메뉴 건너뛰기




Volumn 60, Issue 2, 2013, Pages 424-437

A hybrid manufacturing/remanufacturing system with random remanufacturing yield and market-driven product acquisition

Author keywords

Product acquisition; random yield; remanufacturing; stochastic dynamic program

Indexed keywords

ACQUISITION MANAGEMENT; MARKET-DRIVEN PRODUCTS; PRODUCT ACQUISITION; RANDOM YIELD; REMANUFACTURING; REMANUFACTURING PROCESS; STOCHASTIC DYNAMIC PROGRAM; STOCHASTIC DYNAMIC PROGRAMMING;

EID: 84876770787     PISSN: 00189391     EISSN: None     Source Type: Journal    
DOI: 10.1109/TEM.2012.2215873     Document Type: Article
Times cited : (64)

References (41)
  • 1
    • 84865678676 scopus 로고    scopus 로고
    • Xeroxs approach to sustainability
    • I.Maslennikova and D. Foley, "Xeroxs approach to sustainability," Interfaces, vol. 30, no. 3, pp. 226-233, 2000.
    • (2000) Interfaces , vol.30 , Issue.3 , pp. 226-233
    • Maslennikova, I.1    Foley, D.2
  • 2
    • 0142087780 scopus 로고    scopus 로고
    • Remanufacturing: The next great opportunity for boosting US productivity
    • DOI 10.1016/S0007-6813(03)00087-9
    • R. Giuntini and K. Gaudette, "Remanufacturing: The next great opportunity for boosting US productivity," Bus. Horizons, vol. 46, no. 11-12, pp. 41-48, 2003. (Pubitemid 37272792)
    • (2003) Business Horizons , vol.46 , Issue.6 , pp. 41-48
    • Giuntini, R.1    Gaudette, K.2
  • 4
    • 25444491771 scopus 로고    scopus 로고
    • Optimal prices and trade-in rebates for durable, remanufacturable products
    • DOI 10.1287/msom.1050.0080
    • S. Ray, T. Boyaci, and N. Aras, "Optimal prices and trade-in rebates for durable, remanufacturable products," Manuf. Serv. Oper.Manage., vol. 7, no. 3, pp. 208-228, 2005. (Pubitemid 41365606)
    • (2005) Manufacturing and Service Operations Management , vol.7 , Issue.3 , pp. 208-228
    • Ray, S.1    Boyaci, T.2    Aras, N.3
  • 5
    • 33846287029 scopus 로고    scopus 로고
    • Coordination and priority decisions in hybrid manufacturing/ remanufacturing systems
    • N. Aras, V. Verter, and T. Boyaci, "Coordination and priority decisions in hybrid manufacturing/remanufacturing systems," Prod. Oper. Manage., vol. 15, no. 4, pp. 528-543, 2006.
    • (2006) Prod. Oper. Manage , vol.15 , Issue.4 , pp. 528-543
    • Aras, N.1    Verter, V.2    Boyaci, T.3
  • 6
    • 0002537454 scopus 로고    scopus 로고
    • Reuse of electric motors in consumer products
    • M. Klausner, W. Grimm, and C. Hendrickson, "Reuse of electric motors in consumer products," J. Ind. Ecol., vol. 2, no. 2, pp. 89-102, 1998.
    • (1998) J. Ind. Ecol , vol.2 , Issue.2 , pp. 89-102
    • Klausner, M.1    Grimm, W.2    Hendrickson, C.3
  • 7
    • 1642401176 scopus 로고    scopus 로고
    • Meeting the closed-loop challenge: The case of remanufacturing
    • A. M. Seitz and K. Peattie, "Meeting the closed-loop challenge: The case of remanufacturing," Calif.Manage. Rev., vol. 46, no. 2, pp. 74-89, 2004. (Pubitemid 38388106)
    • (2004) California Management Review , vol.46 , Issue.2 , pp. 74-89
    • Seitz, M.A.1    Peattie, K.2
  • 8
    • 84892244047 scopus 로고    scopus 로고
    • Recovery of car engines: The Mercedes-benz case
    • J. van Nunen, and L. van Wassenhove Eds. Berlin, Germany: Springer-Verlag
    • H. Driesch and S. Flapper, "Recovery of car engines: The Mercedes-benz case," in Managing Closed-Loop Supply Chains, S. Flapper, J. van Nunen, and L. van Wassenhove, Eds. Berlin, Germany: Springer-Verlag, 2005.
