메뉴 건너뛰기




Volumn 84, Issue 2, 2013, Pages 155-157

Quantifying fatigue risk in model-based fatigue risk management

Author keywords

Fatigue prediction; Fatigue risk management; Fatigue threshold; Hours of service regulations; Mathematical model

Indexed keywords

AEROSPACE MEDICINE; AREA UNDER THE CURVE; ARTICLE; CIRCADIAN RHYTHM; HUMAN; PHYSIOLOGY; RISK ASSESSMENT; RISK MANAGEMENT; SLEEP;

EID: 84873265482     PISSN: 00956562     EISSN: None     Source Type: Journal    
DOI: 10.3357/ASEM.3455.2013     Document Type: Article
Times cited : (17)

References (10)
  • 1
    • 0020368354 scopus 로고
    • A two process model of sleep regulation
    • Borbély AA. A two process model of sleep regulation. Hum Neurobiol 1982; 1: 195-204.
    • (1982) Hum Neurobiol , vol.1 , pp. 195-204
    • Borbély, A.A.1
  • 2
    • 0001859405 scopus 로고
    • Timing of human sleep, recovery process gated by a circadian pacemaker
    • Daan S, Beersma DGM, Borbély AA. Timing of human sleep: recovery process gated by a circadian pacemaker. Am J Physiol 1984; 246: R161-83.
    • (1984) Am J Physiol , vol.246
    • Daan, S.1    Beersma, D.G.M.2    Borbély, A.A.3
  • 4
    • 84873249505 scopus 로고    scopus 로고
    • Federal Aviation Administration. 14 CFR, Parts 117, 119, and 121. Flightcrew member duty and rest requirements. Docket no. FAA-2009-1093; Amendment nos. 117-1, 119-16, 121-357; RIN 2120-AJ58. Washington, DC, Federal Aviation Administration
    • Federal Aviation Administration. 14 CFR, Parts 117, 119, and 121. Flightcrew member duty and rest requirements. Docket no. FAA-2009-1093; Amendment nos. 117-1, 119-16, 121-357; RIN 2120-AJ58. Washington, DC: Federal Aviation Administration; 2011.
    • (2011)
  • 5
    • 78649732382 scopus 로고    scopus 로고
    • Fatigue risk management, organizational factors at the regulatory and industry/company level
    • Gander P, Hartley L, Powell D, Cabon P, Hitchcock E, et al. Fatigue risk management: organizational factors at the regulatory and industry/company level. Accid Anal Prev 2011; 43: 573-90.
    • (2011) Accid Anal Prev , vol.43 , pp. 573-590
    • Gander, P.1    Hartley, L.2    Powell, D.3    Cabon, P.4    Hitchcock, E.5
  • 8
    • 79955455914 scopus 로고    scopus 로고
    • Fatigue and performance modeling
    • Kryger MH, Roth T, Dement WC, eds. 5th ed. St. Louis, Elsevier Saunders;
    • Hursh SR, Van Dongen HPA. Fatigue and performance modeling. In: Kryger MH, Roth T, Dement WC, eds. Principles and practice of sleep medicine, 5th ed. St. Louis: Elsevier Saunders; 2010:745-52.
    • (2010) Principles and practice of sleep medicine , pp. 745-752
    • Hursh, S.R.1    Van Dongen, H.P.A.2
  • 9
    • 77649208425 scopus 로고    scopus 로고
    • Fatigue risk management in fl ight crew scheduling
    • Romig E, Klemets T Fatigue risk management in fl ight crew scheduling. Aviat Space Environ Med 2009; 80: 1073-4.
    • (2009) Aviat Space Environ Med , vol.80 , pp. 1073-1074
    • Romig, E.1    Klemets, T.2
  • 10
    • 84873274892 scopus 로고    scopus 로고
    • Model-based fatigue risk management
    • Matthews G, Desmond PA, Neubauer C, Hancock PA, eds. Farnham, UK, Ashgate
    • Van Dongen HPA, Belenky G. Model-based fatigue risk management. In: Matthews G, Desmond PA, Neubauer C, Hancock PA, eds. The handbook of operator fatigue. Farnham, UK: Ashgate; 2012:487-506.
    • (2012) The handbook of operator fatigue , pp. 487-506
    • Van Dongen, H.P.A.1    Belenky, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.