-
1
-
-
0031232606
-
Mixture inventory model involving variable lead time with a service level constraint
-
Ouyang L.Y., Wu K.S. Mixture inventory model involving variable lead time with a service level constraint. Comput. Oper. Res. 1997, 24:875-882.
-
(1997)
Comput. Oper. Res.
, vol.24
, pp. 875-882
-
-
Ouyang, L.Y.1
Wu, K.S.2
-
2
-
-
0017416997
-
An integrated inventory model for a single supplier-single customer problem
-
Goyal S.K. An integrated inventory model for a single supplier-single customer problem. Int. J. Prod. Res. 1976, 15:107-111.
-
(1976)
Int. J. Prod. Res.
, vol.15
, pp. 107-111
-
-
Goyal, S.K.1
-
3
-
-
84985846646
-
A joint economic-lot-size model for purchaser and vendor
-
Banerjee A. A joint economic-lot-size model for purchaser and vendor. Decision Sci. 1986, 17:292-311.
-
(1986)
Decision Sci.
, vol.17
, pp. 292-311
-
-
Banerjee, A.1
-
4
-
-
84985781712
-
A joint economic-lot-size model for purchaser and vendor: a comment
-
Goyal S.K. A joint economic-lot-size model for purchaser and vendor: a comment. Decision Sci. 1988, 19:236-241.
-
(1988)
Decision Sci.
, vol.19
, pp. 236-241
-
-
Goyal, S.K.1
-
5
-
-
0029632685
-
A one-vendor multi-buyer integrated inventory model
-
Lu L. A one-vendor multi-buyer integrated inventory model. Eur. J. Oper. Res. 1995, 81:312-323.
-
(1995)
Eur. J. Oper. Res.
, vol.81
, pp. 312-323
-
-
Lu, L.1
-
6
-
-
0001539415
-
A one vendor multi-buyer integrated inventory model: a comment
-
Goyal S.K. A one vendor multi-buyer integrated inventory model: a comment. Eur. J. Oper. Res. 1995, 82:209-210.
-
(1995)
Eur. J. Oper. Res.
, vol.82
, pp. 209-210
-
-
Goyal, S.K.1
-
7
-
-
0031101243
-
The single-vendor single-buyer integrated production-inventory model with a generalized policy
-
Hill R.M. The single-vendor single-buyer integrated production-inventory model with a generalized policy. Eur. J. Oper. Res. 1997, 97:493-499.
-
(1997)
Eur. J. Oper. Res.
, vol.97
, pp. 493-499
-
-
Hill, R.M.1
-
8
-
-
0032632360
-
The optimal production and shipment policy for the single-vendor, single buyer integrated production-inventory problem
-
Hill R.M. The optimal production and shipment policy for the single-vendor, single buyer integrated production-inventory problem. Int. J. Prod. Res. 1999, 37:2463-2475.
-
(1999)
Int. J. Prod. Res.
, vol.37
, pp. 2463-2475
-
-
Hill, R.M.1
-
9
-
-
0343081532
-
Determination of economic production-shipment policy for a single-vendor-single-buyer system
-
Goyal S.K., Nebebe F. Determination of economic production-shipment policy for a single-vendor-single-buyer system. Eur. J. Oper. Res. 2000, 121:175-178.
-
(2000)
Eur. J. Oper. Res.
, vol.121
, pp. 175-178
-
-
Goyal, S.K.1
Nebebe, F.2
-
10
-
-
0028444423
-
Coordinated vs. independent inventory replenishment policies for a vendor and multiple buyers
-
Banerjee A., Burton J.S. Coordinated vs. independent inventory replenishment policies for a vendor and multiple buyers. Int. J. Prod. Econ. 1994, 35:215-222.
-
(1994)
Int. J. Prod. Econ.
, vol.35
, pp. 215-222
-
-
Banerjee, A.1
Burton, J.S.2
-
11
-
-
0028443964
-
A coordinated order-up-to inventory control policy for a single supplier and multiple buyers using electronic data interchange
-
Banerjee A., Banerjee S. A coordinated order-up-to inventory control policy for a single supplier and multiple buyers using electronic data interchange. Int. J. Prod. Econ. 1994, 35:85-91.
