-
1
-
-
33750299162
-
The role of maintenance in improving companies productivity and profitability
-
Alsyouf I. The role of maintenance in improving companies productivity and profitability. International Journal of Production Economics 105 (2007) 70-78
-
(2007)
International Journal of Production Economics
, vol.105
, pp. 70-78
-
-
Alsyouf, I.1
-
2
-
-
69249221297
-
Maintenance practices in Swedish industries: survey results
-
Alsyouf I. Maintenance practices in Swedish industries: survey results. International Journal of Production Economics 121 (2009) 212-223
-
(2009)
International Journal of Production Economics
, vol.121
, pp. 212-223
-
-
Alsyouf, I.1
-
4
-
-
0013101867
-
Scheduling with tool changes to minimize total completion time
-
Technical Report, Department of Industrial Engineering, Bilkent University, Ankara, Turkey
-
Akturk, M.S., Ghosh, J.B., Gunes, E.D., 1999. Scheduling with tool changes to minimize total completion time. Technical Report, Department of Industrial Engineering, Bilkent University, Ankara, Turkey.
-
(1999)
-
-
Akturk, M.S.1
Ghosh, J.B.2
Gunes, E.D.3
-
5
-
-
0037316821
-
Scheduling with tool changes to minimize total completion time: a study of heuristics and their performance
-
Akturk M.S., Ghosh J.B., and Gunes E.D. Scheduling with tool changes to minimize total completion time: a study of heuristics and their performance. Naval Research Logistics 50 (2003) 15-30
-
(2003)
Naval Research Logistics
, vol.50
, pp. 15-30
-
-
Akturk, M.S.1
Ghosh, J.B.2
Gunes, E.D.3
-
6
-
-
2342558624
-
Scheduling with tool changes to minimize total completion time: basic results and SPT performance
-
Akturk M.S., Ghosh J.B., and Gunes E.D. Scheduling with tool changes to minimize total completion time: basic results and SPT performance. European Journal of Operational Research 157 (2004) 784-790
-
(2004)
European Journal of Operational Research
, vol.157
, pp. 784-790
-
-
Akturk, M.S.1
Ghosh, J.B.2
Gunes, E.D.3
-
7
-
-
38749090130
-
Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan
-
Allaouia H., Lamourib S., Artibab A., and Aghezzaf E. Simultaneously scheduling n jobs and the preventive maintenance on the two-machine flow shop to minimize the makespan. International Journal of Production Economics 112 (2008) 161-167
-
(2008)
International Journal of Production Economics
, vol.112
, pp. 161-167
-
-
Allaouia, H.1
Lamourib, S.2
Artibab, A.3
Aghezzaf, E.4
-
11
-
-
33645218963
-
Minimizing total flow time in the single-machine scheduling problem with periodic maintenance
-
Chen W.J. Minimizing total flow time in the single-machine scheduling problem with periodic maintenance. Journal of Operational Research Society 57 (2006) 410-415
-
(2006)
Journal of Operational Research Society
, vol.57
, pp. 410-415
-
-
Chen, W.J.1
-
12
-
-
0034206108
-
An improved heuristic for two machine flowshop scheduling with an availability constraint
-
Cheng T.C.E., and Wang G. An improved heuristic for two machine flowshop scheduling with an availability constraint. Operations Research Letters 26 (2000) 223-229
-
(2000)
Operations Research Letters
, vol.26
, pp. 223-229
-
-
Cheng, T.C.E.1
Wang, G.2
-
13
-
-
45049085168
-
The role of industrial maintenance in the maquiladora industry: an empirical analysis
-
Dowlatshahi S. The role of industrial maintenance in the maquiladora industry: an empirical analysis. International Journal of Production Economics 114 (2008) 298-307
-
(2008)
International Journal of Production Economics
, vol.114
, pp. 298-307
-
-
Dowlatshahi, S.1
-
15
-
-
0003622855
-
-
Ph.D. Thesis, Massachusetts Institute of Technology, Department of Mathematics, Cambridge
-
Johnson, D.S., 1973. Near-optimal bin packing algorithms. Ph.D. Thesis, Massachusetts Institute of Technology, Department of Mathematics, Cambridge.
