A project task coordination model for team organization in concurrent engineering
-
2-s2.0-0036769274 10.1177/106329302761689115
-
Chen S. J., Lin L., A project task coordination model for team organization in concurrent engineering. Concurrent Engineering Research and Applications 2002 10 3 187 202 2-s2.0-0036769274 10.1177/106329302761689115
-
(2002)
Concurrent Engineering Research and Applications
, vol.10
, Issue.3
, pp. 187-202
-
-
Chen, S.J.1
Lin, L.2
-
2
-
-
0002598189
-
Concurrent design: An algebraic perspective
-
Guo W., Cha J., Fang Y., Woo T. C., Concurrent design: an algebraic perspective. International Journal of Information Technology 1995 1 1 17 32
-
(1995)
International Journal of Information Technology
, vol.1
, Issue.1
, pp. 17-32
-
-
Guo, W.1
Cha, J.2
Fang, Y.3
Woo, T.C.4
-
3
-
-
0031250429
-
A module identification approach to the electrical design of electronic products by clustering analysis of the design matrix
-
PII S0360835297000818
-
Tseng M. M., Jiao J., A module identification approach to the electrical design of electronic products by clustering analysis of the design matrix. Computers and Industrial Engineering 1997 33 1-2 229 233 2-s2.0-0031250429 (Pubitemid 127404359)
-
(1997)
Computers and Industrial Engineering
, vol.33
, Issue.1-2
, pp. 229-233
-
-
Tseng, M.M.1
Jiao, J.2
-
5
-
-
77956063392
-
Modular analysis and modelling of risk scenarios with dependencies
-
2-s2.0-77956063392 10.1016/j.jss.2010.05.069
-
Brændeland G., Refsdal A., Stølen K., Modular analysis and modelling of risk scenarios with dependencies. Journal of Systems and Software 2010 83 10 1995 2013 2-s2.0-77956063392 10.1016/j.jss.2010.05.069
-
(2010)
Journal of Systems and Software
, vol.83
, Issue.10
, pp. 1995-2013
-
-
Brændeland, G.1
Refsdal, A.2
Stølen, K.3
-
6
-
-
0018011301
-
Multiple Resource-constrained scheduling using branch and bound
-
2-s2.0-0018011301
-
Stinson J. P., Davis E. W., Khumawala B. M., Multiple Resource-constrained scheduling using branch and bound. AIIE Trans 1978 10 3 252 259 2-s2.0-0018011301
-
(1978)
AIIE Trans
, vol.10
, Issue.3
, pp. 252-259
-
-
Stinson, J.P.1
Davis, E.W.2
Khumawala, B.M.3
-
7
-
-
0023362513
-
Project scheduling with resource constraints: A branch and bound approach
-
DOI 10.1016/0377-2217(87)90240-2
-
Christofides N., Álvarez-Valdés R., Tamarit J. M., Project scheduling with resource constraints: a branch and bound approach. European Journal of Operational Research 1987 29 3 262 273 10.1016/0377-2217(87)90240-2 MR891312 (Pubitemid 17598425)
-
(1987)
European Journal of Operational Research
, vol.29
, Issue.3
, pp. 262-273
-
-
Christofides, N.1
Alvarez-Valdes, R.2
Tamarit, J.M.3
-
8
-
-
0002907360
-
A branch-and-bound procedure for the generalized resource-constrained project scheduling problem
-
2-s2.0-0031097802
-
Demeulemeester E. L., Herroelen W. S., A branch-and-bound procedure for the generalized resource-constrained project scheduling problem. Management Science 1992 38 12 1803 1818 2-s2.0-0031097802
-
(1992)
Management Science
, vol.38
, Issue.12
, pp. 1803-1818
-
-
Demeulemeester, E.L.1
Herroelen, W.S.2
-
9
-
-
0031192667
-
A genetic algorithm for multi-mode resource constrained project scheduling problem
-
PII S0377221796001804
-
Mori M., Tseng C. C., A genetic algorithm for multi-mode resource constrained project scheduling problem. European Journal of Operational Research 1997 100 1 134 141 2-s2.0-0031192667 (Pubitemid 127414915)
-
(1997)
European Journal of Operational Research
, vol.100
, Issue.1
, pp. 134-141
-
-
Mori, M.1
Tseng, C.C.2
-
10
-
-
0027666457
-
Nonpreemptive multi-mode resource-constrained project scheduling
-
2-s2.0-0027666457
-
Drexl A., Gruenewald J., Nonpreemptive multi-mode resource-constrained project scheduling. IIE Transactions 1993 25 5 74 81 2-s2.0-0027666457
