메뉴 건너뛰기




Volumn 1, Issue 1, 2007, Pages 61-69

Calculation of economic transmission connection capacity for wind power generation

Author keywords

[No Author keywords available]

Indexed keywords

COST BENEFIT ANALYSIS; ELECTRIC POWER TRANSMISSION NETWORKS; POWER GENERATION; TIME SERIES ANALYSIS; WIND POWER;

EID: 34247213403     PISSN: 17521416     EISSN: 17521424     Source Type: Journal    
DOI: 10.1049/iet-rpg:20060020     Document Type: Article
Times cited : (35)

References (21)
  • 1
    • 34247239787 scopus 로고    scopus 로고
    • Energy White Paper: 'Our energy future - creating a low carbon economy' Department of Trade and Industry, February 2003.
    • Energy White Paper: 'Our energy future - creating a low carbon economy' Department of Trade and Industry, February 2003.
  • 2
    • 84876763860 scopus 로고    scopus 로고
    • Planning for the integration of on-shore renewable generation for the GB transmission system
    • September, Paper C1-114
    • Bayfield, C., Wood, S., Hiorns, A., and Trikha, C.: 'Planning for the integration of on-shore renewable generation for the GB transmission system'. Proc. CIGRE 2006, Paris 28 August - 1 September 2006, Paper C1-114
    • (2006) Proc. CIGRE 2006, Paris 28 August - 1
    • Bayfield, C.1    Wood, S.2    Hiorns, A.3    Trikha, C.4
  • 4
    • 34247277560 scopus 로고    scopus 로고
    • ESB National Grid:, October, available at
    • ESB National Grid: Transmission planning criteria, October 1998, available at http://www.eirgrid.com/eirgridportal/uploads/library/ transmission%20planning%20criteria.pdf
    • (1998) Transmission planning criteria
  • 5
    • 34247263736 scopus 로고    scopus 로고
    • Deutsche Energie-Agentur GmbH: 'Planning of the grid integration of wind energy in germany onshore and offshore up to the year 2020: summary of the essential results of the study'. DENA, Berlin, March 2005, available at: http://www.dena.de/en/topics/kraftwerke-und-netze/
    • Deutsche Energie-Agentur GmbH: 'Planning of the grid integration of wind energy in germany onshore and offshore up to the year 2020: summary of the essential results of the study'. DENA, Berlin, March 2005, available at: http://www.dena.de/en/topics/kraftwerke-und-netze/
  • 6
    • 34247229629 scopus 로고    scopus 로고
    • All-Island Grid Study
    • All Island Grid Study Working Group:, Belfast, available at
    • All Island Grid Study Working Group: 'All-Island Grid Study'. Action Renewables, Belfast, 2006, available at: http://www.actionrenewables.org/ resourceallisland.htm
    • (2006) Action Renewables
  • 7
    • 34247218516 scopus 로고    scopus 로고
    • Office of Gas and Electricity Markets: Transmission investment for renewable generation: final proposals'. Ofgem, London, December 2004, Report no. 288/04
    • Office of Gas and Electricity Markets: Transmission investment for renewable generation: final proposals'. Ofgem, London, December 2004, Report no. 288/04
  • 8
    • 34247227480 scopus 로고    scopus 로고
    • Merz: 'Technical evaluation of transmission network reinforcement expenditure proposals by licensees in Great Britain
    • Ofgem, London, August, available at
    • Sinclair Knight Merz: 'Technical evaluation of transmission network reinforcement expenditure proposals by licensees in Great Britain, Draft report for public release' (Ofgem, London, August 2004), available at: http://www.ofgem.gov.uk/temp/ofgem/cache/cmsattach/8259_19604_tirg_skmreport.pdf
    • (2004) Draft report for public release
    • Sinclair Knight1
  • 9
    • 1842797093 scopus 로고    scopus 로고
    • Ilex Energy Consulting Ltd:, Department for Trade and Industry, London, October, available at
    • Ilex Energy Consulting Ltd: 'Quantifying the system costs of additional renewables in 2020'. Department for Trade and Industry, London, October 2002, available at: http://www.dti.gov.uk/files/file21352.pdf
    • (2002) Quantifying the system costs of additional renewables in 2020
  • 12
    • 33745434455 scopus 로고    scopus 로고
    • Influence of wind speed on wind turbine reliability
    • Tavner, P., Edwards, C., Brinkman, A., and Spinato, F.: 'Influence of wind speed on wind turbine reliability', Wind Engineering, 2006, 30, (1), pp. 55-72
    • (2006) Wind Engineering , vol.30 , Issue.1 , pp. 55-72
    • Tavner, P.1    Edwards, C.2    Brinkman, A.3    Spinato, F.4
  • 14
    • 34247267093 scopus 로고    scopus 로고
    • Department for Trade and Industry:, DTI, London, available at
    • Department for Trade and Industry: 'What is the renewables obligation?'. DTI, London, 2005, available at: http://www.dti.gov.uk/energy/sources/ renewables/policy/renewables-obligation/what-is-renewables-obligation/page15633. html
    • (2005) What is the renewables obligation
  • 15
    • 34247199413 scopus 로고    scopus 로고
    • Non-Fossil Purchasing Agency Limited: http://www.nfpa.co.uk/nfpas/ trackrecord.htm
    • Non-Fossil Purchasing Agency Limited: http://www.nfpa.co.uk/nfpas/ trackrecord.htm
  • 16
    • 33750149515 scopus 로고    scopus 로고
    • Characteristics of the UK wind resource: Long-term patterns and relationship to electricity demand
    • Sinden, G.: 'Characteristics of the UK wind resource: long-term patterns and relationship to electricity demand', Energy Policy, 2007, 35, (1), pp. 112-127
    • (2007) Energy Policy , vol.35 , Issue.1 , pp. 112-127
    • Sinden, G.1
  • 17
    • 34247256701 scopus 로고    scopus 로고
    • Seven year statement 2006
    • National Grid:, Warwick, May, available at
    • National Grid: 'Seven year statement 2006'. National Grid, Warwick, May 2006, available at: http://www.nationalgrid.com/uk/sys%5F06/
    • (2006) National Grid
  • 18
    • 34247181961 scopus 로고    scopus 로고
    • Elexon: http://www.bmreports.com/bwx_reporting.htm
    • Elexon
  • 19
    • 84876775867 scopus 로고    scopus 로고
    • The sufficiency of transmission capacity to accommodate wind farms and manage security of supply
    • September, Paper C1-112
    • Bell, K.: 'The sufficiency of transmission capacity to accommodate wind farms and manage security of supply'. Proc. CIGRE 2006, Paris 28 August - 1 September 2006, Paper C1-112
    • (2006) Proc. CIGRE 2006, Paris 28 August - 1
    • Bell, K.1
  • 20
    • 34247229089 scopus 로고    scopus 로고
    • Unique failings plunged city into darkness
    • 30 August
    • Clark, A., and Gow, D.: ' "Unique failings" plunged city into darkness', The Guardian 30 August 2003
    • (2003) The Guardian
    • Clark, A.1    Gow, D.2
  • 21
    • 34247214485 scopus 로고    scopus 로고
    • Millions blacked out across Europe as cold snap triggers power surge
    • 6 November
    • Willsher, K., and McMahon, B.: 'Millions blacked out across Europe as cold snap triggers power surge'. The Guardian 6 November 2006
    • (2006) The Guardian
    • Willsher, K.1    McMahon, B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.