메뉴 건너뛰기




Volumn 38, Issue 5, 2013, Pages 1217-1227

A Multi-criteria Multi-stakeholder Industrial Projects Prioritization in Gaza Strip

Author keywords

AHP; Industrial projects; MCDM; Prioritization; Selection

Indexed keywords


EID: 84876440508     PISSN: 2193567X     EISSN: 21914281     Source Type: Journal    
DOI: 10.1007/s13369-012-0346-7     Document Type: Article
Times cited : (8)

References (23)
  • 1
    • 84876437181 scopus 로고    scopus 로고
    • Palestinian Central Bureau of Statistics
    • Palestinian Central Bureau of Statistics.
  • 2
    • 35348994805 scopus 로고    scopus 로고
    • Integrated analytic hierarchy process and its applications-a literature review
    • Ho W.: Integrated analytic hierarchy process and its applications-a literature review. Eur. J. Oper. Res. 186(5), 211-228 (2008).
    • (2008) Eur. J. Oper. Res. , vol.186 , Issue.5 , pp. 211-228
    • Ho, W.1
  • 3
    • 25144483067 scopus 로고    scopus 로고
    • Analytic hierarchy process: an overview of applications
    • Vaidya O., Kumar S.: Analytic hierarchy process: an overview of applications. Eur. J. Oper. Res. 169(1), 1-29 (2006).
    • (2006) Eur. J. Oper. Res. , vol.169 , Issue.1 , pp. 1-29
    • Vaidya, O.1    Kumar, S.2
  • 4
    • 0024903368 scopus 로고
    • A justification methodology for automated manufacturing technologies
    • Parsaei H., Wilhelm M.: A justification methodology for automated manufacturing technologies. Comput. Ind. Eng. 16(3), 363-373 (1989).
    • (1989) Comput. Ind. Eng. , vol.16 , Issue.3 , pp. 363-373
    • Parsaei, H.1    Wilhelm, M.2
  • 5
    • 33748253247 scopus 로고    scopus 로고
    • Supplier selection using combined analytical hierarchy process and grey relational analysis
    • Yang C., Chen B.: Supplier selection using combined analytical hierarchy process and grey relational analysis. J. Manuf. Technol. Manage. 17(7), 926-941 (2006).
    • (2006) J. Manuf. Technol. Manage. , vol.17 , Issue.7 , pp. 926-941
    • Yang, C.1    Chen, B.2
  • 6
    • 0030214584 scopus 로고    scopus 로고
    • Use of the analytic hierarchy process to measure the initial viability of industrial projects
    • Alidi A. S.: Use of the analytic hierarchy process to measure the initial viability of industrial projects. Int. J. Project Manage. 14(4), 205-208 (1996).
    • (1996) Int. J. Project Manage. , vol.14 , Issue.4 , pp. 205-208
    • Alidi, A.S.1
  • 7
    • 46149134826 scopus 로고
    • Multi-objective models for selection of priority areas and industrial projects for investment promotion
    • Virginia D. J., Tabucannon M. T.: Multi-objective models for selection of priority areas and industrial projects for investment promotion. Eng. Costs Prod. Econ. 10, 173-184 (1986).
    • (1986) Eng. Costs Prod. Econ. , vol.10 , pp. 173-184
    • Virginia, D.J.1    Tabucannon, M.T.2
  • 9
    • 0037116767 scopus 로고    scopus 로고
    • Group decision making in a multiple criteria environment: a case using the AHP in the software selection
    • Lai V., Wong B. K., Cheung W.: Group decision making in a multiple criteria environment: a case using the AHP in the software selection. Eur. J. Oper. Res. 1(1), 134-144 (2002).
    • (2002) Eur. J. Oper. Res. , vol.1 , Issue.1 , pp. 134-144
    • Lai, V.1    Wong, B.K.2    Cheung, W.3
  • 10
    • 0029638703 scopus 로고
    • A unified framework for the selection of a flexible manufacturing system
    • Shang J. et al.: A unified framework for the selection of a flexible manufacturing system. Eur. J. Oper. Res. 2(85), 297-315 (1995).
    • (1995) Eur. J. Oper. Res. , vol.2 , Issue.85 , pp. 297-315
    • Shang, J.1
  • 11
    • 0033177631 scopus 로고    scopus 로고
    • An integrated framework for project portfolio selection
    • Archer N. P., Ghasemzadeh F.: An integrated framework for project portfolio selection. Int. J. Project Manage. 17(4), 207-216 (2002).
    • (2002) Int. J. Project Manage. , vol.17 , Issue.4 , pp. 207-216
