메뉴 건너뛰기




Volumn 7, Issue 2, 2013, Pages 223-236

A solution to the unit commitment problem-a review

Author keywords

deterministic load; evolutionary programming (EP); hybrid; optimization; stochastic load; unit commitment (UC)

Indexed keywords


EID: 84878324970     PISSN: 20951701     EISSN: 20951698     Source Type: Journal    
DOI: 10.1007/s11708-013-0240-3     Document Type: Review
Times cited : (165)

References (71)
  • 2
    • 18944363874 scopus 로고    scopus 로고
    • Unit commitment with flexible generating units
    • Lu B, Shahidehpour M. Unit commitment with flexible generating units. IEEE Transactions on Power Systems, 2005, 20(2): 1022-1034.
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.2 , pp. 1022-1034
    • Lu, B.1    Shahidehpour, M.2
  • 6
    • 84965031247 scopus 로고    scopus 로고
    • Time constrain optimal method to find the minimum architectures for feedforward neural networks
    • L. P. Wang, J. C. Rajapakse, K. Fukeshima, S. Y. Lee, and X. Yao (Eds.)
    • Tan T S, Huang G B. Time constrain optimal method to find the minimum architectures for feedforward neural networks. In: Wang L P, Rajapakse J C, Fukeshima K, Lee S Y, Yao X, eds. Proceedings of 9th International Conference on Neural Information Processing (ICONIP'02). Singapore, 2002.
    • (2002) Proceedings of 9th International Conference on Neural Information Processing (ICONIP'02)
    • Tan, T.S.1    Huang, G.B.2
  • 9
    • 0001173632 scopus 로고
    • An automatic method of solving discrete programming problems
    • Land A H, Doig A G. An automatic method of solving discrete programming problems. Econometrica, 1960, 28(3): 497-520.
    • (1960) Econometrica , vol.28 , Issue.3 , pp. 497-520
    • Land, A.H.1    Doig, A.G.2
  • 13
    • 0037291017 scopus 로고    scopus 로고
    • Simulated annealing with local search-A hybrid algorithm for unit commitment
    • Purushothama G K, Jenkins L. Simulated annealing with local search-A hybrid algorithm for unit commitment. IEEE Transactions on Power Systems, 2003, 18(1): 273-278.
    • (2003) IEEE Transactions on Power Systems , vol.18 , Issue.1 , pp. 273-278
    • Purushothama, G.K.1    Jenkins, L.2
  • 17
    • 0031635908 scopus 로고    scopus 로고
    • New parallel tabu search for voltage and reactive power control in power systems
    • Monterey, USA
    • Mori H, Hayashi T. New parallel tabu search for voltage and reactive power control in power systems. In: Proceedings of IEEE ISCAS'98. Monterey, USA, 1998, 431-434.
    • (1998) Proceedings of IEEE ISCAS'98 , pp. 431-434
    • Mori, H.1    Hayashi, T.2
  • 19
    • 0026206115 scopus 로고
    • An intelligent dynamic programming for unit commitment application
    • Ouyang Z, Shahidehpour SM. An intelligent dynamic programming for unit commitment application. IEEE Transactions on Power Systems, 1991, 6(3): 1203-1209.
    • (1991) IEEE Transactions on Power Systems , vol.6 , Issue.3 , pp. 1203-1209
    • Ouyang, Z.1    Shahidehpour, S.M.2
  • 24
    • 0013089420 scopus 로고    scopus 로고
    • Thermal generating unit commitment using an extended mean field annealing neural network
    • Liang R H, Kang F C. Thermal generating unit commitment using an extended mean field annealing neural network. IEEE Proceedings on Generation Transmission Distribution, 2000, 147(3): 164-170.
    • (2000) IEEE Proceedings on Generation Transmission Distribution , vol.147 , Issue.3 , pp. 164-170
    • Liang, R.H.1    Kang, F.C.2
  • 25
    • 0031272594 scopus 로고    scopus 로고
    • Augmented hopfield network for unit commitment and economic dispatch
    • Walsh M P, O'Malley M J. Augmented hopfield network for unit commitment and economic dispatch. IEEE Transactions on Power Systems, 1997, 12(4): 1765-1774.
    • (1997) IEEE Transactions on Power Systems , vol.12 , Issue.4 , pp. 1765-1774
    • Walsh, M.P.1    O'Malley, M.J.2
  • 37