-
(1993)
IIE Transactions
, vol.25
, Issue.5
, pp. 74-81
-
-
Drexl, A.1
Gruenewald, J.2
-
11
-
-
40249114872
-
Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem
-
DOI 10.1016/j.cor.2007.02.016, PII S0305054807000585
-
Xu N., McKee S. A., Nozick L. K., Ufomata R., Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem. Computers and Operations Research 2008 35 10 3284 3297 2-s2.0-40249114872 10.1016/j.cor.2007.02.016 (Pubitemid 351335147)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.10
, pp. 3284-3297
-
-
Xu, N.1
McKee, S.A.2
Nozick, L.K.3
Ufomata, R.4
-
12
-
-
36749094527
-
A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
-
DOI 10.1016/j.amc.2007.04.096, PII S009630030700553X
-
Jarboui B., Damak N., Siarry P., Rebai A., A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems. Applied Mathematics and Computation 2008 195 1 299 308 10.1016/j.amc.2007.04.096 MR2379216 (Pubitemid 350213083)
-
(2008)
Applied Mathematics and Computation
, vol.195
, Issue.1
, pp. 299-308
-
-
Jarboui, B.1
Damak, N.2
Siarry, P.3
Rebai, A.4
-
13
-
-
84862271861
-
Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm
-
713740 MR2923404
-
Ju C., Chen T., Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm. Discrete Dynamics in Nature and Society 2012 2012 22 713740 MR2923404
-
(2012)
Discrete Dynamics in Nature and Society
, vol.2012
, pp. 22
-
-
Ju, C.1
Chen, T.2
-
14
-
-
0037402152
-
Project scheduling for collaborative product development using DSM
-
DOI 10.1016/S0263-7863(02)00023-6
-
Chen C. H., Ling S. F., Chen W., Project scheduling for collaborative product development using DSM. International Journal of Project Management 2003 21 4 291 299 2-s2.0-0037402152 10.1016/S0263-7863(02)00023-6 (Pubitemid 36386770)
-
(2003)
International Journal of Project Management
, vol.21
, Issue.4
, pp. 291-299
-
-
Chen, C.-H.1
Ling, S.F.2
Chen, W.3
-
15
-
-
77949536438
-
Research on design structure matrix and its applications in product development and innovation: An overview
-
2-s2.0-77949536438 10.1504/IJCAT.2010.031938
-
Xiao R., Chen T., Research on design structure matrix and its applications in product development and innovation: an overview. International Journal of Computer Applications in Technology 2010 37 3-4 218 229 2-s2.0-77949536438 10.1504/IJCAT.2010.031938
-
(2010)
International Journal of Computer Applications in Technology
, vol.37
, Issue.3-4
, pp. 218-229
-
-
Xiao, R.1
Chen, T.2
-
16
-
-
34249881895
-
Concurrent design process analysis and optimization for aluminum profile extrusion product development
-
DOI 10.1007/s00170-007-1025-9
-
Wei H. Q., Concurrent design process analysis and optimization for aluminum profile extrusion product development. International Journal of Advanced Manufacturing Technology 2007 33 7-8 652 661 2-s2.0-34249881895 10.1007/s00170-007-1025-9 (Pubitemid 46870770)
-
(2007)
International Journal of Advanced Manufacturing Technology
, vol.33
, Issue.7-8
, pp. 652-661
-
-
Wei, H.-Q.1
-
17
-
-
77957777989
-
A new approach to solving coupled task sets based on resource balance strategy in product development
-
2-s2.0-77957777989 10.1504/IJMPT.2010.035802
-
Xiao R., Chen T., Chen W., A new approach to solving coupled task sets based on resource balance strategy in product development. International Journal of Materials and Product Technology 2010 39 3-4 251 270 2-s2.0-77957777989 10.1504/IJMPT.2010.035802
-
(2010)
International Journal of Materials and Product Technology
, vol.39
, Issue.3-4
, pp. 251-270
-
-
Xiao, R.1
Chen, T.2
Chen, W.3
-
18
-
-
79956154381
-
Research on product development iterations based on feedback control theory in a dynamic environment
-
2-s2.0-79956154381
-