    • (2005) Managing Closed-Loop Supply Chains, S. Flapper
    • Driesch, H.1    Flapper, S.2
  • 9
    • 0001228726 scopus 로고    scopus 로고
    • Inventory management of remanufacturable products
    • L. B. Toktay, M. Wein, and S. A. Zenios, "Inventory management of remanufacturable products," Manage. Sci., vol. 46, no. 11, pp. 1412-1426, 2000.
    • (2000) Manage. Sci , vol.46 , Issue.11 , pp. 1412-1426
    • Toktay, L.B.1    Wein, M.2    Zenios, S.A.3
  • 10
    • 70349300108 scopus 로고    scopus 로고
    • Incentive and production decisions for remanufacturing operations
    • O. Kaya, "Incentive and production decisions for remanufacturing operations," Eur. J. Oper. Res., vol. 201, no. 2, pp. 442-453, 2010.
    • (2010) Eur. J. Oper. Res , vol.201 , Issue.2 , pp. 442-453
    • Kaya, O.1
  • 11
    • 2942631362 scopus 로고    scopus 로고
    • Optimal policies in hybrid manufacturing/remanufacturing systems with product substitution
    • K. Inderfurth, "Optimal policies in hybrid manufacturing/ remanufacturing systems with product substitution," Int. J. Prod. Econ., vol. 90, no. 3, pp. 325-343, 2004.
    • (2004) Int. J. Prod. Econ , vol.90 , Issue.3 , pp. 325-343
    • Inderfurth, K.1
  • 14
    • 72149096791 scopus 로고    scopus 로고
    • Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art
    • M. A. Ilgin and S. M. Gupta, "Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art," J. Environ. Manage., vol. 91, no. 3, pp. 563-591, 2010.
    • (2010) J. Environ. Manage , vol.91 , Issue.3 , pp. 563-591
    • Ilgin, M.A.1    Gupta, S.M.2
  • 15
    • 0017948545 scopus 로고
    • Optimum solution structure for a repairable inventory problem
    • V. P. Simpson, "Optimum solution structure for a repairable inventory problem," Oper. Res., vol. 26, no. 2, pp. 270-281, 1978.
    • (1978) Oper. Res , vol.26 , Issue.2 , pp. 270-281
    • Simpson, V.P.1
  • 16
    • 0002898812 scopus 로고
    • Forecasting the returns of reusable containers
    • P. Kelle and E. A. Silver, "Forecasting the returns of reusable containers," J. Oper. Manage., vol. 8, no. 1, pp. 17-35, 1989.
    • (1989) J. Oper. Manage , vol.8 , Issue.1 , pp. 17-35
    • Kelle, P.1    Silver, E.A.2
  • 17
    • 0000683467 scopus 로고    scopus 로고
    • Simple optimal replenishment and disposal policies for a product recovery system with leadtimes
    • K. Inderfurth, "Simple optimal replenishment and disposal policies for a product recovery system with leadtimes," OR Spectr., vol. 19, no. 2, pp. 111-122, 1997.
    • (1997) OR Spectr , vol.19 , Issue.2 , pp. 111-122
    • Inderfurth, K.1
  • 18
    • 0032690281 scopus 로고    scopus 로고
    • Inventory control in hybrid systems with remanufacturing
    • E. Van der Laan, M. Salomon, R. Dekker, and L. Van Wassenhove, "Inventory control in hybrid systems with remanufacturing," Manage. Sci., vol. 45, pp. 733-747, 1999.
