메뉴 건너뛰기




Volumn , Issue , 2011, Pages 1554-1565

Flexible model for analyzing production systems with discrete event simulation

Author keywords

[No Author keywords available]

Indexed keywords

COMPLEX PRODUCTION SYSTEMS; CUSTOMER ORDERS; DISCRETE-EVENT SIMULATION MODEL; FLEXIBLE MODEL; LEADTIME; MATERIAL FLOW; PROCESSING TIME; PRODUCT GROUPS; PRODUCTION ORDER; PRODUCTION PLANNING AND CONTROL; PRODUCTION SYSTEM; ROUTING INFORMATION; SET-UP TIME; SHOP FLOOR; SIMULATION MODEL; STOCHASTIC BEHAVIOR;

EID: 84858059781     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2011.6147873     Document Type: Conference Paper
Times cited : (39)

References (22)
  • 2
    • 0348128294 scopus 로고    scopus 로고
    • Object-Oriented Modeling and Simulation of Flexible Manufacturing Systems: A Rule-Based Procedure
    • Anglani, A., A. Grieco, M. Pacella, and T. Tolio. 2002. "Object-Oriented Modeling and Simulation of Flexible Manufacturing Systems: A Rule-Based Procedure." Simulation Modelling Practice and Theory 10: 209-234.
    • (2002) Simulation Modelling Practice and Theory , vol.10 , pp. 209-234
    • Anglani, A.1    Grieco, A.2    Pacella, M.3    Tolio, T.4
  • 3
    • 0034659588 scopus 로고    scopus 로고
    • Implementation of an object-oriented tool for the simulation of manufacturing systems and its application to study the effects of flexibility
    • DOI 10.1080/002075400188537
    • Borenstein, D. 2000. "Implementation of an Object-Oriented Tool for the Simulation of Manufacturing Systems and its Application to Study the Effects of Flexibility." International Journal of Production Research 38: 2125-2142. (Pubitemid 35401865)
    • (2000) International Journal of Production Research , vol.38 , Issue.9 , pp. 2125-2142
    • Borenstein, D.1
  • 4
    • 0032272321 scopus 로고    scopus 로고
    • Integrated Modeling and Analysis Generator Environment (IMAGE): A Decision Support Tool
    • Edited by D. J. Medeiros, E. F. Watson, J. S. Carson, M. S. Manivannan, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • Delen, D., P. C. Benjamin, and M. Erraguntla. 1998. "Integrated Modeling and Analysis Generator Environment (IMAGE): a Decision Support Tool." In Proceedings of the 1998 Winter Simulation Conference, Edited by D. J. Medeiros, E. F. Watson, J. S. Carson, M. S. Manivannan, 1401-1408. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (1998) Proceedings of the 1998 Winter Simulation Conference , pp. 1401-1408
    • Delen, D.1    Benjamin, P.C.2    Erraguntla, M.3
  • 5
    • 0001095296 scopus 로고    scopus 로고
    • Logistics Performance Measurement and Customer Success
    • PII S0019850197000783
    • Fawcett, S. E., and M. B. Cooper. 1998. "Logistics Performance Measurement and Customer Success."Industrial Marketing Management 27: 341-357. (Pubitemid 128375190)
    • (1998) Industrial Marketing Management , vol.27 , Issue.4 , pp. 341-357
    • Fawcett, S.E.1    Cooper, M.B.2
  • 6
    • 84858059185 scopus 로고    scopus 로고
    • Accessed September 22, 2011
    • FICO 2011. "FICO™ Xpress Optimization Suite." Accessed September 22, 2011. www.fico.com/en/Products/DMTools/Pages/FICO-Xpress- Optimization-Suite.aspx.
    • (2011) FICO™ Xpress Optimization Suite
  • 7
    • 0002957476 scopus 로고
    • Hierarchical Integration of Production Planning and Scheduling
    • edited by Martin K. Starr, New York: North Holland American Elsevier
    • Hax, A.C., and H.C. Meal. 1975. "Hierarchical Integration of Production Planning and Scheduling." In Studies in The Management Science, edited by Martin K. Starr, 53-69. New York: North Holland American Elsevier.
    • (1975) Studies in the Management Science , pp. 53-69
    • Hax, A.C.1    Meal, H.C.2
  • 8
    • 0031332774 scopus 로고    scopus 로고
    • Integrating Distributed Simulation Objects
    • edited by S. Andradóttir, K. J. Healy, D. H. Withers, B. L. Nelson, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • Heim, J. A. 1997. "Integrating Distributed Simulation Objects." In Proceedings of the 1997 conference on Winter simulation, edited by S. Andradóttir, K. J. Healy, D. H. Withers, B. L. Nelson, 532-538. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (1997) Proceedings of the 1997 Conference on Winter Simulation , pp. 532-538
    • Heim, J.A.1
  • 10
    • 0032069604 scopus 로고    scopus 로고
    • Simulation study of CONWIP for a cold rolling plant
    • PII S0925527397001527
    • Huang, M., D. Wang, and W. H. Ip. 1998. "Simulation Study of CONWIP for a Cold Rolling Plant." International Journal of Production Economics 54: 257-266. (Pubitemid 128418010)
    • (1998) International Journal of Production Economics , vol.54 , Issue.3 , pp. 257-266
    • Huang, M.1    Wang, D.2    Ip, W.H.3
