-
1
-
-
0020888108
-
The allocation of inter-stage buffer capacities in production lines
-
Altiok, T. and Stidham, S., 1983. The allocation of inter-stage buffer capacities in production lines. IIE Transactions, 15 (4), 292-299.
-
(1983)
IIE Transactions
, vol.15
, Issue.4
, pp. 292-299
-
-
Altiok, T.1
Stidham, S.2
-
2
-
-
33746786332
-
Analysis and design of split and merge unpaced assembly systems by metamodelling and stochastic search
-
Bulgak, A.A., 2006. Analysis and design of split and merge unpaced assembly systems by metamodelling and stochastic search. International Journal of Production Research, 44 (18/19), 4067-4080.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.18-19
, pp. 4067-4080
-
-
Bulgak, A.A.1
-
3
-
-
0001147217
-
Buffer size optimization in asynchronous assembly systems using genetic algorithms
-
Bulgak, A.A., Diwan, P.D., and Inozu, B., 1995. Buffer size optimization in asynchronous assembly systems using genetic algorithms. Computers and Industrial Engineering, 28 (2), 309-322.
-
(1995)
Computers and Industrial Engineering
, vol.28
, Issue.2
, pp. 309-322
-
-
Bulgak, A.A.1
Diwan, P.D.2
Inozu, B.3
-
4
-
-
0031675599
-
Optimal (s, S) policies for manufacturing systems of unreliable machines in tandem
-
19-22 January, Anaheim, California, USA. New York: IEEE Conference Publications
-
Ching, W.K., 1998. Optimal (s, S) policies for manufacturing systems of unreliable machines in tandem. Proceedings of the 1998 reliability and maintainability symposium, 19-22 January, Anaheim, California, USA. New York: IEEE Conference Publications, 365-371.
-
(1998)
The 1998 Reliability and Maintainability Symposium
, pp. 365-371
-
-
Ching, W.K.1
-
5
-
-
0023981046
-
The role of work in progress inventory in serial production lines
-
Conway, R., et al., 1988. The role of work in progress inventory in serial production lines. Operations Research, 36 (2), 229-241.
-
(1988)
Operations Research
, vol.36
, Issue.2
, pp. 229-241
-
-
Conway, R.1
-
6
-
-
1642563658
-
A potpourri on the theme of lean buffering
-
19-22 May 2001, Tinos Island, Greece. IIE Transactions
-
Enginarlar, E., Li, J., and Meerkov, S.M., 2001. A potpourri on the theme of lean buffering. Proceedings of 3rd Aegean international conference on design and analysis of manufacturing systems, 19-22 May 2001, Tinos Island, Greece. IIE Transactions, 249-258.
-
(2001)
3rd Aegean International Conference on Design and Analysis of Manufacturing Systems
, pp. 249-258
-
-
Enginarlar, E.1
Li, J.2
Meerkov, S.M.3
-
7
-
-
0037085111
-
Buffer capacity for accommodating machine downtime in serial production lines
-
Enginarlar, E., et al., 2002. Buffer capacity for accommodating machine downtime in serial production lines. International Journal of Production Research, 40 (3), 601-624.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.3
, pp. 601-624
-
-
Enginarlar, E.1
-
8
-
-
17444397754
-
Lean buffering in serial production lines with non-exponential machines
-
Enginarlar, E., Li, J., and Meerkov, S.M., 2005. Lean buffering in serial production lines with non-exponential machines. OR Spectrum, 27, 195-219.
-
(2005)
OR Spectrum
, vol.27
, pp. 195-219
-
-
Enginarlar, E.1
Li, J.2
Meerkov, S.M.3
-
9
-
-
0034418438
-
Efficient algorithms for buffer space allocation
-
Gershwin, S.B. and Schor, J.E., 2000. Efficient algorithms for buffer space allocation. Annals of Operations Research, 93, 117-144.
-
(2000)
Annals of Operations Research
, vol.93
, pp. 117-144
-
-
Gershwin, S.B.1
Schor, J.E.2
-
11
-
-
0035922496
-
Cash-flow-orientated buffer allocation in stochastic flow lines
-
Helber, S., 2001. Cash-flow-orientated buffer allocation in stochastic flow lines. International Journal of Production Management, 39 (14), 3061-3083.
-
(2001)
International Journal of Production Management
, vol.39
, Issue.14
, pp. 3061-3083
-
-
Helber, S.1
-
12
-
-
0026239015
-
The effect of machine breakdowns and interstage storage on the performance of production line systems
-
Hillier, F.S. and So, K.C., 1991. The effect of machine breakdowns and interstage storage on the performance of production line systems. International Journal of Production Research, 29 (10), 2043-2055.
-
(1991)
International Journal of Production Research
, vol.29
, Issue.10
, pp. 2043-2055
-
-
Hillier, F.S.1
So, K.C.2
-
13
-
-
0027578808
-
Estimating throughput in an unbalanced assembly like flow system
-
Hopp, W.J. and Simon, J.T., 1993. Estimating throughput in an unbalanced assembly like flow system. International Journal of Production Research, 31 (4), 851-868.
-
(1993)
International Journal of Production Research
, vol.31
, Issue.4
, pp. 851-868
-
-
Hopp, W.J.1
Simon, J.T.2
-
14
-
-
0000285320
-
Empirical evaluation of exponential and independence assumptions in queuing models of manufacturing systems
-
Inman, R.R., 1999. Empirical evaluation of exponential and independence assumptions in queuing models of manufacturing systems. Production and Operations Management, 8 (4), 409-432.
-
(1999)
Production and Operations Management
, vol.8
, Issue.4
, pp. 409-432
-
-
Inman, R.R.1
-
15
-
-
0035497187
-
Allocation of buffer capacity to minimize average work-in-process
-
Kim, S. and Lee, H.J., 2001. Allocation of buffer capacity to minimize average work-in-process. Production Planning & Control, 12 (7), 706-716.