    • 63049113733 scopus 로고    scopus 로고
    • A solution to the unit commitment using hybrid genetic algorithm
    • Hyderabad, India
    • Chang W P, Luo X J. A solution to the unit commitment using hybrid genetic algorithm. In: Proceedings of 2008 IEEE Region 10 Conference, Hyderabad, India, 2008, 1-6.
    • (2008) Proceedings of 2008 IEEE Region 10 Conference , pp. 1-6
    • Chang, W.P.1    Luo, X.J.2
  • 41
    • 33244474874 scopus 로고    scopus 로고
    • Shuffled frog-leaping algorithm: A memetic meta-heuristic for discrete optimization
    • Eusuff M M, Lansey K E, Pasha F. Shuffled frog-leaping algorithm: A memetic meta-heuristic for discrete optimization. Engineering Optimization, 2006, 38(2): 129-154.
    • (2006) Engineering Optimization , vol.38 , Issue.2 , pp. 129-154
    • Eusuff, M.M.1    Lansey, K.E.2    Pasha, F.3
  • 42
    • 84870341022 scopus 로고    scopus 로고
    • A novel algorithm unit commitment problem by a fuzzy tuned particle swarm optimization
    • Kumar C, Alwarsamy T. A novel algorithm unit commitment problem by a fuzzy tuned particle swarm optimization. European Journal of Scientific Research, 2011, 64(1): 157-167.
    • (2011) European Journal of Scientific Research , vol.64 , Issue.1 , pp. 157-167
    • Kumar, C.1    Alwarsamy, T.2
  • 43
    • 80052266825 scopus 로고    scopus 로고
    • A new memetic algorithm approach for the price based unit commitment problem
    • Dimitroulas D K, Georgilakis P S. A new memetic algorithm approach for the price based unit commitment problem. Applied Energy, 2011, 88(12): 4687-4699.
    • (2011) Applied Energy , vol.88 , Issue.12 , pp. 4687-4699
    • Dimitroulas, D.K.1    Georgilakis, P.S.2
  • 45
    • 28244479344 scopus 로고    scopus 로고
    • Price based unit commitment: a case of Langrangian relaxation versus mixed integer programming
    • Li T, Shahidehpour M. Price based unit commitment: a case of Langrangian relaxation versus mixed integer programming. IEEE Transactions on Power Systems, 2005, 20(4): 2015-2025.
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.4 , pp. 2015-2025
    • Li, T.1    Shahidehpour, M.2
  • 47
    • 0034186741 scopus 로고    scopus 로고
    • A profit-based unit commitment GA for the competitive environment
    • Richter C W, Sheble G B. A profit-based unit commitment GA for the competitive environment. IEEE Transactions on Power Systems, 2000, 15(2): 715-721.
    • (2000) IEEE Transactions on Power Systems , vol.15 , Issue.2 , pp. 715-721
    • Richter, C.W.1    Sheble, G.B.2
  • 49
    • 1542269711 scopus 로고    scopus 로고
    • Unit commitment problem under deregulated environment-A literature review
    • Toronto, Canada
    • Padhy N P. Unit commitment problem under deregulated environment-A literature review. In: Proceedings of IEEE Power Engineering Society General Meeting. Toronto, Canada, 2003, 1088-1094.
    • (2003) Proceedings of IEEE Power Engineering Society General Meeting , pp. 1088-1094
    • Padhy, N.P.1
  • 50
    • 0035425754 scopus 로고    scopus 로고
    • Existence and determination of competitive equilibrium in unit commitment power pool auctions: Price setting and scheduling alternatives
    • Madrigal M, Quintana V H. Existence and determination of competitive equilibrium in unit commitment power pool auctions: Price setting and scheduling alternatives. IEEE Transactions on Power Systems, 2001, 16(3): 380-388.
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.3 , pp. 380-388
    • Madrigal, M.1    Quintana, V.H.2
  • 51
    • 0037631146 scopus 로고    scopus 로고
    • Making unit commitment decisions when electricity is traded at spat market prices
    • Columbus, USA
    • Valenzuela J, Mazumdar M. Making unit commitment decisions when electricity is traded at spat market prices. In: Proceedings of IEEE Power Engineering Society Winter Meeting. Columbus, USA, 2001, 1: 1509-1512.