  • 11
    • 39449103543 scopus 로고    scopus 로고
    • Service-level performance of MRP, kanban, CONWIP and DBR due to parameter stability and environmental robustness
    • DOI 10.1080/00207540600609297, PII 771342469
    • Jodlbauer, H., and A. Huber. 2008. "Service-level Performance of MRP, Kanban, CONWIP and DBR due to Parameter Stability and Environmental Robustness." International Journal of Production Research 46: 2179-2195. (Pubitemid 351272736)
    • (2008) International Journal of Production Research , vol.46 , Issue.8 , pp. 2179-2195
    • Jodlbauer, H.1    Huber, A.2
  • 13
    • 1342265927 scopus 로고    scopus 로고
    • Comparison of DBR with CONWIP in an Unbalanced Production Line with Three Stations
    • Koh, S.-G, and R. L. Bulfin. 2004. "Comparison of DBR with CONWIP in an Unbalanced Production Line with Three Stations." International Journal of Production Research 42: 391-404.
    • (2004) International Journal of Production Research , vol.42 , pp. 391-404
    • Koh, S.-G.1    Bulfin, R.L.2
  • 14
    • 0032784020 scopus 로고    scopus 로고
    • An Analysis of Heuristics in a Dynamic Job Shop with Weighted Tardiness Objectives
    • Kutanoglu, E., and I. Sabuncuoglu. 1999. "An Analysis of Heuristics in a Dynamic Job Shop with Weighted Tardiness Objectives." International Journal of Production Research 37: 165-187.
    • (1999) International Journal of Production Research , vol.37 , pp. 165-187
    • Kutanoglu, E.1    Sabuncuoglu, I.2
  • 15
    • 0001466208 scopus 로고
    • Putting Production Decisions Where They Belong
    • Meal, H. C. 1984. "Putting Production Decisions Where They Belong." Harvard Business Review 62: 102-111.
    • (1984) Harvard Business Review , vol.62 , pp. 102-111
    • Meal, H.C.1
  • 16
    • 0033874509 scopus 로고    scopus 로고
    • Methodology for rapid identification and collection of input data in the simulation of manufacturing systems
    • DOI 10.1016/S0928-4869(99)00020-8
    • Perera, T., and K. Liyanage. 2000. "Methodology for Rapid Identification and Collection of Input Data in the Simulation of Manufacturing Systems." Simulation Practice and Theory 7: 645-656. (Pubitemid 30559936)
    • (2000) Simulation Practice and Theory , vol.7 , Issue.7 , pp. 645-656
    • Perera, T.1    Liyanage, K.2
  • 17
    • 0035705394 scopus 로고    scopus 로고
    • Database Driven Factory Simulation: A Proof-Of-Concept Demonstrator
    • edited by B. A. Peters, J. S. Smith, D. J. Medeiros, M. W. Rohrer, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • Randell, L.G., and G.S. Bolmsjo. 2001. "Database Driven Factory Simulation: A Proof-Of-Concept Demonstrator."In Proceedings of the 2001 Winter Simulation Conference, edited by B. A. Peters, J. S. Smith, D. J. Medeiros, M. W. Rohrer, 977-983. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (2001) Proceedings of the 2001 Winter Simulation Conference , pp. 977-983
    • Randell, L.G.1    Bolmsjo, G.S.2
  • 19
    • 0031332786 scopus 로고    scopus 로고
    • Integration of Simulation with Enterprise Models
    • edited by S. Andradóttir, K. J. Healy, D. H. Withers, B. L. Nelson, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • Srinivasan, K., and S. Jayaraman. 1997. "Integration of Simulation with Enterprise Models." In Proceedings of the 1997 conference on Winter simulation, edited by S. Andradóttir, K. J. Healy, D. H. Withers, B. L. Nelson, 1352-1356. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (1997) Proceedings of the 1997 Conference on Winter Simulation , pp. 1352-1356
    • Srinivasan, K.1    Jayaraman, S.2
  • 20
    • 0002646636 scopus 로고
    • Expanding Simulation Beyond Planning and Design
    • Thompson, M. B. 1994. "Expanding Simulation Beyond Planning and Design." Industrial Engineering 26: 64.
    • (1994) Industrial Engineering , vol.26 , pp. 64
    • Thompson, M.B.1
  • 22
    • 0031331445 scopus 로고    scopus 로고
    • Structured Models and Dynamic Systems Analysis: The Integration of the IDEF0/IDEF3 Modeling Methods and Discrete Event Simulation
    • edited by S. Andradóttir, K. J. Healy, D. H. Withers, B. L. Nelson, Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • Whitman, L., B. Huff, and A. Presley. 1997. "Structured Models and Dynamic Systems Analysis: The Integration of the IDEF0/IDEF3 Modeling Methods and Discrete Event Simulation." In Proceedings of the 1997 conference on Winter simulation, edited by S. Andradóttir, K. J. Healy, D. H. Withers, B. L. Nelson, 518-524. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
    • (1997) Proceedings of the 1997 Conference on Winter Simulation , pp. 518-524
    • Whitman, L.1    Huff, B.2    Presley, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.