • 6
    • 0028369622 scopus 로고
    • Power system restoration planning
    • M.M. Adibi, and L. Fink Power system restoration planning IEEE Trans Power Syst 9 1 1994 21 28
    • (1994) IEEE Trans Power Syst , vol.9 , Issue.1 , pp. 21-28
    • Adibi, M.M.1    Fink, L.2
  • 7
    • 84878363949 scopus 로고    scopus 로고
    • Comisión de Regulación de Energía y Gas; 1995
    • CREG resolution 025. Comisión de Regulación de Energía y Gas; 1995. .
    • CREG Resolution 025
  • 9
    • 0344550456 scopus 로고    scopus 로고
    • Allocating the costs of contingency reserves
    • DOI 10.1016/j.tej.2003.09.009, PII S1040619003001581
    • B. Kirby, and E. Hirts Allocating the costs of contingency reserves Electr J 16 10 2003 39 47 (Pubitemid 37468917)
    • (2003) Electricity Journal , vol.16 , Issue.10 , pp. 39-47
    • Kirby, B.1    Hirst, E.2
  • 13
    • 84878354955 scopus 로고    scopus 로고
    • PJM Interconnection, 2012. < http://www.pjm.com/markets-and- operations/ancillary-services/~/media/documents/manuals/m27.ashx.pdf >.
    • (2012) PJM Interconnection
  • 14
    • 84864075195 scopus 로고    scopus 로고
    • Maximizing restorable load amount for specific substation during system restoration
    • H. Qu, and Y. Liu Maximizing restorable load amount for specific substation during system restoration Int J Electr Power Energy Syst 43 2012 1213 1220
    • (2012) Int J Electr Power Energy Syst , vol.43 , pp. 1213-1220
    • Qu, H.1    Liu, Y.2
  • 16
    • 0026447058 scopus 로고
    • Sensitivity of reserve margin to factors influencing investment behavior in the electricity market of England & Wales
    • D. Bunn, and E. Larsen Sensitivity of reserve margin to factors influencing investment behavior in the electricity market of England & Wales Energy Policy 20 5 1992 420 429
    • (1992) Energy Policy , vol.20 , Issue.5 , pp. 420-429
    • Bunn, D.1    Larsen, E.2
  • 17
    • 0025453416 scopus 로고    scopus 로고
    • Estimating the impact of efficiency standards on the uncertainty of the Northwest electricity system
    • A. Ford Estimating the impact of efficiency standards on the uncertainty of the Northwest electricity system Oper Res 38 4 1999 580 597
    • (1999) Oper Res , vol.38 , Issue.4 , pp. 580-597
    • Ford, A.1
  • 18
    • 34548427318 scopus 로고    scopus 로고
    • Simulation of alternative regulations in the Colombian electricity market
    • DOI 10.1016/j.seps.2006.06.004, PII S0038012106000255
    • S. Arango Simulation for alternative regulation options in the Colombian electricity market Socio-Econom Plan Sci 41 4 2007 305 319 (Pubitemid 47355018)
    • (2007) Socio-Economic Planning Sciences , vol.41 , Issue.4 , pp. 305-319
    • Arango, S.1
  • 20
    • 79953315738 scopus 로고    scopus 로고
    • Cycles in deregulated electricity markets: Empirical evidence from two decades
    • A. Arango, and E. Larsen Cycles in deregulated electricity markets: empirical evidence from two decades Energy Policy 39 5 2011 2457 2466
    • (2011) Energy Policy , vol.39 , Issue.5 , pp. 2457-2466
    • Arango, A.1    Larsen, E.2
  • 21
    • 0001022016 scopus 로고    scopus 로고
    • Formal aspects of model validity and validation in system dynamics
    • Y. Barlas Formal aspects of model validity and validation in system dynamics Syst Dyn Rev 12 3 1996 183 210 (Pubitemid 126646439)
    • (1996) System Dynamics Review , vol.12 , Issue.3 , pp. 183-210
    • Barlas, Y.1
  • 22
    • 80051544471 scopus 로고    scopus 로고
    • Performance and reliability of electrical power grids under cascading failures
    • L. Chang, and Z. Wu Performance and reliability of electrical power grids under cascading failures Int J Electr Power Syst 33 2011 1410 1419
    • (2011) Int J Electr Power Syst , vol.33 , pp. 1410-1419
    • Chang, L.1    Wu, Z.2
  • 26
    • 33645898325 scopus 로고    scopus 로고
    • Technical and economic aspects of ancillary services markets in electric power industry: An international comparison
    • R. Raineri, S. Ríos, and D. Schiele Technical and economic aspects of ancillary services markets in electric power industry: an international comparison Energy policy 34 13 2006 1540 1555
    • (2006) Energy Policy , vol.34 , Issue.13 , pp. 1540-1555
    • Raineri, R.1    Ríos, S.2    Schiele, D.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.