Volumn 124, Issue 1, 2010, Pages 151-158

Scheduling problems with multiple maintenance activities and non-preemptive jobs on two identical parallel machines

Author keywords

Bin packing problem; Makespan; Multiple maintenance; Scheduling; Total completion time; Two parallel machine

Indexed keywords

BIN PACKING PROBLEM; MAINTENANCE SCHEDULING; MAKESPAN; PARALLEL MACHINE; TOTAL COMPLETION TIME;

EID: 74449083455     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2009.10.018     Document Type: Article
Times cited : (79)

References (26)
  • 1
    • 33750299162 scopus 로고    scopus 로고
    • The role of maintenance in improving companies productivity and profitability
    • Alsyouf I. The role of maintenance in improving companies productivity and profitability. International Journal of Production Economics 105 (2007) 70-78
    • (2007) International Journal of Production Economics , vol.105 , pp. 70-78
    • Alsyouf, I.1
  • 2
    • 69249221297 scopus 로고    scopus 로고
    • Maintenance practices in Swedish industries: survey results
    • Alsyouf I. Maintenance practices in Swedish industries: survey results. International Journal of Production Economics 121 (2009) 212-223
    • (2009) International Journal of Production Economics , vol.121 , pp. 212-223
    • Alsyouf, I.1
  • 4
    • 0013101867 scopus 로고    scopus 로고
    • Scheduling with tool changes to minimize total completion time
    • Technical Report, Department of Industrial Engineering, Bilkent University, Ankara, Turkey
    • Akturk, M.S., Ghosh, J.B., Gunes, E.D., 1999. Scheduling with tool changes to minimize total completion time. Technical Report, Department of Industrial Engineering, Bilkent University, Ankara, Turkey.
    • (1999)
    • Akturk, M.S.1    Ghosh, J.B.2    Gunes, E.D.3
  • 5
    • 0037316821 scopus 로고    scopus 로고
    • Scheduling with tool changes to minimize total completion time: a study of heuristics and their performance
    • Akturk M.S., Ghosh J.B., and Gunes E.D. Scheduling with tool changes to minimize total completion time: a study of heuristics and their performance. Naval Research Logistics 50 (2003) 15-30
    • (2003) Naval Research Logistics , vol.50 , pp. 15-30
    • Akturk, M.S.1    Ghosh, J.B.2    Gunes, E.D.3
  • 6
    • 2342558624 scopus 로고    scopus 로고
    • Scheduling with tool changes to minimize total completion time: basic results and SPT performance
    • Akturk M.S., Ghosh J.B., and Gunes E.D. Scheduling with tool changes to minimize total completion time: basic results and SPT performance. European Journal of Operational Research 157 (2004) 784-790
    • (2004) European Journal of Operational Research , vol.157 , pp. 784-790
    • Akturk, M.S.1    Ghosh, J.B.2    Gunes, E.D.3
  • 7
    • 38749090130 scopus 로고    scopus 로고
    • Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan
    • Allaouia H., Lamourib S., Artibab A., and Aghezzaf E. Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan. International Journal of Production Economics 112 (2008) 161-167
    • (2008) International Journal of Production Economics , vol.112 , pp. 161-167
    • Allaouia, H.1    Lamourib, S.2    Artibab, A.3    Aghezzaf, E.4
  • 11
    • 33645218963 scopus 로고    scopus 로고
    • Minimizing total flow time in the single-machine scheduling problem with periodic maintenance
    • Chen W.J. Minimizing total flow time in the single-machine scheduling problem with periodic maintenance. Journal of Operational Research Society 57 (2006) 410-415
    • (2006) Journal of Operational Research Society , vol.57 , pp. 410-415
    • Chen, W.J.1
  • 12
    • 0034206108 scopus 로고    scopus 로고
    • An improved heuristic for two machine flowshop scheduling with an availability constraint
    • Cheng T.C.E., and Wang G. An improved heuristic for two machine flowshop scheduling with an availability constraint. Operations Research Letters 26 (2000) 223-229
    • (2000) Operations Research Letters , vol.26 , pp. 223-229
    • Cheng, T.C.E.1    Wang, G.2
  • 13
    • 45049085168 scopus 로고    scopus 로고
    • The role of industrial maintenance in the maquiladora industry: an empirical analysis
    • Dowlatshahi S. The role of industrial maintenance in the maquiladora industry: an empirical analysis. International Journal of Production Economics 114 (2008) 298-307