-
(2001)
Production Planning & Control
, vol.12
, Issue.7
, pp. 706-716
-
-
Kim, S.1
Lee, H.J.2
-
16
-
-
77952622121
-
An exploratory study of protective inventory in a re-entrant line with protective capacity
-
Kim, S., Cox, J.F., and Mabin, V.J., 2010. An exploratory study of protective inventory in a re-entrant line with protective capacity. International Journal of Production Research, 48 (14), 4153-4178.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.14
, pp. 4153-4178
-
-
Kim, S.1
Cox, J.F.2
Mabin, V.J.3
-
19
-
-
70449688145
-
Throughput analysis of production systems: Recent advances and future topics
-
Li, J., et al., 2009. Throughput analysis of production systems: recent advances and future topics. International Journal of Production Research, 47 (14-15), 3823-3851.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.14-15
, pp. 3823-3851
-
-
Li, J.1
-
21
-
-
33745863553
-
A new approach for buffer allocation in unreliable production lines
-
Nahas, N., Ait-Kadi, D., and Nourelfath, M., 2006. A new approach for buffer allocation in unreliable production lines. International Journal of Production Economics, 103 (2), 873-881.
-
(2006)
International Journal of Production Economics
, vol.103
, Issue.2
, pp. 873-881
-
-
Nahas, N.1
Ait-Kadi, D.2
Nourelfath, M.3
-
22
-
-
84871265826
-
An unreliable series production line: Keeping it running with buffer stocks
-
Ovuworie, G.C., 1982a. An unreliable series production line: keeping it running with buffer stocks. International Journal of Production Research, 20 (5), 607-617.
-
(1982)
International Journal of Production Research
, vol.20
, Issue.5
, pp. 607-617
-
-
Ovuworie, G.C.1
-
23
-
-
8544282894
-
Some simulation results of a model of an unreliable series production system
-
Ovuworie, G.C., 1982b. Some simulation results of a model of an unreliable series production system. International Journal of Production Research, 20 (5), 619-627.
-
(1982)
International Journal of Production Research
, vol.20
, Issue.5
, pp. 619-627
-
-
Ovuworie, G.C.1
-
25
-
-
0033298757
-
Optimal buffer allocation in short balanced unreliable production lines
-
Papadopoulos, H.T. and Vidalis, M.I., 1999. Optimal buffer allocation in short-balanced unreliable production lines. Computer and Industrial Engineering, 37 (4), 691-710.
-
(1999)
Computer and Industrial Engineering
, vol.37
, Issue.4
, pp. 691-710
-
-
Papadopoulos, H.T.1
Vidalis, M.I.2
-
26
-
-
33745005949
-
Analysis of serial production lines: Characterisation study and a new heuristic procedure for optimal buffer allocation
-
Sabuncuoglu, I., Erel, E., and Gocgun, Y., 2006. Analysis of serial production lines: characterisation study and a new heuristic procedure for optimal buffer allocation. International Journal of Production Research, 44 (13), 2499-2523.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.13
, pp. 2499-2523
-
-
Sabuncuoglu, I.1
Erel, E.2
Gocgun, Y.3
-
27
-
-
84871339011
-
The performance of unpaced lines with unequal buffer sizes
-
9-12 December, Miami, US. New York: The Business Review, Cambridge
-
Shaaban, S. and McNamara, T., 2009. The performance of unpaced lines with unequal buffer sizes. Economics and international research conference, 9-12 December, Miami, US. New York: The Business Review, Cambridge, 105-110.
-
(2009)
International Research Conference
, pp. 105-110
-
-
Shaaban, S.1
McNamara, T.2
-
28
-
-
84880573454
-
The segmentation method for long line optimization
-
May/June, Kusadasi, Turkey. Ankara, Turkey: SMMSO - Stochastic Models of Manufacturing and Service Operations
-
Shi, C. and Gershwin, S.B., 2011. The segmentation method for long line optimization. Proceedings of the 8th international conference in stochastic models of manufacturing and service Operations (SMMSO 8th), May/June, Kusadasi, Turkey. Ankara, Turkey: SMMSO - Stochastic Models of Manufacturing and Service Operations, 128-135.
-
(2011)
Proceedings of the 8th International Conference in Stochastic Models of Manufacturing and Service Operations (SMMSO 8th)
, pp. 128-135
-
-
Shi, C.1
Gershwin, S.B.2
-
30
-
-
0242270555
-
Practical considerations in the optimization of flow production systems
-
Tempelmeier, H., 2003. Practical considerations in the optimization of flow production systems. International Journal of Production Research, 41 (1), 149-170.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.1
, pp. 149-170
-
-
Tempelmeier, H.1
-
31
-
-
70449639984
-
A new method for the placement of buffers in serial production lines
-
Vergara, H.A. and Kim, D.S., 2009. A new method for the placement of buffers in serial production lines. International Journal of Production Research, 47 (15-16), 4437-4456.
-
(2009)
International Journal of Production Research
, vol.47
, Issue.15-16
, pp. 4437-4456
-
-
Vergara, H.A.1
Kim, D.S.2
-
32
-
-
0032351556
-
Buffer allocation in unreliable production lines using a knowledge based system
-
Vouros, G.A. and Papadopoulos, H.T., 1998. Buffer allocation in unreliable production lines using a knowledge based system. Computers and Operations Research, 25 (12), 1055-1067.
-
(1998)
Computers and Operations Research
, vol.25
, Issue.12
, pp. 1055-1067
-
-
Vouros, G.A.1
Papadopoulos, H.T.2
|