메뉴 건너뛰기




Volumn 7, Issue 1, 2013, Pages 45-54

Expanding interconnection capacity to integrate intermittent generation in the Iberian Peninsula

Author keywords

[No Author keywords available]

Indexed keywords

INTERCONNECTION CAPACITY; INTERMITTENT ENERGY SOURCE; NETWORK CONSTRAINTS; OPERATIONAL FLEXIBILITY; RENEWABLE GENERATION; TRANSMISSION CAPACITIES; TRANSMISSION INVESTMENTS; WIND AND SOLAR POWER;

EID: 84877852244     PISSN: 17521416     EISSN: 17521424     Source Type: Journal    
DOI: 10.1049/iet-rpg.2012.0151     Document Type: Article
Times cited : (9)

References (33)
  • 3
    • 84877847092 scopus 로고    scopus 로고
    • Ministry Of Industry Tourism And Trade. (In Spanish)
    • Ministry of Industry, Tourism and Trade: 'Renewable Energies Plan 2011-2020'. (In Spanish). Available at http://www.idae.es, 2010
    • (2010) Renewable Energies Plan 2011-2020
  • 4
    • 84877872397 scopus 로고    scopus 로고
    • Ministry Of Economy Innovation And Development. (In Portuguese)
    • Ministry of Economy, Innovation and Development: 'New Energies Plan: ENE 2020'. (In Portuguese). Available at http://www.renewable.pt, 2010
    • (2010) New Energies Plan: ENE 2020
  • 6
    • 84877848597 scopus 로고    scopus 로고
    • In Spanish
    • Monti M.: 'Interconnection France-Spain'. (In Spanish). Available at http://www.ec.europa.eu/spain/barcelona/images/documents/notes-de-premsa/ rapportmonti-es.pdf, 2008
    • (2008) Interconnection France-Spain
    • Monti, M.1
  • 7
    • 77952363739 scopus 로고    scopus 로고
    • Electricity market participation of wind farms: The success story of the Spanish pragmatism
    • Rivier, J.: 'Electricity market participation of wind farms: the success story of the Spanish pragmatism', Energy Policy, 2010, 38, (7), pp. 3174-3179
    • (2010) Energy Policy , vol.38 , Issue.7 , pp. 3174-3179
    • Rivier, J.1
  • 14
    • 36349034122 scopus 로고    scopus 로고
    • Economic criteria for planning transmission investment in restructured electricity markets
    • DOI 10.1109/TPWRS.2007.907149
    • Sauma, E., Oren, S.: 'Economic criteria for planning transmission investment in restructured electricity markets', IEEE Trans. Power Syst., 2007, 22, (4), pp. 1394-1405 (Pubitemid 350141940)
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.4 , pp. 1394-1405
    • Sauma, E.E.1    Oren, S.S.2
  • 15
    • 34247213403 scopus 로고    scopus 로고
    • Calculation of economic transmission connection capacity for wind power generation
    • DOI 10.1049/iet-rpg:20060020
    • Ault, G.W., Bell, K.R.W., Galloway, S.J.: 'Calculation of economic transmission connection capacity for wind power generation', IET Renew. Power Gener., 2007, 1, (1), pp. 61-69 (Pubitemid 46610169)
    • (2007) IET Renewable Power Generation , vol.1 , Issue.1 , pp. 61-69
    • Ault, G.W.1    Bell, K.R.W.2    Galloway, S.J.3
  • 18
    • 80053362758 scopus 로고    scopus 로고
    • Impact of intermittent generation on the expansion of the Spanish power system interconnection capacity
    • Trondheim, Norway, June
    • Fernandes, C., Frías, P.: 'Impact of intermittent generation on the expansion of the Spanish power system interconnection capacity'. IEEE PES PowerTech, Trondheim, Norway, June 2011
    • (2011) IEEE PES PowerTech
    • Fernandes, C.1    Frías, P.2
  • 20
    • 84877858175 scopus 로고    scopus 로고