    • Archer, N.P.1    Ghasemzadeh, F.2
  • 12
    • 38849142595 scopus 로고    scopus 로고
    • An integrated AHP-DEA methodology for bridge risk assessment
    • Wang, Y.; Liu, J.; Elhag, Taha M.: An integrated AHP-DEA methodology for bridge risk assessment. Comput. Ind. Eng. 54(3), 513-525 (2007).
    • (2007) Comput. Ind. Eng. , vol.54 , Issue.3 , pp. 513-525
    • Wang, Y.1    Liu, J.2    Elhag, T.M.3
  • 13
    • 25144496564 scopus 로고
    • Highway transportation comprehensive evaluation
    • Weiwu W., Jun K.: Highway transportation comprehensive evaluation. Comput. Ind. Eng. 27(2), 257-259 (1994).
    • (1994) Comput. Ind. Eng. , vol.27 , Issue.2 , pp. 257-259
    • Weiwu, W.1    Jun, K.2
  • 14
    • 84887288811 scopus 로고    scopus 로고
    • An evaluation of success factors using AHP to implement ISO 14001 based EMS
    • Chin K. S., Chiu S., Tummala V. M. R.: An evaluation of success factors using AHP to implement ISO 14001 based EMS. Int. J. Qual. Reliab. Manage. 16(4), 341-361 (1998).
    • (1998) Int. J. Qual. Reliab. Manage. , vol.16 , Issue.4 , pp. 341-361
    • Chin, K.S.1    Chiu, S.2    Tummala, V.M.R.3
  • 15
    • 73849085918 scopus 로고    scopus 로고
    • Evaluating and benchmarking non-governmental training programs: an analytic hierarchy approach
    • Agha S. R.: Evaluating and benchmarking non-governmental training programs: an analytic hierarchy approach. Jordan J. Mech. Ind. Eng. 2(2), 77-84 (2008).
    • (2008) Jordan J. Mech. Ind. Eng. , vol.2 , Issue.2 , pp. 77-84
    • Agha, S.R.1
  • 16
    • 0032135154 scopus 로고    scopus 로고
    • A multi-criterion approach to kanban allocations
    • Andijani A.: A multi-criterion approach to kanban allocations. Omega 4(26), 483-493 (1998).
    • (1998) Omega , vol.4 , Issue.26 , pp. 483-493
    • Andijani, A.1
  • 17
    • 0032187386 scopus 로고    scopus 로고
    • A multi-criteria decision making approach to university resource allocations and information infrastructure
    • Kwak N. K., Changwon L.: A multi-criteria decision making approach to university resource allocations and information infrastructure. Eur. J. Oper. Res. 2(110), 234-242 (1998).
    • (1998) Eur. J. Oper. Res. , vol.2 , Issue.110 , pp. 234-242
    • Kwak, N.K.1    Changwon, L.2
  • 18
    • 0029206512 scopus 로고
    • Using AHP for resource allocation problems
    • Ramanathan R., Ganesh L.: Using AHP for resource allocation problems. Eur. J. Oper. Res. 80(4), 410-417 (1995).
    • (1995) Eur. J. Oper. Res. , vol.80 , Issue.4 , pp. 410-417
    • Ramanathan, R.1    Ganesh, L.2
  • 19
    • 0011516976 scopus 로고
    • Forecasting foreign exchange rates: a comparative evaluation of AHP
    • Ulengin F., Ulengin B.: Forecasting foreign exchange rates: a comparative evaluation of AHP. Omega 22(5), 505-519 (1994).
    • (1994) Omega , vol.22 , Issue.5 , pp. 505-519
    • Ulengin, F.1    Ulengin, B.2
  • 20
    • 0030205947 scopus 로고    scopus 로고
    • Inventory forecasting with a multiple criteria decision tool
    • Korpela J., Tuominen M.: Inventory forecasting with a multiple criteria decision tool. Int. J. Prod. Econ. 45(3), 159-168 (1997).
    • (1997) Int. J. Prod. Econ. , vol.45 , Issue.3 , pp. 159-168
    • Korpela, J.1    Tuominen, M.2
  • 22
    • 84876422520 scopus 로고    scopus 로고
    • Expert Choice Inc.; Expert Choice, Expert Choice Software and Manual. 4922 Ellsworth Ave., Pittsburgh
    • Expert Choice Inc.; Expert Choice, Expert Choice Software and Manual. 4922 Ellsworth Ave., Pittsburgh (2004).
    • (2004)
  • 23
    • 53449102906 scopus 로고    scopus 로고
    • Decision making with the analytic hierarchy process
    • Saaty T. L.: Decision making with the analytic hierarchy process. Int. J. Serv. Sci. 1(1), 83-98 (2008).
    • (2008) Int. J. Serv. Sci. , vol.1 , Issue.1 , pp. 83-98
    • Saaty, T.L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.