    • (1999) Manage. Sci , vol.45 , pp. 733-747
    • Laan Der E.Van1    Salomon, M.2    Dekker, R.3    Van Wassenhove, L.4
  • 19
    • 2442420109 scopus 로고    scopus 로고
    • Inventory strategies for systems with fast remanufacturing
    • R. Teunter, E. Van der Laan, and D. Vlachos, "Inventory strategies for systems with fast remanufacturing," J. Oper. Res. Soc., vol. 55, no. 5, pp. 475-484, 2004.
    • (2004) J. Oper. Res. Soc , vol.55 , Issue.5 , pp. 475-484
    • Teunter, R.1    Laan Der E.Van2    Vlachos, D.3
  • 20
    • 79751526499 scopus 로고    scopus 로고
    • Optimum policy in hybrid manufacturing/remanufacturing system
    • J.Wang, J. Zhao, and X.Wang, "Optimum policy in hybrid manufacturing/remanufacturing system," Comput. Ind. Eng., vol. 60, no. 3, pp. 411-419, 2011.
    • (2011) Comput. Ind. Eng , vol.60 , Issue.3 , pp. 411-419
    • Wang, J.1    Zhao, J.2    Wang, X.3
  • 21
    • 0037449040 scopus 로고    scopus 로고
    • A new approach for controlling a hybrid stochastic manufacturing/ remanufacturing system with inventories and different leadtimes
    • G. P. Kiesmuller, "A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes," Eur. J. Oper. Res., vol. 147, no. 1, pp. 62-71, 2003.
    • (2003) Eur. J. Oper. Res , vol.147 , Issue.1 , pp. 62-71
    • Kiesmuller, G.P.1
  • 22
    • 9544249379 scopus 로고    scopus 로고
    • Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns
    • O. Tang and R. W. Grubbstrom, "Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns," Int. J. Prod. Econ., vol. 93-94, no. 1, pp. 285-300, 2005.
    • (2005) Int. J. Prod. Econ , vol.93-94 , Issue.1 , pp. 285-300
    • Tang, O.1    Grubbstrom, R.W.2
  • 23
    • 80055031645 scopus 로고    scopus 로고
    • Production planning of a hybrid manufacturing-remanufacturing system under uncertainty within a closedloop supply chain
    • P. Dejax, A. Gharbi, and J. P. Kenne, "Production planning of a hybrid manufacturing-remanufacturing system under uncertainty within a closedloop supply chain," Int. J. Prod. Econ., vol. 1994, pp. 81-93, 2010.
    • (2010) Int. J. Prod. Econ , vol.1994 , pp. 81-93
    • Dejax, P.1    Gharbi, A.2    Kenne, J.P.3
  • 24
    • 21244492844 scopus 로고    scopus 로고
    • Impact of uncertainties on recovery behavior in a remanufacturing environment. A numerical analysis
    • DOI 10.1108/09600030510607328
    • K. Inderfurth, "Impact of uncertainties on recovery behavior in a remanufacturing environment," Int. J. Phys. Distrib. Logist. Manage., vol. 35, no. 5, pp. 318-336, 2005. (Pubitemid 40885604)
    • (2005) International Journal of Physical Distribution and Logistics Management , vol.35 , Issue.5 , pp. 318-336
    • Inderfurth, K.1
  • 25
    • 28944452430 scopus 로고    scopus 로고
    • Heuristics for solving disassemble-to-order problems with stochastic yields
    • DOI 10.1007/s00291-005-0007-2
    • K. Inderfurth and M. I. Langella, "Heuristics for solving disassembleto-order problems with stochastic yields," OR Spectrum, vol. 28, no. 1, pp. 73-99, 2006. (Pubitemid 41781791)
    • (2006) OR Spectrum , vol.28 , Issue.1 , pp. 73-99
    • Inderfurth, K.1    Langella, I.M.2
  • 26
    • 34250880222 scopus 로고    scopus 로고
    • Setting the holding cost rates in a two-product system with remanufacturing
    • U. Corbaciolu and E. A. Van der Laan, "Setting the holding cost rates in a two-product system with remanufacturing," Int. J. Prod. Econ., vol. 109, no. 1-2, pp. 185-194, 2007.
