메뉴 건너뛰기




Volumn , Issue , 2012, Pages

Using a scalable simulation model to evaluate the performance of production system segmentation in a combined MRP and kanban system

Author keywords

[No Author keywords available]

Indexed keywords

BACKORDER COSTS; INVENTORY COSTS; KANBAN SYSTEM; MACHINE ALLOCATION; MODEL IMPLEMENTATION; PERFORMANCE MEASURE; PRODUCTION SYSTEM; SCALABLE PRODUCTION; SERVICE LEVELS; SET-UP TIME; SIMULATION MODEL;

EID: 84874683651     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2012.6465053     Document Type: Conference Paper
Times cited : (18)

References (20)
  • 1
    • 79955631463 scopus 로고    scopus 로고
    • Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates
    • Altendorfer, K. and Minner, S. 2011. "Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates." European Journal of Operational Research 213: 134-146.
    • (2011) European Journal of Operational Research , vol.213 , pp. 134-146
    • Altendorfer, K.1    Minner, S.2
  • 2
    • 17444390501 scopus 로고    scopus 로고
    • Planning order releases for an assembly system with random operation times
    • DOI 10.1007/s00291-004-0186-2
    • Axsäter, S. 2005. "Planning order releases for an assembly system with random operation times." OR Spectrum 27: 459-470. (Pubitemid 40550384)
    • (2005) OR Spectrum , vol.27 , Issue.2-3 , pp. 459-470
    • Axsater, S.1
  • 3
    • 84986958388 scopus 로고
    • A review of the kanban production control research literature
    • Berkley, B. J. 1992. "A review of the kanban production control research literature." Production and Operations Management 4: 393-411.
    • (1992) Production and Operations Management , vol.4 , pp. 393-411
    • Berkley, B.J.1
  • 5
    • 0002082384 scopus 로고
    • Integrating Kanban type pull systems and MRP type push systems: Insights from a Markovian model
    • Deleersynder, J.-L., Hodgson, T. J., King, R. E., O'Grady, P. J., and Savva, A. 1992. "Integrating Kanban type pull systems and MRP type push systems: insights from a markovian model." IIE Transactions 24: 43-56.
    • (1992) IIE Transactions , vol.24 , pp. 43-56
    • Deleersynder, J.-L.1    Hodgson, T.J.2    King, R.E.3    O'grady, P.J.4    Savva, A.5
  • 6
    • 0036498097 scopus 로고    scopus 로고
    • Optimal leadtimes planning in serial production systems with earliness and tardiness costs
    • DOI 10.1023/A:1012473114130
    • Elhafsi, M. 2002. "Optimal leadtimes planning in serial production systems with earliness and tardiness costs." IIE Transactions 34: 233-243. (Pubitemid 34138521)
    • (2002) IIE Transactions (Institute of Industrial Engineers) , vol.34 , Issue.3 , pp. 233-243
    • Elhafsi, M.1
  • 7
    • 0028423190 scopus 로고
    • Optimal leadtimes planning in a serial production system
    • Gong, L., Kok, T. de, and Ding, J. 1994. "Optimal Lead-times Planning in a Serial Production System." Management Science 40: 629-632.
    • (1994) Management Science , vol.40 , pp. 629-632
    • Gong, L.1    De Kok, T.2    Ding, J.3
  • 8
    • 0030284535 scopus 로고    scopus 로고
    • Analysis of production control systems kanban and CONWIP
    • Gstettner, S. and Kuhn, H. 1996. "Analysis of production control systems kanban and CONWIP." International Journal of Production Research 34: 3253-3273. (Pubitemid 126713458)
    • (1996) International Journal of Production Research , vol.34 , Issue.11 , pp. 3253-3273
    • Gstettner, S.1    Kuhn, H.2
  • 10
    • 0032300132 scopus 로고    scopus 로고
    • A simulation and comparative study of the CONWIP, Kanban and MRP production control systems in a cold rolling plant
    • Huang, M., Wang, D., and Ip, W. H. 1998."A simulation and comparative study of the CONWIP, Kanban and MRP production control systems in a cold rolling plant". Production Planning & Control 9: 803-812. (Pubitemid 128625505)
    • (1998) Production Planning and Control , vol.9 , Issue.8 , pp. 803-812
    • Huang, M.1    Wang, D.2    Ip, W.H.3
  • 13
    • 39449103543 scopus 로고    scopus 로고
    • Service-level performance of MRP, kanban, CONWIP and DBR due to parameter stability and environmental robustness
    • DOI 10.1080/00207540600609297, PII 771342469
    • Jodlbauer, H. and Huber, A. 2008. "Service-level performance of MRP, Kanban, CONWIP and DBR due to parameter stability and environmental robustness." International Journal of Production Research 46: 2179-2195. (Pubitemid 351272736)
    • (2008) International Journal of Production Research , vol.46 , Issue.8 , pp. 2179-2195
    • Jodlbauer, H.1    Huber, A.2
  • 14
    • 32144454745 scopus 로고    scopus 로고
    • Kanban implementation at a tyre manufacturing plant: A case study
    • DOI 10.1080/09537280500121778, PII N44640641051884
    • Mukhopadhyay, S. K. and Shanker, S. 2005. "Kanban implementation at a tyre manufacturing plant: a case study". Production Planning & Control 16: 488-499. (Pubitemid 43203734)
    • (2005) Production Planning and Control , vol.16 , Issue.5 , pp. 488-499
    • Mukhopadhyay, S.K.1    Shanker, S.2
  • 16
    • 0042044389 scopus 로고    scopus 로고
    • Using simulation to evaluate the introduction of a Kanban subsystem within an MRP-controlled manufacturing environment
    • PII S0925527397000959
    • Smet, R. de and Gelders, L. 1998. "Using simulation to evaluate the introduction of a Kanban subsystem within an MRP-controlled manufacturing environment." International Journal of Production Economics 56-57: 111-122. (Pubitemid 128400936)
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 111-122
    • De Smet, R.1    Gelders, L.2
  • 18
    • 9544257295 scopus 로고    scopus 로고
    • Comparing CONWIP, synchronized CONWIP, and Kanban in complex supply chains
    • Proceedings of the Twelfth International Symposium on Inventories
    • Takahashi, K. and Myreshka, D. H. 2005. "Comparing CONWIP, synchronized CONWIP, and Kanban in complex supply chains". Proceedings of the Twelfth International Symposium on Inventories. International Journal of Production Economics 93-94: 25-40.
    • (2005) International Journal of Production Economics , vol.93-94 , pp. 25-40
    • Takahashi, K.1    Myreshka, D.H.2
  • 20
    • 0023207074 scopus 로고
    • Setting planned lead-times in serial production systems with tardiness costs
    • Yano, C. A. 1987. "Setting Planned Lead-times in Serial Production Systems with Tardiness Costs". Management Science 33: 95-106.
    • (1987) Management Science , vol.33 , pp. 95-106
    • Yano, C.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.