메뉴 건너뛰기




Volumn 51, Issue 5, 2013, Pages 1426-1450

A coordinated two-phase approach for operational decisions with vehicle routing in a single-vendor multi-buyer system

Author keywords

Controllable lead time; Multi buyer; Service level constraint; Vehicle routing

Indexed keywords

CONTROLLABLE LEAD-TIME; DIFFERENT SPEED; FINITE PRODUCTION RATE; ITERATIVE APPROACH; LEAD TIME REDUCTION; LEADTIME; MULTI-BUYER; NUMERICAL EXAMPLE; OPERATIONAL DECISIONS; SERVICE LEVEL CONSTRAINT; SOLUTION APPROACH; TRANSPORTATION COST; VEHICLE TYPES;

EID: 84871241531     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2012.693962     Document Type: Article
Times cited : (15)

References (45)
  • 1
    • 84985846646 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor
    • Banerjee, A., 1986. A joint economic-lot-size model for purchaser and vendor. Decision Sciences, 17 (3), 292-311.
    • (1986) Decision Sciences , vol.17 , Issue.3 , pp. 292-311
    • Banerjee, A.1
  • 2
    • 69849087762 scopus 로고    scopus 로고
    • Heuristics for a multiperiod inventory routing problem with production decisions
    • Bard, J.F. and Nananukul, N., 2009a. Heuristics for a multiperiod inventory routing problem with production decisions. Computers and Industrial Engineering, 57 (3), 713-723.
    • (2009) Computers and Industrial Engineering , vol.57 , Issue.3 , pp. 713-723
    • Bard, J.F.1    Nananukul, N.2
  • 3
    • 67349211770 scopus 로고    scopus 로고
    • The integrated production-inventory-distribution-routing problem
    • Bard, J.F. and Nananukul, N., 2009b. The integrated production-inventory- distribution-routing problem. Journal of Scheduling, 12 (3), 257-280.
    • (2009) Journal of Scheduling , vol.12 , Issue.3 , pp. 257-280
    • Bard, J.F.1    Nananukul, N.2
  • 5
    • 34047126268 scopus 로고    scopus 로고
    • A reactive GRASP and path relinking for a combined production- distribution problem
    • Boudia, M., Louly, M.A.O., and Prins, C., 2007. A reactive GRASP and path relinking for a combined production-distribution problem. Computers and Operations Research, 34 (11), 3402-3419.
    • (2007) Computers and Operations Research , vol.34 , Issue.11 , pp. 3402-3419
    • Boudia, M.1    Louly, M.A.O.2    Prins, C.3
  • 6
    • 39749189321 scopus 로고    scopus 로고
    • Fast heuristics for a combined production planning and vehicle routing problem
    • Boudia, M., Louly, M.A.O., and Prins, C., 2008. Fast heuristics for a combined production planning and vehicle routing problem. Production Planning and Control, 19 (2), 85-96.
    • (2008) Production Planning and Control , vol.19 , Issue.2 , pp. 85-96
    • Boudia, M.1    Louly, M.A.O.2    Prins, C.3
  • 7
    • 56349117292 scopus 로고    scopus 로고
    • A memetic algorithm with dynamic population management for an integrated production-distribution problem
    • Boudia, M. and Prins, C., 2009. A memetic algorithm with dynamic population management for an integrated production-distribution problem. European Journal of Operational Research, 195 (3), 703-715.
    • (2009) European Journal of Operational Research , vol.195 , Issue.3 , pp. 703-715
    • Boudia, M.1    Prins, C.2
  • 9
    • 41549099629 scopus 로고    scopus 로고
    • An exact policy for enhancing buyer-supplier linkage in supply chain system
    • Chang, C.T., et al., 2008. An exact policy for enhancing buyer-supplier linkage in supply chain system. International Journal of Production Economics, 113 (1), 470-479.
    • (2008) International Journal of Production Economics , vol.113 , Issue.1 , pp. 470-479
    • Chang, C.T.1
  • 10
    • 77249147436 scopus 로고    scopus 로고
    • Integrated production and outbound distribution scheduling: Review and extensions
    • Chen, Z.L., 2010. Integrated production and outbound distribution scheduling: Review and extensions. Operations Research, 58 (1), 130-148.
    • (2010) Operations Research , vol.58 , Issue.1 , pp. 130-148
    • Chen, Z.L.1
  • 11
    • 0000879068 scopus 로고
    • Optimal policies for a multi-echelon inventory problem