Xiao R., Chen T., Ju C., Research on product development iterations based on feedback control theory in a dynamic environment. International Journal of Innovative Computing, Information and Control 2011 7 5(B) 2669 2688 2-s2.0-79956154381
-
(2011)
International Journal of Innovative Computing, Information and Control
, vol.7
, Issue.5
, pp. 2669-2688
-
-
Xiao, R.1
Chen, T.2
Ju, C.3
-
19
-
-
15844426899
-
The use of dependence structure matrix and domain mapping matrix in managing uncertainty in multiple project situations
-
DOI 10.1016/j.ijproman.2004.11.001, PII S0263786304001036
-
Danilovic M., Sandkull B., The use of dependence structure matrix and domain mapping matrix in managing uncertainty in multiple project situations. International Journal of Project Management 2005 23 3 193 203 2-s2.0-15844426899 10.1016/j.ijproman.2004.11.001 (Pubitemid 40426561)
-
(2005)
International Journal of Project Management
, vol.23
, Issue.3
, pp. 193-203
-
-
Danilovic, M.1
Sandkull, B.2
-
20
-
-
0038581769
-
A structured approach to measuring functional dependency and sequencing of coupled tasks in engineering design
-
2-s2.0-0038581769 10.1016/S0360-8352(03)00031-7
-
Su J. C. Y., Chen S. J., Lin L., A structured approach to measuring functional dependency and sequencing of coupled tasks in engineering design. Computers and Industrial Engineering 2003 45 1 195 214 2-s2.0-0038581769 10.1016/S0360-8352(03)00031-7
-
(2003)
Computers and Industrial Engineering
, vol.45
, Issue.1
, pp. 195-214
-
-
Su, J.C.Y.1
Chen, S.J.2
Lin, L.3
-
22
-
-
40849142091
-
A genetic algorithm for the resource constrained multi-project scheduling problem
-
DOI 10.1016/j.ejor.2006.06.074, PII S0377221707005929
-
Gonçalves J. F., Mendes J. J. M., Resende M. G. C., A genetic algorithm for the resource constrained multi-project scheduling problem. European Journal of Operational Research 2008 189 3 1171 1190 2-s2.0-40849142091 10.1016/j.ejor.2006.06.074 (Pubitemid 351400562)
-
(2008)
European Journal of Operational Research
, vol.189
, Issue.3
, pp. 1171-1190
-
-
Goncalves, J.F.1
Mendes, J.J.M.2
Resende, M.G.C.3
-
24
-
-
81855221666
-
Two-stage updating pheromone for invariant ant colony optimization algorithm
-
Zhang Z., Feng Z., Two-stage updating pheromone for invariant ant colony optimization algorithm. Expert Systems with Applications 2012 39 1 706 712
-
(2012)
Expert Systems with Applications
, vol.39
, Issue.1
, pp. 706-712
-
-
Zhang, Z.1
Feng, Z.2
-
26
-
-
84861540624
-
Modeling of ant colony's labor division for the multi-project scheduling problem and its solution by PSO
-
Xiao R. B., Chen W. M., Chen T. G., Modeling of ant colony's labor division for the multi-project scheduling problem and its solution by PSO. Journal of Computational and Theoretical Nanoscience 2012 9 2 223 232
-
(2012)
Journal of Computational and Theoretical Nanoscience
, vol.9
, Issue.2
, pp. 223-232
-
-
Xiao, R.B.1
Chen, W.M.2
Chen, T.G.3
-
28
-
-
23044474987
-
Optimal synthesis of mechanisms for path generation using refined numerical representation based model and AIS based searching method
-
DOI 10.1115/1.1898342
-
Liu Y., Xiao R., Optimal synthesis of mechanisms for path generation using refined numerical representation based model and AIS based searching method. Journal of Mechanical Design 2005 127 4 688 691 2-s2.0-23044474987 10.1115/1.1898342 (Pubitemid 41064225)
-
(2005)
Journal of Mechanical Design, Transactions of the ASME
, vol.127
, Issue.4
, pp. 688-691
-
-
Liu, Y.1
Xiao, R.2
-
30
-
-
0000698758
-
Characterization and generation of a general class of resource constrained project scheduling problems
-
Kolisch R., Sprecher A., Drexl A., Characterization and generation of a general class of resource constrained project scheduling problems. Management Science 1995 41 10 1693 1703
-
(1995)
Management Science
, vol.41
, Issue.10
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
|