    • (2008) International Journal of Production Economics , vol.114 , pp. 298-307
    • Dowlatshahi, S.1
  • 15
    • 0003622855 scopus 로고
    • Ph.D. Thesis, Massachusetts Institute of Technology, Department of Mathematics, Cambridge
    • Johnson, D.S., 1973. Near-optimal bin packing algorithms. Ph.D. Thesis, Massachusetts Institute of Technology, Department of Mathematics, Cambridge.
    • (1973) Near-optimal bin packing algorithms
    • Johnson, D.S.1
  • 16
    • 33749681702 scopus 로고    scopus 로고
    • Single-machine scheduling with periodic maintenance to minimize makespan
    • Ji M., He Y., and Cheng T.C.E. Single-machine scheduling with periodic maintenance to minimize makespan. Computers & Operations Research 34 (2007) 1764-1770
    • (2007) Computers & Operations Research , vol.34 , pp. 1764-1770
    • Ji, M.1    He, Y.2    Cheng, T.C.E.3
  • 17
    • 0034159705 scopus 로고    scopus 로고
    • Scheduling jobs and maintenance activities on parallel machines
    • Lee C.Y., and Chen Z.L. Scheduling jobs and maintenance activities on parallel machines. Naval Research Logistics 47 (2000) 145-165
    • (2000) Naval Research Logistics , vol.47 , pp. 145-165
    • Lee, C.Y.1    Chen, Z.L.2
  • 18
    • 0026897390 scopus 로고
    • Single machine flow-time scheduling with scheduled maintenance
    • Lee C.Y., and Liman S.D. Single machine flow-time scheduling with scheduled maintenance. Acta Informatica 29 (1992) 375-382
    • (1992) Acta Informatica , vol.29 , pp. 375-382
    • Lee, C.Y.1    Liman, S.D.2
  • 19
    • 38249005916 scopus 로고
    • Capacitated two-parallel machines scheduling to minimize sum of job completion times
    • Lee C.Y., and Liman S.D. Capacitated two-parallel machines scheduling to minimize sum of job completion times. Discrete Applied Mathematics 41 (1993) 211-222
    • (1993) Discrete Applied Mathematics , vol.41 , pp. 211-222
    • Lee, C.Y.1    Liman, S.D.2
  • 20
    • 0037411886 scopus 로고    scopus 로고
    • Single-machine scheduling with periodic maintenance and nonresumable jobs
    • Liao C.J., and Chen W.J. Single-machine scheduling with periodic maintenance and nonresumable jobs. Computers & Operations Research 30 (2003) 1335-1347
    • (2003) Computers & Operations Research , vol.30 , pp. 1335-1347
    • Liao, C.J.1    Chen, W.J.2
  • 21
    • 0032628442 scopus 로고    scopus 로고
    • Single machine scheduling to meet due times under shutdown constraints
    • Makoto A., and Hiroshi O. Single machine scheduling to meet due times under shutdown constraints. International Journal of Production Economics 60-61 (1999) 537-547
    • (1999) International Journal of Production Economics , vol.60-61 , pp. 537-547
    • Makoto, A.1    Hiroshi, O.2
  • 22
    • 33747120545 scopus 로고    scopus 로고
    • An empirical investigation on the relationship between business and maintenance strategies
    • Pinjala S.K., Pintelon L., and Vereecke A. An empirical investigation on the relationship between business and maintenance strategies. International Journal of Production Economics 104 (2006) 214-229
    • (2006) International Journal of Production Economics , vol.104 , pp. 214-229
    • Pinjala, S.K.1    Pintelon, L.2    Vereecke, A.3
  • 23
    • 33751164384 scopus 로고    scopus 로고
    • A note on worst-case performance of heuristics for maintenance scheduling problems
    • Qi X. A note on worst-case performance of heuristics for maintenance scheduling problems. Discrete Applied Mathematics 155 (2007) 416-422
    • (2007) Discrete Applied Mathematics , vol.155 , pp. 416-422
    • Qi, X.1
  • 25
    • 0028445097 scopus 로고
    • New worst-case results for the bin packing problem
    • Simchi-Levi D. New worst-case results for the bin packing problem. Naval Research Logistics 41 (1994) 579-585
    • (1994) Naval Research Logistics , vol.41 , pp. 579-585
    • Simchi-Levi, D.1
  • 26
    • 34548655710 scopus 로고    scopus 로고
    • Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan
    • Xu D.H., Sun K.B., and Li H.X. Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan. Computers & Operations Research 35 (2008) 1344-1349
    • (2008) Computers & Operations Research , vol.35 , pp. 1344-1349
    • Xu, D.H.1    Sun, K.B.2    Li, H.X.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.