    • Clark, A.J. and Scarf, H., 1960. Optimal policies for a multi-echelon inventory problem. Management Science, 6 (4), 475-490.
    • (1960) Management Science , vol.6 , Issue.4 , pp. 475-490
    • Clark, A.J.1    Scarf, H.2
  • 12
    • 0000419596 scopus 로고
    • Scheduling of vehicles from a central depot to a number of delivery points
    • Clarke, G. and Wright, J.W., 1964. Scheduling of vehicles from a central depot to a number of delivery points. Operations Research, 12 (4), 568-581.
    • (1964) Operations Research , vol.12 , Issue.4 , pp. 568-581
    • Clarke, G.1    Wright, J.W.2
  • 13
    • 33749988426 scopus 로고    scopus 로고
    • Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost
    • Ertogral, K., Darwish, M., and Ben-Daya, M., 2007. Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost. European Journal of Operational Research, 176 (3), 1592-1606.
    • (2007) European Journal of Operational Research , vol.176 , Issue.3 , pp. 1592-1606
    • Ertogral, K.1    Darwish, M.2    Ben-Daya, M.3
  • 14
    • 0033339421 scopus 로고    scopus 로고
    • Synchronized development of production, inventory, and distribution schedules
    • Fumero, F. and Vercellis, C., 1999. Synchronized development of production, inventory, and distribution schedules. Transportation Science, 33 (3), 330-340.
    • (1999) Transportation Science , vol.33 , Issue.3 , pp. 330-340
    • Fumero, F.1    Vercellis, C.2
  • 15
    • 84155165065 scopus 로고    scopus 로고
    • The joint economic lot size problem: A review
    • Glock, C.H., 2012. The joint economic lot size problem: a review. International Journal of Production Economics, 135 (2), 671-686.
    • (2012) International Journal of Production Economics , vol.135 , Issue.2 , pp. 671-686
    • Glock, C.H.1
  • 16
    • 0017416997 scopus 로고
    • An integrated inventory model for a single supplier-single customer problem
    • Goyal, S.K., 1976. An integrated inventory model for a single supplier-single customer problem. International Journal of Production Research, 15 (1), 107-111.
    • (1976) International Journal of Production Research , vol.15 , Issue.1 , pp. 107-111
    • Goyal, S.K.1
  • 17
    • 30844432190 scopus 로고    scopus 로고
    • Another look at the single-vendor single-buyer integrated production-inventory problem
    • Hill, R.M. and Omar, M., 2006. Another look at the single-vendor single-buyer integrated production-inventory problem. International Journal of Production Research, 44 (4), 791-800.
    • (2006) International Journal of Production Research , vol.44 , Issue.4 , pp. 791-800
    • Hill, R.M.1    Omar, M.2
  • 18
    • 0033747626 scopus 로고    scopus 로고
    • An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment
    • Hoque, M.A. and Goyal, S.K., 2000. An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment. International Journal of Production Economics, 65 (3), 305-315.
    • (2000) International Journal of Production Economics , vol.65 , Issue.3 , pp. 305-315
    • Hoque, M.A.1    Goyal, S.K.2
  • 19
    • 33646107382 scopus 로고    scopus 로고
    • A heuristic solution procedure for an integrated inventory system under controllable leadtime with equal or unequal sized batch shipments between a vendor and a buyer
    • Hoque, M.A. and Goyal, S.K., 2006. A heuristic solution procedure for an integrated inventory system under controllable leadtime with equal or unequal sized batch shipments between a vendor and a buyer. International Journal of Production Economics, 102 (2), 217-225.
    • (2006) International Journal of Production Economics , vol.102 , Issue.2 , pp. 217-225
    • Hoque, M.A.1    Goyal, S.K.2
  • 20
    • 38649120479 scopus 로고    scopus 로고
    • Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain
    • Hoque, M.A., 2008. Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain. European Journal of Operational Research, 188 (3), 811-825.
    • (2008) European Journal of Operational Research , vol.188 , Issue.3 , pp. 811-825
    • Hoque, M.A.1
  • 21
    • 79960900770 scopus 로고    scopus 로고
    • An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors
