-
1
-
-
84872942034
-
-
MSc Thesis. Construction Engineering and Management Division, Structural Engineering Department, Faculty of Engineering, Cairo University, Egypt
-
Amer, O. M. 2010. A multi-criteria decision making approach for selecting industrial projects. MSc Thesis. Construction Engineering and Management Division, Structural Engineering Department, Faculty of Engineering, Cairo University, Egypt.
-
(2010)
A Multi-criteria Decision Making Approach for Selecting Industrial Projects
-
-
Amer, O.M.1
-
2
-
-
84872925147
-
Remote sensing applications in urban socioeconomic analysis, in v
-
Mesev (Ed John Wiley & Sons, Inc., NY, US
-
Changshan, W. 2007. Remote sensing applications in urban socioeconomic analysis, in V. Mesev (Ed.). Integration of GIS and Remote Sensing. John Wiley & Sons, Inc., NY, US, 149-172.
-
(2007)
Integration of GIS and Remote Sensing
, pp. 149-172
-
-
Changshan, W.1
-
3
-
-
85001837235
-
Utility-theory model for bid markup decisions
-
Dozzi, S. P.; AbouRizk, S. M.; Schroeder, S. L. 1996. Utility-theory model for bid markup decisions, Journal of Construction Engineering and Management ASCE 122(2): 119-124. http://dx.doi.org/10.1061/(ASCE)0733-9364 (1996)122:2(119
-
(1996)
Journal of Construction Engineering and Management ASCE
, vol.122
, Issue.2
, pp. 119-124
-
-
Dozzi, S.P.1
Abourizk, S.M.2
Schroeder, S.L.3
-
4
-
-
0036604809
-
Determining the weights of criteria in the ELECTRE type methods with a revised Simos' procedure
-
DOI 10.1016/S0377-2217(01)00370-8, PII S0377221701003708
-
Figueira, J.; Roy, B. 2002. Determining the weights of criteria in the ELECTRE type methods with a revised Simos' procedure, European Journal of Operational Research 139(1-2): 317-326. http://dx.doi.org/10.1016/S0377-2217(01) 00370-8 (Pubitemid 34201242)
-
(2002)
European Journal of Operational Research
, vol.139
, Issue.2
, pp. 317-326
-
-
Figueira, J.1
Roy, B.2
-
5
-
-
0345585761
-
Additive utilities with incomplete product sets: Application to priorities and assignments
-
Fishburn, P. C. 1967. Additive utilities with incomplete product sets: application to priorities and assignments, Operations Research 15: 537-542. http://dx.doi.org/10.1287/opre.15.3.537
-
(1967)
Operations Research
, vol.15
, pp. 537-542
-
-
Fishburn, P.C.1
-
6
-
-
84993012246
-
A decision support tool for construction bidding
-
Marzouk, M.; Moselhi, O. 2003. A decision support tool for construction bidding, Construction Innovation: Information, Process, Management 3(2): 111-124.
-
(2003)
Construction Innovation: Information, Process, Management
, vol.3
, Issue.2
, pp. 111-124
-
-
Marzouk, M.1
Moselhi, O.2
-
7
-
-
79957473665
-
SIR-VE: A generic tool for value engineering
-
27-29 August, 2008, Irvine, California, USA
-
Marzouk, M. 2008a. SIR-VE: A generic tool for value engineering, in Proc. of the 5th International Engineering and Construction Conference (IECC'5), 27-29 August, 2008, Irvine, California, USA, 663-672.
-
(2008)
th International Engineering and Construction Conference (IECC'5)
, pp. 663-672
-
-
Marzouk, M.1
-
8
-
-
84986108352
-
A superiority and inferiority ranking model for contractor selection
-
Marzouk, M. 2008b. A superiority and inferiority ranking model for contractor selection, Construction Innovation: Information, Process, Management 8(4): 250-268.