    • (2001) Proceedings of IEEE Power Engineering Society Winter Meeting , vol.1 , pp. 1509-1512
    • Valenzuela, J.1    Mazumdar, M.2
  • 54
    • 2542598480 scopus 로고    scopus 로고
    • Unit commitment-A bibliographical survey
    • Padhy N P. Unit commitment-A bibliographical survey. IEEE Transactions on Power Systems, 2004, 19(2): 1196-1205.
    • (2004) IEEE Transactions on Power Systems , vol.19 , Issue.2 , pp. 1196-1205
    • Padhy, N.P.1
  • 55
    • 84856290355 scopus 로고    scopus 로고
    • A chance-constrained two-stage stochastic program for unit commitment with uncertain wind power output
    • Wang Q F, Guan Y P, Wang J H. A chance-constrained two-stage stochastic program for unit commitment with uncertain wind power output. IEEE Transactions on Power Systems, 2012, 27(1): 206-215.
    • (2012) IEEE Transactions on Power Systems , vol.27 , Issue.1 , pp. 206-215
    • Wang, Q.F.1    Guan, Y.P.2    Wang, J.H.3
  • 56
    • 79955540640 scopus 로고    scopus 로고
    • Commitment of combined cycle plants using a dual optimization-dynamic programming approach
    • Álvarez López J, Gómez R N, Moya I G. Commitment of combined cycle plants using a dual optimization-dynamic programming approach. IEEE Transactions on Power Systems, 2011, 26(2): 728-737.
    • (2011) IEEE Transactions on Power Systems , vol.26 , Issue.2 , pp. 728-737
    • Álvarez López, J.1    Gómez, R.N.2    Moya, I.G.3
  • 57
    • 79953224775 scopus 로고    scopus 로고
    • Hourly scheduling of DC transmission lines in SCUC with voltage source converters
    • Lotfjou A, Shahidehpour M, Fu Y. Hourly scheduling of DC transmission lines in SCUC with voltage source converters. IEEE Transactions on Power Delivery, 2011, 26(2): 650-660.
    • (2011) IEEE Transactions on Power Delivery , vol.26 , Issue.2 , pp. 650-660
    • Lotfjou, A.1    Shahidehpour, M.2    Fu, Y.3
  • 58
    • 84860262199 scopus 로고    scopus 로고
    • Two-level hierarchical approach to unit commitment using expert system and elite PSO
    • Chen P H. Two-level hierarchical approach to unit commitment using expert system and elite PSO. IEEE Transactions on Power Systems, 2012, 27(2): 780-789.
    • (2012) IEEE Transactions on Power Systems , vol.27 , Issue.2 , pp. 780-789
    • Chen, P.H.1
  • 59
    • 84856271410 scopus 로고    scopus 로고
    • A solution to the unit commitment problem using imperialistic competition algorithm
    • Moghimi Hadji M, Vahidi B. A solution to the unit commitment problem using imperialistic competition algorithm. IEEE Transactions on Power Systems, 2012, 27(1): 117-124.
    • (2012) IEEE Transactions on Power Systems , vol.27 , Issue.1 , pp. 117-124
    • Moghimi Hadji, M.1    Vahidi, B.2
  • 60
    • 79960894189 scopus 로고    scopus 로고
    • Unit commitment with volatile node injections by using interval optimization
    • Wang Y, Xia Q, Kang C Q. Unit commitment with volatile node injections by using interval optimization. IEEE Transactions on Power Systems, 2011, 26(3): 1705-1713.
    • (2011) IEEE Transactions on Power Systems , vol.26 , Issue.3 , pp. 1705-1713
    • Wang, Y.1    Xia, Q.2    Kang, C.Q.3
  • 61
    • 79960893303 scopus 로고    scopus 로고
    • Contingency-constrained unit commitment with n-K security criterion: A robust optimization approach
    • Street A, Oliveira F, Arroyo J M. Contingency-constrained unit commitment with n-K security criterion: A robust optimization approach. IEEE Transactions on Power Systems, 2011, 26(3): 1581-1590.
    • (2011) IEEE Transactions on Power Systems , vol.26 , Issue.3 , pp. 1581-1590
    • Street, A.1    Oliveira, F.2    Arroyo, J.M.3
  • 63
    • 79955528582 scopus 로고    scopus 로고
    • An advanced quantum-inspired evolutionary algorithm for unit commitment
    • Chung C Y, Yu H, Wong K P. An advanced quantum-inspired evolutionary algorithm for unit commitment. IEEE Transactions on Power Systems, 2011, 26(2): 847-854.
