-
1
-
-
0033351012
-
-
" Proc., Winter Simulation Conf., Phoenix.
-
AbouRizk, S. M., Ruwanpura, J. Y., Er, K. C., and Fernando, S. (1999). " Special purpose simulation template for utility tunnel construction.." Proc., Winter Simulation Conf., Phoenix, 948-955.
-
(1999)
Special Purpose Simulation Template for Utility Tunnel Construction
, pp. 948-955
-
-
Abourizk, S.M.1
Ruwanpura, J.Y.2
Er, K.C.3
Fernando, S.4
-
3
-
-
42549147262
-
-
Buckland & Taylor Ltd. Bridge Engineering.. "." 〈 http://www.b-t.com/projects/liongate.htm 〉 (Oct. 31, 2006).
-
Buckland & Taylor Ltd. Bridge Engineering. (2006). " Lions' Gate Bridge.." 〈 http://www.b-t.com/projects/liongate.htm 〉 (Oct. 31, 2006).
-
(2006)
Lions' Gate Bridge
-
-
-
4
-
-
27144472763
-
-
" Proc., Int. Conf. on Computing in Civil Engineering, ASCE, Reston, Va..
-
Elbeltagi, E., Elbehairy, H., Hegazy, T., and Grierson, D. (2005). " Evolutionary algorithms for optimizing bridge deck rehabilitation.." Proc., Int. Conf. on Computing in Civil Engineering, ASCE, Reston, Va., 619-630.
-
(2005)
Evolutionary Algorithms for Optimizing Bridge Deck Rehabilitation
, pp. 619-630
-
-
Elbeltagi, E.1
Elbehairy, H.2
Hegazy, T.3
Grierson, D.4
-
6
-
-
0033315084
-
-
Proc., Winter Simulation Conf., Phoenix.
-
Hajjar, D., and AbouRizk, S. M. (1999). " Simphony: An environment for building special purpose construction simulation tools.." Proc., Winter Simulation Conf., Phoenix, 998-1006.
-
(1999)
Simphony: An Environment for Building Special Purpose Construction Simulation Tools
, pp. 998-1006
-
-
Hajjar, D.1
Abourizk, S.M.2
-
8
-
-
42549102010
-
-
I-95 James River Bridge.. "" 〈 http://www. roadstothefuture.com/I95_JRB_Restoration.html 〉 (Mar. 10, 2007).
-
I-95 James River Bridge. (2002). " I-95 James River Bridge restoration. " 〈 http://www.roadstothefuture.com/I95_JRB_Restoration. html 〉 (Mar. 10, 2007).
-
(2002)
I-95 James River Bridge Restoration
-
-
-
9
-
-
0031281662
-
-
" CAD, (6).
-
Liu, C., Hammad, A., and Itoh, Y. (1997). " Multiobjective optimization of bridge deck rehabilitation using a genetic algorithm.." CAD, 12 (6), 431-444.
-
(1997)
Multiobjective Optimization of Bridge Deck Rehabilitation Using A Genetic Algorithm
, vol.12
, pp. 431-444
-
-
Liu, C.1
Hammad, A.2
Itoh, Y.3
-
10
-
-
0032272973
-
-
Proc., Winter Simulation Conf., Washington, D.C..
-
Martinez, J. C. (1998). " EZStrobe-General-purpose simulation system based on activity cycle diagrams.." Proc., Winter Simulation Conf., Washington, D.C., 341-348.
-
(1998)
EZStrobe-General-purpose Simulation System Based on Activity Cycle Diagrams
, pp. 341-348
-
-
Martinez, J.C.1
-
11
-
-
0035197703
-
-
" Transportation Research Record. 1744, Transportation Research Board, Washington, D.C..
-
Martinez, J. C., Trani, A., and Ioannou, P. (2001). " Modeling air-side airport operations using general-purpose activity-based discrete-event simulation.." Transportation Research Record. 1744, Transportation Research Board, Washington, D.C., 65-71.
-
(2001)
Modeling Air-side Airport Operations Using General-purpose Activity-based Discrete-event Simulation
, pp. 65-71
-
-
Martinez, J.C.1
Trani, A.2
Ioannou, P.3
-
13
-
-
0036929649
-
-
Proc., Winter Simulation Conf., San Diego.
-
Olafsson, S., and Kim, J. (2002). " Simulation optimization.." Proc., Winter Simulation Conf., San Diego, 79-84.
-
(2002)
Simulation Optimization
, pp. 79-84
-
-
Olafsson, S.1
Kim, J.2
-
14
-
-
42549166313
-
-
PJCCI.. 〈 http://www.pjcci.ca/English/jacques-cartier/INTRO.HTM 〉 (March 10, 2007).
-
PJCCI. (2007). 〈 http://www.pjcci.ca/English/jacques-cartier/INTRO. HTM 〉 (March 10, 2007).
-
(2007)
-
-
-
17
-
-
42549127615
-
-
Bridges: Structural condition assessment, Wiley, New York.
-
Yanev, B. S. (2005). Bridges: Structural condition assessment, Wiley, New York, 329-405.
-
(2005)
, pp. 329-405
-
-
Yanev, B.S.1
-
18
-
-
0242664925
-
-
PCI J., (5).
-
Zaki, A. R., and Mailhot, G. (2003). " Deck reconstruction of Jacques Cartier Bridge using precast prestressed high performance concrete panels.." PCI J., 48 (5), 20-33.
-
(2003)
Deck Reconstruction of Jacques Cartier Bridge Using Precast Prestressed High Performance Concrete Panels
, vol.48
, pp. 20-33
-
-
Zaki, A.R.1
Mailhot, G.2
-
19
-
-
0035278717
-
-
J. Constr. Eng. Manage., (2).
-
Zayed, T. M., and Halpin, D. (2001). " Simulation as a tool resource management.." J. Constr. Eng. Manage., 127 (2), 132-141.
-
(2001)
Simulation As A Tool Resource Management
, vol.127
, pp. 132-141
-
-
Zayed, T.M.1
Halpin, D.2
-
20
-
-
42549153573
-
-
Proc., Joint Int., Conf. on Computing and Decision Making in Civil and Building Engineering, Montreal.
-
Zhang, C., and Hammad, A. (2006). " Spatio-temporal representation and analysis in infrastructure systems.. " Proc., Joint Int., Conf. on Computing and Decision Making in Civil and Building Engineering, Montreal,.
-
(2006)
Spatio-temporal Representation and Analysis in Infrastructure Systems.
-
-
Zhang, C.1
Hammad, A.2
|