메뉴 건너뛰기




Volumn 26, Issue 4, 1998, Pages 483-493

A multi-criterion approach for Kanban allocations

Author keywords

AHP; Kanban allocations; MCDM; Serial production systems; Stochastic simulation

Indexed keywords

HIERARCHICAL SYSTEMS; STOCHASTIC MODELS; STOCHASTIC SYSTEMS;

EID: 0032135154     PISSN: 03050483     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0305-0483(98)00004-8     Document Type: Article
Times cited : (24)

References (23)
  • 1
    • 85167858138 scopus 로고
    • A. A. Satie (ed.), Just-In-Time Manufacturing Systems: Operational Planning and Control Issues, Elsevier, Amsterdam
    • 1. Andijani, A., and Clark, G. 1991. Kanban Allocation to Serial Production Lines in a Stochastic Environment. In: A. A. Satie (ed.), Just-In-Time Manufacturing Systems: Operational Planning and Control Issues, Elsevier, Amsterdam, pp. 175-190.
    • (1991) Kanban Allocation to Serial Production Lines in A Stochastic Environment , pp. 175-190
    • Andijani, A.1    Clark, G.2
  • 2
    • 0024622483 scopus 로고
    • Bounds for throughput in production/inventory systems in series with deterministic processing times
    • 2. Altiok, T. and Kao, Z., Bounds for throughput in production/inventory systems in series with deterministic processing times. IIE Transactions, 1989, 21, 82-85.
    • (1989) IIE Transactions , vol.21 , pp. 82-85
    • Altiok, T.1    Kao, Z.2
  • 3
    • 84985774777 scopus 로고
    • A decomposition approximation for periodic Kanban-controlled flow shops
    • 3. Berkley, B., A decomposition approximation for periodic Kanban-controlled flow shops. Decision Sciences, 1992, 23, 291-311.
    • (1992) Decision Sciences , vol.23 , pp. 291-311
    • Berkley, B.1
  • 4
    • 0027595682 scopus 로고
    • Setting minimum performance levels for two-card Kanban-controlled lines
    • 4. Berkley, B., Setting minimum performance levels for two-card Kanban-controlled lines. International Journal of Production Research, 1993, 31, 1003-1021.
    • (1993) International Journal of Production Research , vol.31 , pp. 1003-1021
    • Berkley, B.1
  • 5
    • 0028201993 scopus 로고
    • Testing minimum performance levels for Kanban-controlled lines
    • 5. Berkley, B., Testing minimum performance levels for Kanban-controlled lines. International Journal of Production Research, 1994, 32, 93-109.
    • (1994) International Journal of Production Research , vol.32 , pp. 93-109
    • Berkley, B.1
  • 6
    • 84954971480 scopus 로고
    • Models of automatic transfer lines with inventory banks: A review and comparison
    • 6. Buzacott, J. and Hanifin, L., Models of automatic transfer lines with inventory banks: a review and comparison. AIIE Trans., 1978, 10, 197-207.
    • (1978) AIIE Trans. , vol.10 , pp. 197-207
    • Buzacott, J.1    Hanifin, L.2
  • 11
    • 0004102424 scopus 로고
    • Dow Jones-Irwin, Homewood, IL
    • 11. Hall, R. W., 1983. Zero Inventories. Dow Jones-Irwin, Homewood, IL.
    • (1983) Zero Inventories
    • Hall, R.W.1
  • 13
    • 0000861722 scopus 로고
    • A proof for the queuing formula: L = λW
    • 13. Little, J. D. C., A proof for the queuing formula: L = λW. Operations Research, 1961, 9, 383-387.
    • (1961) Operations Research , vol.9 , pp. 383-387
    • Little, J.D.C.1
  • 14
    • 0025564738 scopus 로고
    • Analysis of a Kanban discipline for cell coordination in production lines I
    • 14. Mitra, D. and Mitrani, I., Analysis of a Kanban discipline for cell coordination in production lines I. Management Science, 1990, 36, 1548-1566.
    • (1990) Management Science , vol.36 , pp. 1548-1566
    • Mitra, D.1    Mitrani, I.2
  • 15
    • 0029288838 scopus 로고
    • A comparison of alternative Kanban control mechanisms. I. Background and structural results
    • 15. Muckstadt, J. A. and Tayur, S. R., A comparison of alternative Kanban control mechanisms. I. Background and structural results. IIE Transactions, 1995, 27, 140-150.
    • (1995) IIE Transactions , vol.27 , pp. 140-150
    • Muckstadt, J.A.1    Tayur, S.R.2
  • 16
    • 0029288358 scopus 로고
    • A comparison of alternative Kanban control mechanisms. II. Experimental results
    • 16. Muckstadt, J. A. and Tayur, S. R., A comparison of alternative Kanban control mechanisms. II. Experimental results. IIE Transactions, 1995, 27, 151-161.
    • (1995) IIE Transactions , vol.27 , pp. 151-161
    • Muckstadt, J.A.1    Tayur, S.R.2
  • 17
    • 0022691163 scopus 로고
    • Approximate analysis of open network of queues with blocking: Tandem configuration
    • 17. Perros, H. and Altiok, T., Approximate analysis of open network of queues with blocking: tandem configuration. IEE Transactions on Software Engineering, 1986, 12, 101-105.
    • (1986) IEE Transactions on Software Engineering , vol.12 , pp. 101-105
    • Perros, H.1    Altiok, T.2
  • 19
    • 0023983194 scopus 로고
    • Buffer space allocation in automated assembly lines
    • 19. Smith, J. and Daskalaki, S., Buffer space allocation in automated assembly lines. Operations Research, 1988, 36, 343-358.
    • (1988) Operations Research , vol.36 , pp. 343-358
    • Smith, J.1    Daskalaki, S.2
  • 21
    • 0027696153 scopus 로고
    • Structural results and a heuristic for kanban control serial lines
    • 21. Tayur, S., Structural results and a heuristic for Kanban control serial lines. Management Science, 1993, 39, 1347-1368.
    • (1993) Management Science , vol.39 , pp. 1347-1368
    • Tayur, S.1
  • 22
    • 3943049520 scopus 로고
    • Determining the number of Kanbans: A step toward non-stock production
    • 22. Wang, H. and Wang, H., Determining the number of Kanbans: A step toward non-stock production. International Journal of Production Research, 1990, 28, 2101-2115.
    • (1990) International Journal of Production Research , vol.28 , pp. 2101-2115
    • Wang, H.1    Wang, H.2
  • 23
    • 0026374299 scopus 로고
    • Optimum number of kanbans between two adjacent workstations in a jit system
    • 23. Wang, H. and Wang, H., Optimum number of kanbans between two adjacent workstations in a jit system. International Journal of Production Economics, 1991, 22, 179-188.
    • (1991) International Journal of Production Economics , vol.22 , pp. 179-188
    • Wang, H.1    Wang, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.