-
(2008)
Construction Innovation: Information, Process, Management
, vol.8
, Issue.4
, pp. 250-268
-
-
Marzouk, M.1
-
9
-
-
77955311334
-
Selecting appropriate project delivery system: A fuzzy approach with risk analysis
-
Mostafavi, A.; Karamouz, M. 2010. Selecting appropriate project delivery system: a fuzzy approach with risk analysis, Journal of Construction Engineering and Management ASCE 136(8): 923-930. http://dx.doi.org/10.1061/(ASCE)CO.1943- 7862.0000190
-
(2010)
Journal of Construction Engineering and Management ASCE
, vol.136
, Issue.8
, pp. 923-930
-
-
Mostafavi, A.1
Karamouz, M.2
-
10
-
-
55549104714
-
Choosing a sustainable demolition waste management strategy using multicriteria decision analysis
-
Roussat, N.; Dujet, C.; Méhu, J. 2009. Choosing a sustainable demolition waste management strategy using multicriteria decision analysis, Waste Management 29(1): 12-20. http://dx.doi.org/10.1016/j.wasman.2008.04.010
-
(2009)
Waste Management
, vol.29
, Issue.1
, pp. 12-20
-
-
Roussat, N.1
Dujet, C.2
Méhu, J.3
-
11
-
-
13944271041
-
Selection of concrete pump using the superiority and inferiority ranking method
-
DOI 10.1061/(ASCE)0733-9364(2004)130:6(827)
-
Tam, C. M.; Tong, T. K. L.; Wong, Y. W. 2004. Selection of concrete pump using the superiority and inferiority ranking method, Journal of Construction Engineering and Management ASCE 130(6): 827-834. http://dx.doi.org/10.1061/ (ASCE)0733-9364(2004)130: 6(827 (Pubitemid 40265315)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.6
, pp. 827-834
-
-
Tam, C.M.1
Tong, T.K.L.2
Wong, Y.W.3
-
12
-
-
0041048898
-
A Sensitivity Analysis Approach for Some Deterministic Multi-Criteria Decision-Making Methods
-
Triantaphyllou, E.; Sánchez, A. 1997. A sensitivity analysis approach for some deterministic multi-criteria decision making methods, Decision Sciences 28(1): 151-194. http://dx.doi.org/10.1111/j.1540-5915.1997.tb01306.x (Pubitemid 127070910)
-
(1997)
Decision Sciences
, vol.28
, Issue.1
, pp. 151-194
-
-
Triantaphyllou, E.1
Sanchez, A.2
-
13
-
-
73349091546
-
A multiple criteria decision making approach to the selection of concrete pumps
-
Ulubeyli, S.; Kazaz, A. 2009. A multiple criteria decision making approach to the selection of concrete pumps, Journal of Civil Engineering and Management 15(4): 369-376. http://dx.doi.org/10.3846/1392-3730.2009.15.369-376
-
(2009)
Journal of Civil Engineering and Management
, vol.15
, Issue.4
, pp. 369-376
-
-
Ulubeyli, S.1
Kazaz, A.2
-
14
-
-
84872972471
-
Fighting climate change: Human solidarity in a divided world
-
UNDP [cited 10 April 2010]. Available from Internet
-
UNDP. 2010. Fighting climate change: human solidarity in a divided world. The 2007/2008 Human Development Report. United Nations Development Programme [cited 10 April 2010]. Available from Internet: http://hdr.undp.org/en/media/ HDR-20072008-EN-Complete.pdf
-
(2010)
The 2007/2008 Human Development Report United Nations Development Programme
-
-
-
15
-
-
42549117975
-
Resource management of bridge deck rehabilitation: Jacques cartier bridge case study
-
DOI 10.1061/(ASCE)0733-9364(2008)134:5(311)
-
Zhang, C.; Zayed, T.; Hammad, A. 2008. Resource management of bridge deck rehabilitation: Jacques Cartier bridge case study, Journal of Construction Engineering and Management ASCE 134(5): 311-319. http://dx.doi.org/10.1061/ (ASCE)0733-9364(2008)134:5(311 (Pubitemid 351578585)
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, Issue.5
, pp. 311-319
-
-
Zhang, C.1
Zayed, T.2
Hammad, A.3
|