Solving multi-objective parallel machine scheduling problem by a modified NSGA-II

Author keywords

Job sequencing; Multi Objective Evolutionary Algorithm (MOEA); NSGA II (Non dominated Sorting Genetic Algorithm II); SPEA2

Indexed keywords

FORMULATED PROBLEMS; JOB SEQUENCING; MULTI OBJECTIVE; MULTI OBJECTIVE EVOLUTIONARY ALGORITHMS; MUTATION ALGORITHMS; NON-DOMINATED SORTING GENETIC ALGORITHM-II; PARALLEL MACHINE-SCHEDULING PROBLEMS; SPEA2;

EID: 84878205249     PISSN: 0307904X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.apm.2013.01.050     Document Type: Article
Times cited : (77)

References (31)
  • 1
    • 84868194146 scopus 로고    scopus 로고
    • Uniform parallel-machine scheduling to minimize makespan with position-based learning curves
    • Wen-Chiung Lee, Mei-Chi Chuang, Wei-Chang Yeh Uniform parallel-machine scheduling to minimize makespan with position-based learning curves. Comput. Ind. Eng. 2012, 63:813-818.
    • (2012) Comput. Ind. Eng. , vol.63 , pp. 813-818
    • Wen-Chiung, L.1    Mei-Chi, C.2    Wei-Chang, Y.3
  • 2
    • 64449088021 scopus 로고    scopus 로고
    • Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm
    • Behnamian J., Zandieh M., Ghomi S.M.T., Fatemi F. Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm. Exp. Syst. Appl. 2009, 36:9637-9644.
    • (2009) Exp. Syst. Appl. , vol.36 , pp. 9637-9644
    • Behnamian, J.1    Zandieh, M.2    Ghomi, S.M.T.3    Fatemi, F.4
  • 3
    • 79957588033 scopus 로고    scopus 로고
    • Parallel machine scheduling with fuzzy processing times using a robust genetic algorithm and simulation
    • Savas Balin Parallel machine scheduling with fuzzy processing times using a robust genetic algorithm and simulation. Inf. Sci. 2011, 181:3551-3569.
    • (2011) Inf. Sci. , vol.181 , pp. 3551-3569
    • Savas, B.1
  • 4
    • 2942627919 scopus 로고    scopus 로고
    • The scheduling problem of PCBs for multiple non-identical parallel machines
    • Nguyen Van Hop, Nagarur Nagendra N. The scheduling problem of PCBs for multiple non-identical parallel machines. Eur. J. Oper. Res. 2004, 158:577-594.
    • (2004) Eur. J. Oper. Res. , vol.158 , pp. 577-594
    • Nguyen Van, H.1    Nagarur Nagendra, N.2
  • 5
    • 79957845748 scopus 로고    scopus 로고
    • Bounded parallel-batch scheduling on single and multi machines for deteriorating jobs
    • Cuixia Miao., Yuzhong Zhang., Zhigang Cao. Bounded parallel-batch scheduling on single and multi machines for deteriorating jobs. Inf. Process. Lett. 2011, 111:798-803.
    • (2011) Inf. Process. Lett. , vol.111 , pp. 798-803
    • Cuixia, M.1    Yuzhong, Z.2    Zhigang, C.3
  • 6
    • 77953960509 scopus 로고    scopus 로고
    • An effective hybrid multi-objective genetic algorithm for bi-criteria scheduling on a single batch processing machine with non-identical job sizes
    • Husseinzadeh Kashan Ali, Behrooz Karimi, Fariborz Jolai An effective hybrid multi-objective genetic algorithm for bi-criteria scheduling on a single batch processing machine with non-identical job sizes. Eng. Appl. Artif. Intell. 2010, 23:911-922.
    • (2010) Eng. Appl. Artif. Intell. , vol.23 , pp. 911-922
    • Husseinzadeh, K.A.1    Behrooz, K.2    Fariborz, J.3
  • 7
    • 84869106299 scopus 로고    scopus 로고
    • Parallel-machine scheduling to minimize tardiness penalty and power cost
    • Kuei-Tang Fang, Lin Bertrand M.T. Parallel-machine scheduling to minimize tardiness penalty and power cost. Comput. Ind. Eng. 2013, 64:224-234.
    • (2013) Comput. Ind. Eng. , vol.64 , pp. 224-234
    • Kuei-Tang, F.1    Lin Bertrand, M.T.2
  • 8
    • 75449112582 scopus 로고    scopus 로고
    • Bi-objective ant colony optimization approach to optimize production and maintenance scheduling
    • Berrichi A., Yalaoui F., Amodeo L., Mezghiche M. Bi-objective ant colony optimization approach to optimize production and maintenance scheduling. Comput. Oper. Res. 2010, 37:1584-1596.
    • (2010) Comput. Oper. Res. , vol.37 , pp. 1584-1596
    • Berrichi, A.1    Yalaoui, F.2    Amodeo, L.3    Mezghiche, M.4
  • 9
    • 78549269075 scopus 로고    scopus 로고
    • Hybrid flowshop scheduling with machine and resource-dependent processing times
    • Behnamian J., Ghomi S.M.T., Fatemi F. Hybrid flowshop scheduling with machine and resource-dependent processing times. Appl. Math. Model. 2011, 35:1107-1123.
