-
3
-
-
0004108768
-
-
MRT Productions, Zaltbommel, the Netherlands
-
Esveld C (2001). Modern Railway Track. MRT Productions, Zaltbommel, the Netherlands.
-
(2001)
Modern Railway Track
-
-
Esveld, C.1
-
5
-
-
0015990707
-
The effect of track and vehicle parameters on wheel/rail vertical dynamic forces
-
Jenkins HH, Stephenson JE, Clayton GA, Morland GW and Lyon D (1974). The effect of track and vehicle parameters on wheel/rail vertical dynamic forces. Railway Engineering Journal 3(1): 2-16.
-
(1974)
Railway Engineering Journal
, vol.3
, Issue.1
, pp. 2-16
-
-
Jenkins, H.H.1
Stephenson, J.E.2
Clayton, G.A.3
Morland, G.W.4
Lyon, D.5
-
7
-
-
1642587299
-
Dynamic response analyses of vehicle and track coupled system on track transition of conventional high speed railway
-
Lei X and Mao L (2003). Dynamic response analyses of vehicle and track coupled system on track transition of conventional high speed railway. Journal of Sound and Vibration 271(3): 1133-1146.
-
(2003)
Journal of Sound and Vibration
, vol.271
, Issue.3
, pp. 1133-1146
-
-
Lei, X.1
Mao, L.2
-
8
-
-
1642615273
-
Analyses of dynamic response of vehicle and track coupling system with random irregularity of track vertical profile
-
Lei X and Noda NA (2002). Analyses of dynamic response of vehicle and track coupling system with random irregularity of track vertical profile. Journal of Sound and Vibration 258(1): 147-165.
-
(2002)
Journal of Sound and Vibration
, vol.258
, Issue.1
, pp. 147-165
-
-
Lei, X.1
Noda, N.A.2
-
13
-
-
34547380364
-
Track stiffness management using the Xitrack geocomposite
-
Thompson DR and Woodward PK (2004). Track stiffness management using the Xitrack geocomposite. Permanent Way Institution Journal 122(3): 135-138.
-
(2004)
Permanent Way Institution Journal
, vol.122
, Issue.3
, pp. 135-138
-
-
Thompson, D.R.1
Woodward, P.K.2
-
14
-
-
84860261068
-
Cost effective solution of persistent track faults using XITRACK geocomposite technology
-
Woodward PK, Nicholl G and Thompson DR (2005a). Cost effective solution of persistent track faults using XITRACK geocomposite technology. Permanent Way Institution Journal 123(Part 4): 191-195.
-
(2005)
Permanent Way Institution Journal
, vol.123
, Issue.PART 4
, pp. 191-195
-
-
Woodward, P.K.1
Nicholl, G.2
Thompson, D.R.3
-
15
-
-
84891585534
-
Advanced nonlinear dynamic finite element modelling of railway track behaviour
-
(CD-ROM)
-
Woodward PK, Zettor B, Kaddouri A and Banimahd M (2005b). Advanced nonlinear dynamic finite element modelling of railway track behaviour. Proceedings of 8th International Conference on Railway Engineering, London, UK (CD-ROM).
-
(2005)
Proceedings of 8th International Conference on Railway Engineering, London, UK
-
-
Woodward, P.K.1
Zettor, B.2
Kaddouri, A.3
Banimahd, M.4
-
17
-
-
84871093339
-
XiTRACK reinforcement of Keadby canal drawbridge
-
(CD-ROM)
-
Woodward PK, Boyd P, Spiers J and Banimahd M (2007b). XiTRACK reinforcement of Keadby canal drawbridge. Proceedings of 9th International Conference on Railway Engineering, London, UK (CD-ROM).
-
(2007)
Proceedings of 9th International Conference on Railway Engineering, London, UK
-
-
Woodward, P.K.1
Boyd, P.2
Spiers, J.3
Banimahd, M.4
-
18
-
-
0030378542
-
Two simple integration methods for largescale dynamic problems in engineering
-
Zhai WM (1996). Two simple integration methods for largescale dynamic problems in engineering. International Journal for Numerical Methods in Engineering 39(24): 4199-4214.
-
(1996)
International Journal for Numerical Methods in Engineering
, vol.39
, Issue.24
, pp. 4199-4214
-
-
Zhai, W.M.1
|