-
(1973)
Near-optimal bin packing algorithms
-
-
Johnson, D.S.1
-
16
-
-
33749681702
-
Single-machine scheduling with periodic maintenance to minimize makespan
-
Ji M., He Y., and Cheng T.C.E. Single-machine scheduling with periodic maintenance to minimize makespan. Computers & Operations Research 34 (2007) 1764-1770
-
(2007)
Computers & Operations Research
, vol.34
, pp. 1764-1770
-
-
Ji, M.1
He, Y.2
Cheng, T.C.E.3
-
17
-
-
0034159705
-
Scheduling jobs and maintenance activities on parallel machines
-
Lee C.Y., and Chen Z.L. Scheduling jobs and maintenance activities on parallel machines. Naval Research Logistics 47 (2000) 145-165
-
(2000)
Naval Research Logistics
, vol.47
, pp. 145-165
-
-
Lee, C.Y.1
Chen, Z.L.2
-
18
-
-
0026897390
-
Single machine flow-time scheduling with scheduled maintenance
-
Lee C.Y., and Liman S.D. Single machine flow-time scheduling with scheduled maintenance. Acta Informatica 29 (1992) 375-382
-
(1992)
Acta Informatica
, vol.29
, pp. 375-382
-
-
Lee, C.Y.1
Liman, S.D.2
-
19
-
-
38249005916
-
Capacitated two-parallel machines scheduling to minimize sum of job completion times
-
Lee C.Y., and Liman S.D. Capacitated two-parallel machines scheduling to minimize sum of job completion times. Discrete Applied Mathematics 41 (1993) 211-222
-
(1993)
Discrete Applied Mathematics
, vol.41
, pp. 211-222
-
-
Lee, C.Y.1
Liman, S.D.2
-
20
-
-
0037411886
-
Single-machine scheduling with periodic maintenance and nonresumable jobs
-
Liao C.J., and Chen W.J. Single-machine scheduling with periodic maintenance and nonresumable jobs. Computers & Operations Research 30 (2003) 1335-1347
-
(2003)
Computers & Operations Research
, vol.30
, pp. 1335-1347
-
-
Liao, C.J.1
Chen, W.J.2
-
21
-
-
0032628442
-
Single machine scheduling to meet due times under shutdown constraints
-
Makoto A., and Hiroshi O. Single machine scheduling to meet due times under shutdown constraints. International Journal of Production Economics 60-61 (1999) 537-547
-
(1999)
International Journal of Production Economics
, vol.60-61
, pp. 537-547
-
-
Makoto, A.1
Hiroshi, O.2
-
23
-
-
33751164384
-
A note on worst-case performance of heuristics for maintenance scheduling problems
-
Qi X. A note on worst-case performance of heuristics for maintenance scheduling problems. Discrete Applied Mathematics 155 (2007) 416-422
-
(2007)
Discrete Applied Mathematics
, vol.155
, pp. 416-422
-
-
Qi, X.1
-
25
-
-
0028445097
-
New worst-case results for the bin packing problem
-
Simchi-Levi D. New worst-case results for the bin packing problem. Naval Research Logistics 41 (1994) 579-585
-
(1994)
Naval Research Logistics
, vol.41
, pp. 579-585
-
-
Simchi-Levi, D.1
-
26
-
-
34548655710
-
Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan
-
Xu D.H., Sun K.B., and Li H.X. Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespan. Computers & Operations Research 35 (2008) 1344-1349
-
(2008)
Computers & Operations Research
, vol.35
, pp. 1344-1349
-
-
Xu, D.H.1
Sun, K.B.2
Li, H.X.3
|