Volumn 53, Issue , 2013, Pages 60-70

Life cycle assessment of an onshore wind farm located at the northeastern coast of Brazil

Author keywords

Brazil; Life cycle assessment; Renewable energy; Sustainability; Wind energy

Indexed keywords

BRAZIL; GREEN ELECTRICITY; LIFE CYCLE ASSESSMENT (LCA); LIFE CYCLE EMISSIONS; LOW EMISSION; MANUFACTURING INDUSTRIES; MANUFACTURING PROCESS; MW WIND TURBINE; ONSHORE WINDS; OPERATION PHASIS; PRODUCTION SITES; PRODUCTION STAGE; RENEWABLE ENERGIES; RENEWABLE ENERGY SOURCE; STEEL TOWERS; WIND FARM; WIND POWER PROJECTS;

EID: 84870684075     PISSN: 09601481     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.renene.2012.10.026     Document Type: Article
Times cited : (89)

References (23)
  • 1
    • 84870670376 scopus 로고    scopus 로고
    • Empresa de Pesquisa Energética, Rio De Janeiro
    • EPE Brazilian energy balance 2011 2011, Empresa de Pesquisa Energética, Rio De Janeiro.
    • (2011) EPE Brazilian energy balance 2011
  • 2
    • 0037099635 scopus 로고    scopus 로고
    • Greenhouse gas emissions from building and operating electric power plants in the Upper Colorado River Basin
    • Pacca S., Horvath A. Greenhouse gas emissions from building and operating electric power plants in the Upper Colorado River Basin. Environmental Science and Technology 2002, 36:3194-3200.
    • (2002) Environmental Science and Technology , vol.36 , pp. 3194-3200
    • Pacca, S.1    Horvath, A.2
  • 4
    • 84870695907 scopus 로고    scopus 로고
    • Life cycle assessment of electricity production from a Vestas V112 turbine wind plant. Copenhagen, Denmark.
    • D'Souza N, Gbegbaje-Das E, Shonfield P. Life cycle assessment of electricity production from a Vestas V112 turbine wind plant. Copenhagen, Denmark; 2011.
    • (2011)
    • D'Souza, N.1    Gbegbaje-Das, E.2    Shonfield, P.3
  • 5
    • 79961128080 scopus 로고    scopus 로고
    • Life cycle assessment of two different 2 MW class wind turbines
    • Guezuraga B., Zauner R., Pölz W. Life cycle assessment of two different 2 MW class wind turbines. Renewable Energy 2012, 37:37-44.
    • (2012) Renewable Energy , vol.37 , pp. 37-44
    • Guezuraga, B.1    Zauner, R.2    Pölz, W.3
  • 11
    • 0036629138 scopus 로고    scopus 로고
    • 2 life-cycle analyses of wind turbines-review and applications
    • 2 life-cycle analyses of wind turbines-review and applications. Renewable Energy 2002, 26:339-362.
    • (2002) Renewable Energy , vol.26 , pp. 339-362
    • Lenzen, M.1
  • 12
    • 0142215262 scopus 로고    scopus 로고
    • Wind turbines in Brazil and Germany: an example of geographical variability in life-cycle assessment
    • Lenzen M., Wachsmann U. Wind turbines in Brazil and Germany: an example of geographical variability in life-cycle assessment. Applied Energy 2004, 77:119-130.
    • (2004) Applied Energy , vol.77 , pp. 119-130
    • Lenzen, M.1    Wachsmann, U.2
  • 15
    • 79960136677 scopus 로고    scopus 로고
    • WWEA, World Wind Energy Association, Bonn, Germany
    • World Wind Energy Report 2010 2011, WWEA, World Wind Energy Association, Bonn, Germany.
    • (2011) World Wind Energy Report 2010
  • 16
    • 84870702323 scopus 로고    scopus 로고
    • ANEEL. Usinas do tipo eólica em operação. Matriz Energética Do Brasil.
    • ANEEL. Usinas do tipo eólica em operação. Matriz Energética Do Brasil; 2011.
    • (2011)
  • 17
    • 4143140416 scopus 로고    scopus 로고
    • Cepel, Centro de Pesquisas em Energia Elétrica (CEPEL), Brasilia
    • Atlas do potencial eólico brasileiro 2001, Cepel, Centro de Pesquisas em Energia Elétrica (CEPEL), Brasilia.
    • (2001) Atlas do potencial eólico brasileiro
  • 18
    • 84870667460 scopus 로고    scopus 로고
    • Primeiro leilão de energia eólica do país viabiliza a construção de 1.805,7 MW
    • EPE
    • Primeiro leilão de energia eólica do país viabiliza a construção de 1.805,7 MW. Informe à Imprensa 2009, EPE.
    • (2009) Informe à Imprensa
  • 19
    • 81055132637 scopus 로고    scopus 로고
    • EPE, Empresa de Pesquisa Energética, Rio De Janeiro
    • Brazilian energy balance 2010, EPE, Empresa de Pesquisa Energética, Rio De Janeiro.
    • (2010) Brazilian energy balance
  • 20
    • 84870659883 scopus 로고    scopus 로고
    • Leilões de Fontes Alternativas contratam 89 usinas, com 2.892,2 MW
    • EPE
    • Leilões de Fontes Alternativas contratam 89 usinas, com 2.892,2 MW. Informe à Imprensa 2010, EPE.
    • (2010) Informe à Imprensa
  • 21
    • 84870718460 scopus 로고    scopus 로고
    • Contratação no Leilão de Reserva totaliza 1.218,1 MW, através de 41 usinas
    • EPE
    • Contratação no Leilão de Reserva totaliza 1.218,1 MW, através de 41 usinas. Informe à Imprensa 2011, EPE.
    • (2011) Informe à Imprensa
  • 22
    • 4143140416 scopus 로고    scopus 로고
    • Camargo Schubert Engenharia Eólica, Secretaria da Infrastrutura - Governo do Estado do Ceará, Fortaleza
    • Atlas do Potencial Eólico do Ceará 2001, Camargo Schubert Engenharia Eólica, Secretaria da Infrastrutura - Governo do Estado do Ceará, Fortaleza.
    • (2001) Atlas do Potencial Eólico do Ceará


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.