    • Hoque, M.A., 2011. An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors. European Journal of Operational Research, 215 (1), 80-88.
    • (2011) European Journal of Operational Research , vol.215 , Issue.1 , pp. 80-88
    • Hoque, M.A.1
  • 22
    • 49049099173 scopus 로고    scopus 로고
    • Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information
    • Hsiao, Y.C., 2008. Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information. International Journal of Production Economics, 115 (1), 229-235.
    • (2008) International Journal of Production Economics , vol.115 , Issue.1 , pp. 229-235
    • Hsiao, Y.C.1
  • 23
    • 74549172921 scopus 로고    scopus 로고
    • A single-vendor single-buyer production-inventory model with controllable lead time and service level constraint for decaying items
    • Jha, J.K. and Shanker, K., 2009a. A single-vendor single-buyer production-inventory model with controllable lead time and service level constraint for decaying items. International Journal of Production Research, 47 (24), 6875-6898.
    • (2009) International Journal of Production Research , vol.47 , Issue.24 , pp. 6875-6898
    • Jha, J.K.1    Shanker, K.2
  • 24
    • 69649098598 scopus 로고    scopus 로고
    • Two-echelon supply chain inventory model with controllable lead time and service level constraint
    • Jha, J.K. and Shanker, K., 2009b. Two-echelon supply chain inventory model with controllable lead time and service level constraint. Computers and Industrial Engineering, 57 (3), 1096-1104.
    • (2009) Computers and Industrial Engineering , vol.57 , Issue.3 , pp. 1096-1104
    • Jha, J.K.1    Shanker, K.2
  • 26
    • 33645888670 scopus 로고    scopus 로고
    • Computational algorithm for inventory model with a service level constraint, lead time demand with the mixture of distributions and controllable negative exponential backorder rate
    • Lee, W.C., Wu, J.W., and Hsu, J.W., 2006. Computational algorithm for inventory model with a service level constraint, lead time demand with the mixture of distributions and controllable negative exponential backorder rate. Applied Mathematics and Computation, 175 (2), 1125-1138.
    • (2006) Applied Mathematics and Computation , vol.175 , Issue.2 , pp. 1125-1138
    • Lee, W.C.1    Wu, J.W.2    Hsu, J.W.3
  • 27
    • 33748518397 scopus 로고    scopus 로고
    • On the integrated production, inventory, and distribution routing problem
    • Lei, L., et al., 2006. On the integrated production, inventory, and distribution routing problem. IIE Transactions, 38 (11), 955-970.
    • (2006) IIE Transactions , vol.38 , Issue.11 , pp. 955-970
    • Lei, L.1
  • 29
    • 79959246791 scopus 로고    scopus 로고
    • A note on a study of an integrated inventory with controllable lead time
    • Lin, L.H., Chen, L.C., and Hsiao, Y.C., 2011. A note on a study of an integrated inventory with controllable lead time. International Journal of Production Research, 49 (15), 4727-4733.
    • (2011) International Journal of Production Research , vol.49 , Issue.15 , pp. 4727-4733
    • Lin, L.H.1    Chen, L.C.2    Hsiao, Y.C.3
  • 30
    • 67349172139 scopus 로고    scopus 로고
    • An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost
    • Lin, Y.J., 2009. An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost. Computers and Industrial Engineering, 56 (4), 1597-1606.
    • (2009) Computers and Industrial Engineering , vol.56 , Issue.4 , pp. 1597-1606
    • Lin, Y.J.1
  • 31
    • 0007031914 scopus 로고
    • The distribution free continuous review inventory system with a service level constraint
    • Moon, I. and Choi, S., 1994. The distribution free continuous review inventory system with a service level constraint. Computers and Industrial Engineering, 27 (1-4), 209-212.
    • (1994) Computers and Industrial Engineering , vol.27 , Issue.1-4 , pp. 209-212
    • Moon, I.1    Choi, S.2
  • 32
    • 0034309379 scopus 로고    scopus 로고
    • A periodic review inventory model involving variable lead time with a service level constraint
    • Ouyang, L.Y. and Chuang, B.R., 2000. A periodic review inventory model involving variable lead time with a service level constraint. International Journal of Systems Science, 31 (10), 1209-1215.