    • (2007) Int. J. Prod. Econ , vol.109 , Issue.1-2 , pp. 185-194
    • Corbaciolu, U.1    Laan Der Van, E.A.2
  • 27
    • 34147190047 scopus 로고    scopus 로고
    • Impact of uncertainty in the quality of returns on the profitability of a single-period refurbishing operation
    • DOI 10.1016/j.ejor.2006.10.025, PII S0377221706010587
    • C. Zikopoulos and G. Tagaras, "Impact of uncertainty in the quality of returns on the profitability of a single-period refurbishing operation," Eur. J. Oper. Res., vol. 182, no. 1, pp. 205-225, 2007. (Pubitemid 46561164)
    • (2007) European Journal of Operational Research , vol.182 , Issue.1 , pp. 205-225
    • Zikopoulos, C.1    Tagaras, G.2
  • 28
    • 77954861017 scopus 로고    scopus 로고
    • Multi-period remanufacturing planning with uncertain quality of inputs
    • Aug.
    • M. Denizel, M. Ferguson, andG.C. Souza, "Multi-period remanufacturing planning with uncertain quality of inputs," IEEE Trans. Eng. Manage., vol. 57, no. 3, pp. 394-404, Aug. 2010.
    • (2010) IEEE Trans. Eng. Manage , vol.57 , Issue.3 , pp. 394-404
    • Denizel, M.1    Ferguson, G.C.2    Souza, M.3
  • 29
    • 0038577479 scopus 로고    scopus 로고
    • Yield information and supplier responsiveness in remanufacturing operations
    • G. Ferrer, "Yield information and supplier responsiveness in remanufacturing operations," Eur. J. Oper. Res., vol. 149, pp. 540-556, 2003.
    • (2003) Eur. J. Oper. Res , vol.149 , pp. 540-556
    • Ferrer, G.1
  • 30
    • 1142305311 scopus 로고    scopus 로고
    • Value of information in remanufacturing complex products
    • G. Ferrer and M. Ketzenberg, "Value of information in remanufacturing complex products," IIE Trans., vol. 36, no. 3, pp. 265-278, 2004.
    • (2004) IIE Trans , vol.36 , Issue.3 , pp. 265-278
    • Ferrer, G.1    Ketzenberg, M.2
  • 31
    • 0742316813 scopus 로고    scopus 로고
    • Mixed assembly and disassembly operations for remanufacturing
    • Environmental Management and Operations Management
    • M. E. Ketzenberg, G. C. Souza, and V. D. R. Guide, Jr., "Mixed assembly and disassembly operations for remanufacturing," Prod. Oper. Manage., vol. 12, no. 3, pp. 320-335, 2003. (Pubitemid 39374573)
    • (2003) Production and Operations Management , vol.12 , Issue.3 , pp. 320-335
    • Ketzenberg, M.E.1    Souza, G.C.2    Guide Jr., V.D.R.3
  • 32
    • 33846325135 scopus 로고    scopus 로고
    • Optimal acquisition and sorting policies for remanufacturing
    • M. R. Galbreth and J.D. Blackburn, "Optimal acquisition and sorting policies for remanufacturing," Prod. Oper. Manage., vol. 15, no. 3, pp. 384-392, 2006.
    • (2006) Prod. Oper. Manage , vol.15 , Issue.3 , pp. 384-392
    • Galbreth, M.R.1    Blackburn, J.D.2
  • 33
    • 33846273817 scopus 로고    scopus 로고
    • Value of information in closed loop supply chains
    • M. E. Ketzenberg, E. A. Van der Laan, and R. H. Teunter, "Value of information in closed loop supply chains," Prod. Oper. Manage., vol. 15, no. 3, pp. 393-406, 2006.
