-
1
-
-
85167858138
-
-
A. A. Satie (ed.), Just-In-Time Manufacturing Systems: Operational Planning and Control Issues, Elsevier, Amsterdam
-
1. Andijani, A., and Clark, G. 1991. Kanban Allocation to Serial Production Lines in a Stochastic Environment. In: A. A. Satie (ed.), Just-In-Time Manufacturing Systems: Operational Planning and Control Issues, Elsevier, Amsterdam, pp. 175-190.
-
(1991)
Kanban Allocation to Serial Production Lines in A Stochastic Environment
, pp. 175-190
-
-
Andijani, A.1
Clark, G.2
-
2
-
-
0024622483
-
Bounds for throughput in production/inventory systems in series with deterministic processing times
-
2. Altiok, T. and Kao, Z., Bounds for throughput in production/inventory systems in series with deterministic processing times. IIE Transactions, 1989, 21, 82-85.
-
(1989)
IIE Transactions
, vol.21
, pp. 82-85
-
-
Altiok, T.1
Kao, Z.2
-
3
-
-
84985774777
-
A decomposition approximation for periodic Kanban-controlled flow shops
-
3. Berkley, B., A decomposition approximation for periodic Kanban-controlled flow shops. Decision Sciences, 1992, 23, 291-311.
-
(1992)
Decision Sciences
, vol.23
, pp. 291-311
-
-
Berkley, B.1
-
4
-
-
0027595682
-
Setting minimum performance levels for two-card Kanban-controlled lines
-
4. Berkley, B., Setting minimum performance levels for two-card Kanban-controlled lines. International Journal of Production Research, 1993, 31, 1003-1021.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 1003-1021
-
-
Berkley, B.1
-
5
-
-
0028201993
-
Testing minimum performance levels for Kanban-controlled lines
-
5. Berkley, B., Testing minimum performance levels for Kanban-controlled lines. International Journal of Production Research, 1994, 32, 93-109.
-
(1994)
International Journal of Production Research
, vol.32
, pp. 93-109
-
-
Berkley, B.1
-
6
-
-
84954971480
-
Models of automatic transfer lines with inventory banks: A review and comparison
-
6. Buzacott, J. and Hanifin, L., Models of automatic transfer lines with inventory banks: a review and comparison. AIIE Trans., 1978, 10, 197-207.
-
(1978)
AIIE Trans.
, vol.10
, pp. 197-207
-
-
Buzacott, J.1
Hanifin, L.2
-
8
-
-
0000436165
-
Kanban controlled pull systems: An analytical approach
-
8. Deleersnyder, J., Hodgson, T., Muller, H. and O'Grady, P., Kanban controlled pull systems: An analytical approach. Management Science, 1989, 35, 1079-1091.
-
(1989)
Management Science
, vol.35
, pp. 1079-1091
-
-
Deleersnyder, J.1
Hodgson, T.2
Muller, H.3
O'Grady, P.4
-
11
-
-
0004102424
-
-
Dow Jones-Irwin, Homewood, IL
-
11. Hall, R. W., 1983. Zero Inventories. Dow Jones-Irwin, Homewood, IL.
-
(1983)
Zero Inventories
-
-
Hall, R.W.1
-
13
-
-
0000861722
-
A proof for the queuing formula: L = λW
-
13. Little, J. D. C., A proof for the queuing formula: L = λW. Operations Research, 1961, 9, 383-387.
-
(1961)
Operations Research
, vol.9
, pp. 383-387
-
-
Little, J.D.C.1
-
14
-
-
0025564738
-
Analysis of a Kanban discipline for cell coordination in production lines I
-
14. Mitra, D. and Mitrani, I., Analysis of a Kanban discipline for cell coordination in production lines I. Management Science, 1990, 36, 1548-1566.
-
(1990)
Management Science
, vol.36
, pp. 1548-1566
-
-
Mitra, D.1
Mitrani, I.2
-
15
-
-
0029288838
-
A comparison of alternative Kanban control mechanisms. I. Background and structural results
-
15. Muckstadt, J. A. and Tayur, S. R., A comparison of alternative Kanban control mechanisms. I. Background and structural results. IIE Transactions, 1995, 27, 140-150.
-
(1995)
IIE Transactions
, vol.27
, pp. 140-150
-
-
Muckstadt, J.A.1
Tayur, S.R.2
-
16
-
-
0029288358
-
A comparison of alternative Kanban control mechanisms. II. Experimental results
-
16. Muckstadt, J. A. and Tayur, S. R., A comparison of alternative Kanban control mechanisms. II. Experimental results. IIE Transactions, 1995, 27, 151-161.
-
(1995)
IIE Transactions
, vol.27
, pp. 151-161
-
-
Muckstadt, J.A.1
Tayur, S.R.2
-
17
-
-
0022691163
-
Approximate analysis of open network of queues with blocking: Tandem configuration
-
17. Perros, H. and Altiok, T., Approximate analysis of open network of queues with blocking: tandem configuration. IEE Transactions on Software Engineering, 1986, 12, 101-105.
-
(1986)
IEE Transactions on Software Engineering
, vol.12
, pp. 101-105
-
-
Perros, H.1
Altiok, T.2
-
19
-
-
0023983194
-
Buffer space allocation in automated assembly lines
-
19. Smith, J. and Daskalaki, S., Buffer space allocation in automated assembly lines. Operations Research, 1988, 36, 343-358.
-
(1988)
Operations Research
, vol.36
, pp. 343-358
-
-
Smith, J.1
Daskalaki, S.2
-
21
-
-
0027696153
-
Structural results and a heuristic for kanban control serial lines
-
21. Tayur, S., Structural results and a heuristic for Kanban control serial lines. Management Science, 1993, 39, 1347-1368.
-
(1993)
Management Science
, vol.39
, pp. 1347-1368
-
-
Tayur, S.1
-
22
-
-
3943049520
-
Determining the number of Kanbans: A step toward non-stock production
-
22. Wang, H. and Wang, H., Determining the number of Kanbans: A step toward non-stock production. International Journal of Production Research, 1990, 28, 2101-2115.
-
(1990)
International Journal of Production Research
, vol.28
, pp. 2101-2115
-
-
Wang, H.1
Wang, H.2
-
23
-
-
0026374299
-
Optimum number of kanbans between two adjacent workstations in a jit system
-
23. Wang, H. and Wang, H., Optimum number of kanbans between two adjacent workstations in a jit system. International Journal of Production Economics, 1991, 22, 179-188.
-
(1991)
International Journal of Production Economics
, vol.22
, pp. 179-188
-
-
Wang, H.1
Wang, H.2
|