    • (2011) IEEE Transactions on Power Systems , vol.26 , Issue.2 , pp. 847-854
    • Chung, C.Y.1    Yu, H.2    Wong, K.P.3
  • 64
    • 80052053715 scopus 로고    scopus 로고
    • SCUC with hourly demand response considering intertemporal load characteristics
    • Khodaei A, Shahidehpour M, Bahramirad S. SCUC with hourly demand response considering intertemporal load characteristics. IEEE Transaction on Smart Grid, 2011, 2(3): 564-571.
    • (2011) IEEE Transaction on Smart Grid , vol.2 , Issue.3 , pp. 564-571
    • Khodaei, A.1    Shahidehpour, M.2    Bahramirad, S.3
  • 65
    • 84856260970 scopus 로고    scopus 로고
    • A systematic method for constructing feasible solution to SCUC problem with analytical feasibility conditions
    • Wu H Y, Guan X H, Zhai Q Z, Ye H X. A systematic method for constructing feasible solution to SCUC problem with analytical feasibility conditions. IEEE Transactions on Power Systems, 2012, 27(1): 526-534.
    • (2012) IEEE Transactions on Power Systems , vol.27 , Issue.1 , pp. 526-534
    • Wu, H.Y.1    Guan, X.H.2    Zhai, Q.Z.3    Ye, H.X.4
  • 66
    • 84856287203 scopus 로고    scopus 로고
    • Security-constrained unit commitment with wind generation and compressed air energy storage
    • Daneshi H, Srivastava A K. Security-constrained unit commitment with wind generation and compressed air energy storage. IET Generation. Transmission & Distribution, 2012, 6(2): 167-175.
    • (2012) IET Generation. Transmission & Distribution , vol.6 , Issue.2 , pp. 167-175
    • Daneshi, H.1    Srivastava, A.K.2
  • 67
    • 84857640891 scopus 로고    scopus 로고
    • Resource scheduling under uncertainty in a smart grid with renewables and plug-in vehicles
    • Saber A Y, Venayagamoorthy G K. Resource scheduling under uncertainty in a smart grid with renewables and plug-in vehicles. IEEE Systems Journal, 2012, 6(1): 103-109.
    • (2012) IEEE Systems Journal , vol.6 , Issue.1 , pp. 103-109
    • Saber, A.Y.1    Venayagamoorthy, G.K.2
  • 68
    • 84860259834 scopus 로고    scopus 로고
    • Comparison of Scenario-based and interval optimization approaches to stochastic SCUC
    • Wu L, Shahidehpour M, Li Z Y. Comparison of Scenario-based and interval optimization approaches to stochastic SCUC. IEEE Transactions on Power Systems, 2012, 27(2): 913-921.
    • (2012) IEEE Transactions on Power Systems , vol.27 , Issue.2 , pp. 913-921
    • Wu, L.1    Shahidehpour, M.2    Li, Z.Y.3
  • 69
    • 84856286574 scopus 로고    scopus 로고
    • Tight mixed integer linear programming formulations for the unit commitment problem
    • Ostrowski J, Anjos M F, Vannelli A. Tight mixed integer linear programming formulations for the unit commitment problem. IEEE Transactions on Power Systems, 2012, 27(1): 39-46.
    • (2012) IEEE Transactions on Power Systems , vol.27 , Issue.1 , pp. 39-46
    • Ostrowski, J.1    Anjos, M.F.2    Vannelli, A.3
  • 70
    • 80054879986 scopus 로고    scopus 로고
    • A tighter piecewise linear approximation of quadratic cost curves for unit commitment problems
    • Wu L. A tighter piecewise linear approximation of quadratic cost curves for unit commitment problems. IEEE Transactions on Power Systems, 2011, 26(4): 2581-2583.
    • (2011) IEEE Transactions on Power Systems , vol.26 , Issue.4 , pp. 2581-2583
    • Wu, L.1
  • 71
    • 79151480740 scopus 로고    scopus 로고
    • Assessing the yearly impact of wind power through a new hybrid deterministic/stochastic unit commitment
    • Restrepo J F, Galiana F D. Assessing the yearly impact of wind power through a new hybrid deterministic/stochastic unit commitment. IEEE Transactions on Power Systems, 2011, 26(1): 401-410.
    • (2011) IEEE Transactions on Power Systems , vol.26 , Issue.1 , pp. 401-410
    • Restrepo, J.F.1    Galiana, F.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.