    • (2006) Prod. Oper. Manage , vol.15 , Issue.3 , pp. 393-406
    • Ketzenberg, M.E.1    Laan Der Van, E.A.2    Teunter, R.H.3
  • 34
    • 0034634819 scopus 로고    scopus 로고
    • Product acquisition management: Current industry practice and a proposed framework
    • DOI 10.1080/00207540050176003
    • V. D. R. Guide, Jr., and V. Jayaraman, "Product acquisition management: Current industry practice and a proposed framework," Int. J. Prod. Res., vol. 38, no. 16, pp. 3779-3800, 2000. (Pubitemid 35401931)
    • (2000) International Journal of Production Research , vol.38 , Issue.16 , pp. 3779-3800
    • Guide Jr., V.D.R.1    Jayaraman, V.2
  • 35
    • 0346433511 scopus 로고    scopus 로고
    • Matching supply and demand to maximize profits from remanufacturing
    • V. D. R. Guide, Jr., R. Teunter, and L. N. Van Wassenhove, "Matching supply and demand to maximize profits from remanufacturing," Manuf. Serv. Oper. Manage., vol. 5, no. 4, pp. 303-316, 2003.
    • (2003) Manuf. Serv. Oper. Manage , vol.5 , Issue.4 , pp. 303-316
    • Guide Jr., V.D.R.1    Teunter, R.2    Van Wassenhove, L.N.3
  • 36
    • 33846211233 scopus 로고    scopus 로고
    • Effects of random yield in reverse supply chains with price-sensitive supply and demand
    • I. Bakal and E. Akcali, "Effects of random yield in reverse supply chains with price-sensitive supply and demand," Prod. Oper. Manage., vol. 15, no. 3, pp. 407-420, 2006.
    • (2006) Prod. Oper. Manage , vol.15 , Issue.3 , pp. 407-420
    • Bakal, I.1    Akcali, E.2
  • 37
    • 34548711279 scopus 로고    scopus 로고
    • An analysis of decentralized collection and processing of end-of-life products
    • DOI 10.1016/j.jom.2007.01.017, PII S0272696307000198
    • I. Karakayali, H. Emir-Farinas, and E. Akcali, "An analysis of decentralized collection and processing of end-of-life products," J. Oper.Manage., vol. 25, no. 6, pp. 1161-1183, 2007. (Pubitemid 47429826)
    • (2007) Journal of Operations Management , vol.25 , Issue.6 , pp. 1161-1183
    • Karakayali, I.1    Emir-Farinas, H.2    Akcali, E.3
  • 38
    • 67649410319 scopus 로고    scopus 로고
    • Joint procurement and production decisions in remanufacturing under quality and demand uncertainty
    • S. K. Mukhopadhyay and H. Ma, "Joint procurement and production decisions in remanufacturing under quality and demand uncertainty," Int. J. Prod. Econ., vol. 120, no. 1, pp. 5-17, 2009.
    • (2009) Int. J. Prod. Econ , vol.120 , Issue.1 , pp. 5-17
    • Mukhopadhyay, S.K.1    Ma, H.2
  • 39
    • 6044264852 scopus 로고    scopus 로고
    • Management of endof-life vehicles (ELVs) in the US
    • Univ. Michigan, Ann Arbor, Rep. No. CSS01-01
    • J. Staudinger, G. A. Keoleian, and M. S. Flynn, "Management of endof-life vehicles (ELVs) in the US," Center of sustainable systems, Univ. Michigan, Ann Arbor, Rep. No. CSS01-01, 2001.
    • (2001) Center of Sustainable Systems
    • Staudinger, J.1    Keoleian, G.A.2    Flynn, M.S.3
  • 41
    • 61449123901 scopus 로고    scopus 로고
    • Optimal dynamic joint pricing and inventory control for multiplicative demand with fixed order costs and lost sales
    • Y. Song, S. Ray, and T. Boyaci, "Optimal dynamic joint pricing and inventory control for multiplicative demand with fixed order costs and lost sales," Oper. Res., vol. 57, no. 1, pp. 245-250, 2009.
    • (2009) Oper. Res , vol.57 , Issue.1 , pp. 245-250
    • Song, Y.1    Ray, S.2    Boyaci, T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.