    • (2011) Appl. Math. Model. , vol.35 , pp. 1107-1123
    • Behnamian, J.1    Ghomi, S.M.T.2    Fatemi, F.3
  • 10
    • 84867582302 scopus 로고    scopus 로고
    • The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine
    • Behnamian J., Ghomi S.M.T., Fatemi F. The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine. Inf. Sci. 2013, 219:181-196.
    • (2013) Inf. Sci. , vol.219 , pp. 181-196
    • Behnamian, J.1    Ghomi, S.M.T.2    Fatemi, F.3
  • 11
    • 67349246469 scopus 로고    scopus 로고
    • Scheduling interfering job sets on parallel machines
    • Hari Balasubramanian, John Fowler, Ahmet Keha, Michele Pfund Scheduling interfering job sets on parallel machines. Eur. J. Oper. Res. 2009, 199:55-67.
    • (2009) Eur. J. Oper. Res. , vol.199 , pp. 55-67
    • Hari, B.1    John, F.2    Ahmet, K.3    Michele, P.4
  • 13
    • 0033115210 scopus 로고    scopus 로고
    • Exploiting process plan flexibility in production scheduling: a multi-objective approach
    • Paolo Brandimarte Exploiting process plan flexibility in production scheduling: a multi-objective approach. Eur. J. Oper. Res. 1999, 114:59-71.
    • (1999) Eur. J. Oper. Res. , vol.114 , pp. 59-71
    • Paolo, B.1
  • 14
    • 63449108993 scopus 로고    scopus 로고
    • A fuzzy-mixed-integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates
    • Gharehgozli A.H., Tavakkoli-Moghaddam R., Zaerpour N. A fuzzy-mixed-integer goal programming model for a parallel-machine scheduling problem with sequence-dependent setup times and release dates. Rob. Comput. Integr. Manuf. 2009, 25:853-859.
    • (2009) Rob. Comput. Integr. Manuf. , vol.25 , pp. 853-859
    • Gharehgozli, A.H.1    Tavakkoli-Moghaddam, R.2    Zaerpour, N.3
  • 15
    • 33646081533 scopus 로고    scopus 로고
    • Parallel machine scheduling with a convex resource consumption function
    • Dvir Shabtay, Moshe Kaspi Parallel machine scheduling with a convex resource consumption function. Eur. J. Oper. Res. 2006, 173:92-107.
    • (2006) Eur. J. Oper. Res. , vol.173 , pp. 92-107
    • Dvir, S.1    Moshe, K.2
  • 16
    • 0000976158 scopus 로고
    • A bicriterion approach to preemptive scheduling of parallel machines with controllable job processing times
    • Eugeniusz Nowicki, Stanislaw Zdrzal.-ka A bicriterion approach to preemptive scheduling of parallel machines with controllable job processing times. Discrete Appl. Math. 1995, 63:237-256.
    • (1995) Discrete Appl. Math. , vol.63 , pp. 237-256
    • Eugeniusz, N.1    Stanislaw, Z.-K.2
  • 17
    • 75449111796 scopus 로고    scopus 로고
    • Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs
    • Mazdeh Mohammad Mahdavi, Zaerpour Farzad, Zareei Abalfazl, Hajinezhad Ali, Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs, Appl. Math. Model. 34 (2010) 1498-1510.
    • (2010) Appl. Math. Model. , vol.34 , pp. 1498-1510
    • Mazdeh, M.M.1    Zaerpour, F.2    Zareei, A.3    Hajinezhad, A.4
  • 18
    • 67349221528 scopus 로고    scopus 로고
    • Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints
    • Tavakkoli-Moghaddam R., Taheri F., Bazzazi M., Izadi M., Sassani F. Design of a genetic algorithm for bi-objective unrelated parallel machines scheduling with sequence-dependent setup times and precedence constraints. Comput. Oper. Res. 2009, 36:3224-3230.
    • (2009) Comput. Oper. Res. , vol.36 , pp. 3224-3230
    • Tavakkoli-Moghaddam, R.1    Taheri, F.2    Bazzazi, M.3    Izadi, M.4    Sassani, F.5
  • 19
    • 84863465903 scopus 로고    scopus 로고
    • Scheduling on parallel identical machines with job-rejection and position-dependent processing times
    • Enrique Gerstl, Gur Mosheiov Scheduling on parallel identical machines with job-rejection and position-dependent processing times. Inf. Process. Lett. 2012, 112:743-747.
    • (2012) Inf. Process. Lett. , vol.112 , pp. 743-747
    • Enrique, G.1    Gur, M.2
  • 20
    • 0035371695 scopus 로고    scopus 로고
    • Minimizing makespan subject to minimum #owtime on two identical parallel machines
    • Gupta Jatinder N.D., Ho Johnny C. Minimizing makespan subject to minimum #owtime on two identical parallel machines. Comput. Oper. Res. 2001, 28:705-717.
    • (2001) Comput. Oper. Res. , vol.28 , pp. 705-717
    • Gupta Jatinder, N.D.1    Ho Johnny, C.2
  • 21
    • 84861101995 scopus 로고    scopus 로고
