메뉴 건너뛰기




Volumn 6146 LNCS, Issue PART 2, 2010, Pages 243-251

A capacitated production planning problem for closed-loop supply chain

Author keywords

capacitated production planning; closed loop supply chain; genetic algorithms; inventory; lot sizing (batches)

Indexed keywords

CLOSED-LOOP SUPPLY CHAIN; HEURISTIC APPROACH; INVENTORY LOT-SIZING; LARGE-SCALE PROBLEM; NUMERICAL SIMULATION; PRODUCTION PLANNING; REMANUFACTURING PROCESS; SETUP COSTS; SIMULATION RESULT; TIME VARYING;

EID: 77954626382     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/978-3-642-13498-2_32     Document Type: Conference Paper
Times cited : (2)

References (6)
  • 2
    • 34250019890 scopus 로고    scopus 로고
    • Closed-loop supply chain network equilibrium under legislation
    • Hammond, D., Beullens, P.: Closed-loop supply chain network equilibrium under legislation. European Journal of Operational Research 183(2), 895-908 (2007)
    • (2007) European Journal of Operational Research , vol.183 , Issue.2 , pp. 895-908
    • Hammond, D.1    Beullens, P.2
  • 3
    • 1642269093 scopus 로고    scopus 로고
    • Closed-loop supply chain models with product remanufacturing
    • Savaskan, R.C., Bhattacharya, S., Van Wassenhove, L.N.: Closed-loop supply chain models with product remanufacturing. Manage. Sci. 50(2), 239-252 (2004)
    • (2004) Manage. Sci. , vol.50 , Issue.2 , pp. 239-252
    • Savaskan, R.C.1    Bhattacharya, S.2    Van Wassenhove, L.N.3
  • 6
    • 0001962762 scopus 로고
    • Dynamic version of the economic lot size model
    • Wagner, H.M., Whitin, T.M.: Dynamic version of the economic lot size model. Manage. Sci. 5, 89-96 (1958)
    • (1958) Manage. Sci. , vol.5 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.