A dynamic intelligent decision approach to dependency modeling of project tasks in complex engineering system optimization

Author keywords

[No Author keywords available]

Indexed keywords

ARTIFICIAL BEE COLONY ALGORITHMS (ABC); COMPLEX ENGINEERING SYSTEM; DECISION-MAKING PROBLEM; DECOMPOSITION SCHEME; DEPENDENCY MODELING; INTELLIGENT DECISIONS; LARGE-SCALE PROJECTS; MULTI-PROJECT SCHEDULING;

EID: 84877980078     PISSN: 1024123X     EISSN: 15635147     Source Type: Journal    
DOI: 10.1155/2013/398123     Document Type: Article
Times cited : (13)

References (30)
  • 1
    • 0036769274 scopus 로고    scopus 로고
    • A project task coordination model for team organization in concurrent engineering
    • 2-s2.0-0036769274 10.1177/106329302761689115
    • Chen S. J., Lin L., A project task coordination model for team organization in concurrent engineering. Concurrent Engineering Research and Applications 2002 10 3 187 202 2-s2.0-0036769274 10.1177/106329302761689115
    • (2002) Concurrent Engineering Research and Applications , vol.10 , Issue.3 , pp. 187-202
    • Chen, S.J.1    Lin, L.2
  • 3
    • 0031250429 scopus 로고    scopus 로고
    • A module identification approach to the electrical design of electronic products by clustering analysis of the design matrix
    • PII S0360835297000818
    • Tseng M. M., Jiao J., A module identification approach to the electrical design of electronic products by clustering analysis of the design matrix. Computers and Industrial Engineering 1997 33 1-2 229 233 2-s2.0-0031250429 (Pubitemid 127404359)
    • (1997) Computers and Industrial Engineering , vol.33 , Issue.1-2 , pp. 229-233
    • Tseng, M.M.1    Jiao, J.2
  • 5
    • 77956063392 scopus 로고    scopus 로고
    • Modular analysis and modelling of risk scenarios with dependencies
    • 2-s2.0-77956063392 10.1016/j.jss.2010.05.069
    • Brændeland G., Refsdal A., Stølen K., Modular analysis and modelling of risk scenarios with dependencies. Journal of Systems and Software 2010 83 10 1995 2013 2-s2.0-77956063392 10.1016/j.jss.2010.05.069
    • (2010) Journal of Systems and Software , vol.83 , Issue.10 , pp. 1995-2013
    • Brændeland, G.1    Refsdal, A.2    Stølen, K.3
  • 6
    • 0018011301 scopus 로고
    • Multiple Resource-constrained scheduling using branch and bound
    • 2-s2.0-0018011301
    • Stinson J. P., Davis E. W., Khumawala B. M., Multiple Resource-constrained scheduling using branch and bound. AIIE Trans 1978 10 3 252 259 2-s2.0-0018011301
    • (1978) AIIE Trans , vol.10 , Issue.3 , pp. 252-259
    • Stinson, J.P.1    Davis, E.W.2    Khumawala, B.M.3
  • 7
    • 0023362513 scopus 로고
    • Project scheduling with resource constraints: A branch and bound approach
    • DOI 10.1016/0377-2217(87)90240-2
    • Christofides N., Álvarez-Valdés R., Tamarit J. M., Project scheduling with resource constraints: a branch and bound approach. European Journal of Operational Research 1987 29 3 262 273 10.1016/0377-2217(87)90240-2 MR891312 (Pubitemid 17598425)
    • (1987) European Journal of Operational Research , vol.29 , Issue.3 , pp. 262-273
    • Christofides, N.1    Alvarez-Valdes, R.2    Tamarit, J.M.3
  • 8
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the generalized resource-constrained project scheduling problem
    • 2-s2.0-0031097802
    • Demeulemeester E. L., Herroelen W. S., A branch-and-bound procedure for the generalized resource-constrained project scheduling problem. Management Science 1992 38 12 1803 1818 2-s2.0-0031097802
    • (1992) Management Science , vol.38 , Issue.12 , pp. 1803-1818
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 9
    • 0031192667 scopus 로고    scopus 로고
    • A genetic algorithm for multi-mode resource constrained project scheduling problem
    • PII S0377221796001804
    • Mori M., Tseng C. C., A genetic algorithm for multi-mode resource constrained project scheduling problem. European Journal of Operational Research 1997 100 1 134 141 2-s2.0-0031192667 (Pubitemid 127414915)
    • (1997) European Journal of Operational Research , vol.100 , Issue.1 , pp. 134-141
    • Mori, M.1    Tseng, C.C.2
  • 10
    • 0027666457 scopus 로고
    • Nonpreemptive multi-mode resource-constrained project scheduling
    • 2-s2.0-0027666457
    • Drexl A., Gruenewald J., Nonpreemptive multi-mode resource-constrained project scheduling. IIE Transactions 1993 25 5 74 81 2-s2.0-0027666457