    • Parallel dedicated machines scheduling with chain precedence constraints
    • Alessandro Agnetis, Hans Kellerer, Gaia Nicosia, Andrea Pacifici Parallel dedicated machines scheduling with chain precedence constraints. Eur. J. Oper. Res. 2012, 221:296-305.
    • (2012) Eur. J. Oper. Res. , vol.221 , pp. 296-305
    • Alessandro, A.1    Hans, K.2    Gaia, N.3    Andrea, P.4
  • 22
    • 39649123270 scopus 로고    scopus 로고
    • Parallel-machine scheduling with time dependent processing times
    • Wen-Hung Kuo, Dar-Li Yang Parallel-machine scheduling with time dependent processing times. Theor. Comput. Sci. 2008, 393:204-210.
    • (2008) Theor. Comput. Sci. , vol.393 , pp. 204-210
    • Wen-Hung, K.1    Dar-Li, Y.2
  • 23
    • 84871619311 scopus 로고    scopus 로고
    • Approximation schemes for two-agent scheduling on parallel machines
    • doi:10.1016/j.tcs.2012.11.002
    • Zhao Kejun, Lu Xiwen, Approximation schemes for two-agent scheduling on parallel machines, Theor. Comput. Sci. (2012), doi:10.1016/j.tcs.2012.11.002.
    • (2012) Theor. Comput. Sci.
    • Zhao, K.1    Lu, X.2
  • 24
    • 0037410718 scopus 로고    scopus 로고
    • A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines
    • Cochran Jeffery K., Shwu-Min Horng, Fowler John W. A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines. Comput. Oper. Res. 2003, 30:1087-1102.
    • (2003) Comput. Oper. Res. , vol.30 , pp. 1087-1102
    • Cochran Jeffery, K.1    Shwu-Min, H.2    Fowler John, W.3
  • 25
    • 84865656071 scopus 로고    scopus 로고
    • Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints
    • Dalfard Vahid Majazi, Mohammadi Ghorbanali, Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints, Comput. Math. Appl. 64 (2012) 2111-2117.
    • (2012) Comput. Math. Appl. , vol.64 , pp. 2111-2117
    • Dalfard, V.M.1    Mohammadi, G.2
  • 26
    • 78549251688 scopus 로고    scopus 로고
    • Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems
    • Lin Y.K., Pfund M.E., Fowler J.W. Heuristics for minimizing regular performance measures in unrelated parallel machine scheduling problems. Comput. Oper. Res. 2011, 38:901-916.
    • (2011) Comput. Oper. Res. , vol.38 , pp. 901-916
    • Lin, Y.K.1    Pfund, M.E.2    Fowler, J.W.3
  • 27
    • 77952959002 scopus 로고    scopus 로고
    • A united search particle swarm optimization algorithm for multiobjective scheduling problem
    • Zhigang Lian A united search particle swarm optimization algorithm for multiobjective scheduling problem. Appl. Math. Model. 2010, 34:3518-3526.
    • (2010) Appl. Math. Model. , vol.34 , pp. 3518-3526
    • Zhigang, L.1
  • 28
    • 71349083639 scopus 로고    scopus 로고
    • Dynamic parallel machine scheduling with sequence-dependent setup times using an iterated greedy heuristic
    • Kuo-Ching Ying, Hui-Miao Cheng Dynamic parallel machine scheduling with sequence-dependent setup times using an iterated greedy heuristic. Expert Syst. Appl. 2010, 37:2848-2852.
    • (2010) Expert Syst. Appl. , vol.37 , pp. 2848-2852
    • Kuo-Ching, Y.1    Hui-Miao, C.2
  • 29
    • 34249066737 scopus 로고    scopus 로고
    • Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach
    • Armentano Vinícius Amaral, Filho Moacir Felizardo de Franco, Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach, Eur. J. Oper. Res. 183 (2007) 100-114.
    • (2007) Eur. J. Oper. Res. , vol.183 , pp. 100-114
    • Armentano, V.A.1    Filho, M.F.F.2
  • 30
    • 84872497762 scopus 로고    scopus 로고
    • Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time
    • doi:10.1016/j.apm.2012.07.029
    • Yang Suh-Jenq, Unrelated parallel-machine scheduling with deterioration effects and deteriorating multi-maintenance activities for minimizing the total completion time, Appl. Math. Model. (2012), doi:10.1016/j.apm.2012.07.029.
    • (2012) Appl. Math. Model.
    • Yang, S.-J.1
  • 31
    • 0036530772 scopus 로고    scopus 로고
    • A fast and elitist multiobjective genetic algorithm: NSGA-II
    • Deb K., Pratap A., Agarwal S., Meyarivan T. A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Trans. Evol. Comput. 2002, 6(2):182-197.
    • (2002) IEEE Trans. Evol. Comput. , vol.6 , Issue.2 , pp. 182-197
    • Deb, K.1    Pratap, A.2    Agarwal, S.3    Meyarivan, T.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.