    • (2000) International Journal of Systems Science , vol.31 , Issue.10 , pp. 1209-1215
    • Ouyang, L.Y.1    Chuang, B.R.2
  • 33
    • 0031232606 scopus 로고    scopus 로고
    • Mixture inventory model involving variable lead time with a service level constraint
    • Ouyang, L.Y. and Wu, K.S., 1997. Mixture inventory model involving variable lead time with a service level constraint. Computers and Operations Research, 24 (9), 875-882.
    • (1997) Computers and Operations Research , vol.24 , Issue.9 , pp. 875-882
    • Ouyang, L.Y.1    Wu, K.S.2
  • 34
    • 9544241347 scopus 로고    scopus 로고
    • Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time
    • Ouyang, L.Y., Wu, K.S., and Ho, C.H., 2004. Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time. International Journal of Production Economics, 92 (3), 255-266.
    • (2004) International Journal of Production Economics , vol.92 , Issue.3 , pp. 255-266
    • Ouyang, L.Y.1    Wu, K.S.2    Ho, C.H.3
  • 35
    • 34249930610 scopus 로고    scopus 로고
    • An integrated vendor-buyer inventory model with quality improvement and lead time reduction
    • Ouyang, L.Y., Wu, K.S., and Ho, C.H., 2007. An integrated vendor-buyer inventory model with quality improvement and lead time reduction. International Journal of Production Economics, 108 (1-2), 349-358.
    • (2007) International Journal of Production Economics , vol.108 , Issue.1-2 , pp. 349-358
    • Ouyang, L.Y.1    Wu, K.S.2    Ho, C.H.3
  • 36
    • 0037139670 scopus 로고    scopus 로고
    • A study of an integrated inventory with controllable lead time
    • Pan, J.C.H. and Yang, J.S., 2002. A study of an integrated inventory with controllable lead time. International Journal of Production Research, 40 (5), 1263-1273.
    • (2002) International Journal of Production Research , vol.40 , Issue.5 , pp. 1263-1273
    • Pan, J.C.H.1    Yang, J.S.2
  • 37
    • 27744470759 scopus 로고    scopus 로고
    • An integrated approach for production and distribution planning in supply chain management
    • Park, Y.B., 2005. An integrated approach for production and distribution planning in supply chain management. International Journal of Production Research, 43 (6), 1205-1224.
    • (2005) International Journal of Production Research , vol.43 , Issue.6 , pp. 1205-1224
    • Park, Y.B.1
  • 39
    • 37349007852 scopus 로고    scopus 로고
    • Coordination of a single-manufacturer/multi-buyer supply chain with credit option
    • Sarmah, S.P., Acharya, D., and Goyal, S.K., 2008. Coordination of a single-manufacturer/multi-buyer supply chain with credit option. International Journal of Production Economics, 111 (2), 676-685.
    • (2008) International Journal of Production Economics , vol.111 , Issue.2 , pp. 676-685
    • Sarmah, S.P.1    Acharya, D.2    Goyal, S.K.3
  • 40
    • 0033344267 scopus 로고    scopus 로고
    • A review of integrated analysis of production-distribution systems
    • Sarmiento, A.M. and Nagi, R., 1999. A review of integrated analysis of production-distribution systems. IIE Transactions, 31 (11), 1061-1074.
    • (1999) IIE Transactions , vol.31 , Issue.11 , pp. 1061-1074
    • Sarmiento, A.M.1    Nagi, R.2
  • 41
  • 42
    • 84871233087 scopus 로고    scopus 로고
    • [online] (1.3), [Accessed 17 December 2008]
    • Snyder, L.V., 2004. VRP Solver. Lehigh University. [online] (1.3) Available at: http://www.lehigh.edu/~lvs2/download/vrpsolver.html [Accessed 17 December 2008].
    • (2004) VRP Solver
    • Snyder, L.V.1
  • 45
    • 1342266030 scopus 로고    scopus 로고
    • Just-in-time purchasing: An integrated inventory model involving deterministic variable lead time and quality improvement investment
    • Yang, J.S. and Pan, J.C.H., 2004. Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment. International Journal of Production Research, 42 (5), 853-863.
    • (2004) International Journal of Production Research , vol.42 , Issue.5 , pp. 853-863
    • Yang, J.S.1    Pan, J.C.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.