    • Réseau de transport d'électricité: '2010 Reliability Report'. Available at http://www.clients.rte-france.com/htm/an/mediatheque/ telecharge/system-reliability-report-2010.pdf, 2010
    • (2010) 2010 Reliability Report
  • 24
    • 84861653537 scopus 로고    scopus 로고
    • Impact of vehicle-to-grid on power system operation costs: The Spanish case study
    • Fernandes, C., Frías, P., Latorre, J.M.: 'Impact of vehicle-to-grid on power system operation costs: the Spanish case study', Appl. Energy, 2012, 96, pp. 194-202
    • (2012) Appl. Energy , vol.96 , pp. 194-202
    • Fernandes, C.1    Frías, P.2    Latorre, J.M.3
  • 25
    • 84895901764 scopus 로고    scopus 로고
    • Modelling the operation of electric vehicles in an operation planning model
    • Stockholm, Sweden, August
    • Ramos, A., Latorre, J.M., Báñez, F., et al.: 'Modelling the operation of electric vehicles in an operation planning model'. Proc. 17th Power Syst. Computation Conf. (PSCC), Stockholm, Sweden, August 2011
    • (2011) Proc. 17th Power Syst. Computation Conf. (PSCC)
    • Ramos, A.1    Latorre, J.M.2    Báñez, F.3
  • 26
    • 84856240413 scopus 로고    scopus 로고
    • Demand response in an isolated system with high wind integration
    • Dietrich, K., Latorre, J.M., Olmos, L., Ramos, A.: 'Demand response in an isolated system with high wind integration', IEEE Trans. Power Syst., 2012, 27, (1), pp. 20-29
    • (2012) IEEE Trans. Power Syst. , vol.27 , Issue.1 , pp. 20-29
    • Dietrich, K.1    Latorre, J.M.2    Olmos, L.3    Ramos, A.4
  • 27
    • 84877864911 scopus 로고    scopus 로고
    • Load-frequency control and performance
    • Union for the Coordination of the Transmission of Electricity (UCTE), June
    • Union for the Coordination of the Transmission of Electricity (UCTE), 'Load-frequency control and performance', Operation Handbook, v2.5. Available at https://www.entsoe.eu/resources/publications/systemoperations/operation- handbook/, June 2004
    • (2004) Operation Handbook, v2.5
  • 28
    • 0037478571 scopus 로고    scopus 로고
    • An MCP approach for hydrothermal coordination in deregulated power markets
    • Washington, USA, July
    • Ventosa, M., Rivier, M., Ramos, A., García-Alcade, A.: 'An MCP approach for hydrothermal coordination in deregulated power markets'. Proc. IEEE Power Eng. Society Summer Meeting, Washington, USA, July 2000, vol. 4, pp. 2272-2277
    • (2000) Proc. IEEE Power Eng. Society Summer Meeting , vol.4 , pp. 2272-2277
    • Ventosa, M.1    Rivier, M.2    Ramos, A.3    García-Alcade, A.4
  • 29
    • 80052104766 scopus 로고    scopus 로고
    • A scenario analysis for an additional RES integration into the European transmission grid up to 2050
    • Zagreb, Croatia, May
    • Zani, A., Migliavacca, G., Grassi, A.: 'A scenario analysis for an additional RES integration into the European transmission grid up to 2050'. Proc. Eighth Int. Conf. on European Energy Market, Zagreb, Croatia, May 2011
    • (2011) Proc. Eighth Int. Conf. on European Energy Market
    • Zani, A.1    Migliavacca, G.2    Grassi, A.3
  • 33
    • 84871803666 scopus 로고    scopus 로고
    • Design and operation of power systems with large amounts of wind power
    • Holttinen, H., Meibom, P., Orths, A., et al.: 'Design and operation of power systems with large amounts of wind power'. Final report IEA Wind Task 25, 2009
    • (2009) Final Report IEA Wind Task , vol.25
    • Holttinen, H.1    Meibom, P.2    Orths, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.