    • (1993) IIE Transactions , vol.25 , Issue.5 , pp. 74-81
    • Drexl, A.1    Gruenewald, J.2
  • 11
    • 40249114872 scopus 로고    scopus 로고
    • Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem
    • DOI 10.1016/j.cor.2007.02.016, PII S0305054807000585
    • Xu N., McKee S. A., Nozick L. K., Ufomata R., Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem. Computers and Operations Research 2008 35 10 3284 3297 2-s2.0-40249114872 10.1016/j.cor.2007.02.016 (Pubitemid 351335147)
    • (2008) Computers and Operations Research , vol.35 , Issue.10 , pp. 3284-3297
    • Xu, N.1    McKee, S.A.2    Nozick, L.K.3    Ufomata, R.4
  • 12
    • 36749094527 scopus 로고    scopus 로고
    • A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
    • DOI 10.1016/j.amc.2007.04.096, PII S009630030700553X
    • Jarboui B., Damak N., Siarry P., Rebai A., A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems. Applied Mathematics and Computation 2008 195 1 299 308 10.1016/j.amc.2007.04.096 MR2379216 (Pubitemid 350213083)
    • (2008) Applied Mathematics and Computation , vol.195 , Issue.1 , pp. 299-308
    • Jarboui, B.1    Damak, N.2    Siarry, P.3    Rebai, A.4
  • 13
    • 84862271861 scopus 로고    scopus 로고
    • Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm
    • 713740 MR2923404
    • Ju C., Chen T., Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm. Discrete Dynamics in Nature and Society 2012 2012 22 713740 MR2923404
    • (2012) Discrete Dynamics in Nature and Society , vol.2012 , pp. 22
    • Ju, C.1    Chen, T.2
  • 14
    • 0037402152 scopus 로고    scopus 로고
    • Project scheduling for collaborative product development using DSM
    • DOI 10.1016/S0263-7863(02)00023-6
    • Chen C. H., Ling S. F., Chen W., Project scheduling for collaborative product development using DSM. International Journal of Project Management 2003 21 4 291 299 2-s2.0-0037402152 10.1016/S0263-7863(02)00023-6 (Pubitemid 36386770)
    • (2003) International Journal of Project Management , vol.21 , Issue.4 , pp. 291-299
    • Chen, C.-H.1    Ling, S.F.2    Chen, W.3
  • 15
    • 77949536438 scopus 로고    scopus 로고
    • Research on design structure matrix and its applications in product development and innovation: An overview
    • 2-s2.0-77949536438 10.1504/IJCAT.2010.031938
    • Xiao R., Chen T., Research on design structure matrix and its applications in product development and innovation: an overview. International Journal of Computer Applications in Technology 2010 37 3-4 218 229 2-s2.0-77949536438 10.1504/IJCAT.2010.031938
    • (2010) International Journal of Computer Applications in Technology , vol.37 , Issue.3-4 , pp. 218-229
    • Xiao, R.1    Chen, T.2
  • 16
    • 34249881895 scopus 로고    scopus 로고
    • Concurrent design process analysis and optimization for aluminum profile extrusion product development
    • DOI 10.1007/s00170-007-1025-9
    • Wei H. Q., Concurrent design process analysis and optimization for aluminum profile extrusion product development. International Journal of Advanced Manufacturing Technology 2007 33 7-8 652 661 2-s2.0-34249881895 10.1007/s00170-007-1025-9 (Pubitemid 46870770)
    • (2007) International Journal of Advanced Manufacturing Technology , vol.33 , Issue.7-8 , pp. 652-661
    • Wei, H.-Q.1
  • 17
    • 77957777989 scopus 로고    scopus 로고
    • A new approach to solving coupled task sets based on resource balance strategy in product development
    • 2-s2.0-77957777989 10.1504/IJMPT.2010.035802
    • Xiao R., Chen T., Chen W., A new approach to solving coupled task sets based on resource balance strategy in product development. International Journal of Materials and Product Technology 2010 39 3-4 251 270 2-s2.0-77957777989 10.1504/IJMPT.2010.035802
    • (2010) International Journal of Materials and Product Technology , vol.39 , Issue.3-4 , pp. 251-270
    • Xiao, R.1    Chen, T.2    Chen, W.3
  • 18
    • 79956154381 scopus 로고    scopus 로고
    • Research on product development iterations based on feedback control theory in a dynamic environment
    • 2-s2.0-79956154381
    • Xiao R., Chen T., Ju C., Research on product development iterations based on feedback control theory in a dynamic environment. International Journal of Innovative Computing, Information and Control 2011 7 5(B) 2669 2688 2-s2.0-79956154381
    • (2011) International Journal of Innovative Computing, Information and Control , vol.7 , Issue.5 , pp. 2669-2688
    • Xiao, R.1    Chen, T.2    Ju, C.3
  • 19
    • 15844426899 scopus 로고    scopus 로고
    • The use of dependence structure matrix and domain mapping matrix in managing uncertainty in multiple project situations
    • DOI 10.1016/j.ijproman.2004.11.001, PII S0263786304001036
    • Danilovic M., Sandkull B., The use of dependence structure matrix and domain mapping matrix in managing uncertainty in multiple project situations. International Journal of Project Management 2005 23 3 193 203 2-s2.0-15844426899 10.1016/j.ijproman.2004.11.001 (Pubitemid 40426561)
    • (2005) International Journal of Project Management , vol.23 , Issue.3 , pp. 193-203
    • Danilovic, M.1    Sandkull, B.2
  • 20
    • 0038581769 scopus 로고    scopus 로고
    • A structured approach to measuring functional dependency and sequencing of coupled tasks in engineering design
    • 2-s2.0-0038581769 10.1016/S0360-8352(03)00031-7
    • Su J. C. Y., Chen S. J., Lin L., A structured approach to measuring functional dependency and sequencing of coupled tasks in engineering design. Computers and Industrial Engineering 2003 45 1 195 214 2-s2.0-0038581769 10.1016/S0360-8352(03)00031-7
    • (2003) Computers and Industrial Engineering , vol.45 , Issue.1 , pp. 195-214
    • Su, J.C.Y.1    Chen, S.J.2    Lin, L.3
  • 22
    • 40849142091 scopus 로고    scopus 로고
    • A genetic algorithm for the resource constrained multi-project scheduling problem
    • DOI 10.1016/j.ejor.2006.06.074, PII S0377221707005929
    • Gonçalves J. F., Mendes J. J. M., Resende M. G. C., A genetic algorithm for the resource constrained multi-project scheduling problem. European Journal of Operational Research 2008 189 3 1171 1190 2-s2.0-40849142091 10.1016/j.ejor.2006.06.074 (Pubitemid 351400562)
    • (2008) European Journal of Operational Research , vol.189 , Issue.3 , pp. 1171-1190
    • Goncalves, J.F.1    Mendes, J.J.M.2    Resende, M.G.C.3
  • 24
    • 81855221666 scopus 로고    scopus 로고
    • Two-stage updating pheromone for invariant ant colony optimization algorithm
    • Zhang Z., Feng Z., Two-stage updating pheromone for invariant ant colony optimization algorithm. Expert Systems with Applications 2012 39 1 706 712
    • (2012) Expert Systems with Applications , vol.39 , Issue.1 , pp. 706-712
    • Zhang, Z.1    Feng, Z.2
  • 26
    • 84861540624 scopus 로고    scopus 로고
    • Modeling of ant colony's labor division for the multi-project scheduling problem and its solution by PSO
    • Xiao R. B., Chen W. M., Chen T. G., Modeling of ant colony's labor division for the multi-project scheduling problem and its solution by PSO. Journal of Computational and Theoretical Nanoscience 2012 9 2 223 232
    • (2012) Journal of Computational and Theoretical Nanoscience , vol.9 , Issue.2 , pp. 223-232
    • Xiao, R.B.1    Chen, W.M.2    Chen, T.G.3
  • 27
    • 79960359084 scopus 로고    scopus 로고
    • Modified PSO and wavelet transform-based fault classification on transmission systems
    • Upendar J., Gupta C. P., Singh G. K., Modified PSO and wavelet transform-based fault classification on transmission systems. International Journal of Bio-Inspired Computation 2010 2 6 395 403
    • (2010) International Journal of Bio-Inspired Computation , vol.2 , Issue.6 , pp. 395-403
    • Upendar, J.1    Gupta, C.P.2    Singh, G.K.3
  • 28
    • 23044474987 scopus 로고    scopus 로고
    • Optimal synthesis of mechanisms for path generation using refined numerical representation based model and AIS based searching method
    • DOI 10.1115/1.1898342
    • Liu Y., Xiao R., Optimal synthesis of mechanisms for path generation using refined numerical representation based model and AIS based searching method. Journal of Mechanical Design 2005 127 4 688 691 2-s2.0-23044474987 10.1115/1.1898342 (Pubitemid 41064225)
    • (2005) Journal of Mechanical Design, Transactions of the ASME , vol.127 , Issue.4 , pp. 688-691
    • Liu, Y.1    Xiao, R.2
  • 30
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource constrained project scheduling problems
    • Kolisch R., Sprecher A., Drexl A., Characterization and generation of a general class of resource constrained project scheduling problems. Management Science 1995 41 10 1693 1703
    • (1995) Management Science , vol.41 , Issue.10 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.