-
(1994)
Int. J. Prod. Econ.
, vol.35
, pp. 85-91
-
-
Banerjee, A.1
Banerjee, S.2
-
12
-
-
37349007852
-
Coordination of a single-manufacturer/multi-buyer supply chain with credit option
-
Sarmah S.P., Acharya D., Goyal S.K. Coordination of a single-manufacturer/multi-buyer supply chain with credit option. Int. J. Prod. Econ. 2008, 111:676-685.
-
(2008)
Int. J. Prod. Econ.
, vol.111
, pp. 676-685
-
-
Sarmah, S.P.1
Acharya, D.2
Goyal, S.K.3
-
13
-
-
38649120479
-
Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain
-
Hoque M.A. Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain. Eur. J. Oper. Res. 2008, 3:811-825.
-
(2008)
Eur. J. Oper. Res.
, vol.3
, pp. 811-825
-
-
Hoque, M.A.1
-
14
-
-
79954414612
-
Generalized single-vendor multi-buyer integrated inventory supply chain models with a better synchronization
-
Hoque M.A. Generalized single-vendor multi-buyer integrated inventory supply chain models with a better synchronization. Int. J. Prod. Econ. 2011, 131:463-472.
-
(2011)
Int. J. Prod. Econ.
, vol.131
, pp. 463-472
-
-
Hoque, M.A.1
-
15
-
-
79960900770
-
An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors
-
Hoque M.A. An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors. Eur. J. Oper. Res. 2011, 215:80-88.
-
(2011)
Eur. J. Oper. Res.
, vol.215
, pp. 80-88
-
-
Hoque, M.A.1
-
17
-
-
0002505095
-
An analytical determination of lead time with normal demand
-
Liao C.J., Shyu C.H. An analytical determination of lead time with normal demand. Int. J. Oper. Prod. Manage. 1991, 11:72-78.
-
(1991)
Int. J. Oper. Prod. Manage.
, vol.11
, pp. 72-78
-
-
Liao, C.J.1
Shyu, C.H.2
-
18
-
-
0037139670
-
A study of an integrated inventory with controllable lead time
-
Pan J.C.H., Yang J.S. A study of an integrated inventory with controllable lead time. Int. J. Prod. Res. 2002, 40:1263-1273.
-
(2002)
Int. J. Prod. Res.
, vol.40
, pp. 1263-1273
-
-
Pan, J.C.H.1
Yang, J.S.2
-
19
-
-
1342266030
-
Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment
-
Yang J.S., Pan J.C.H. Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment. Int. J. Prod. Res. 2004, 42:853-863.
-
(2004)
Int. J. Prod. Res.
, vol.42
, pp. 853-863
-
-
Yang, J.S.1
Pan, J.C.H.2
-
20
-
-
9544241347
-
Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time
-
Ouyang L.Y., Wu K.S., Ho C.H. Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time. Int. J. Prod. Econ. 2004, 92:255-266.
-
(2004)
Int. J. Prod. Econ.
, vol.92
, pp. 255-266
-
-
Ouyang, L.Y.1
Wu, K.S.2
Ho, C.H.3
-
21
-
-
33749014161
-
The single-vendor single-buyer integrated inventory problem with quality improvement and lead time reduction-minimax distribution-free approach
-
Ouyang L.Y., Wu K.S., Ho C.H. The single-vendor single-buyer integrated inventory problem with quality improvement and lead time reduction-minimax distribution-free approach. Asia-Pacific J. Oper. Res. 2006, 23:407-424.
-
(2006)
Asia-Pacific J. Oper. Res.
, vol.23
, pp. 407-424
-
-
Ouyang, L.Y.1
Wu, K.S.2
Ho, C.H.3
-
22
-
-
34249930610
-
An integrated vendor-buyer inventory model with quality improvement and lead time reduction
-
Ouyang L.Y., Wu K.S., Ho C.H. An integrated vendor-buyer inventory model with quality improvement and lead time reduction. Int. J. Prod. Econ. 2007, 108:349-358.
-
(2007)
Int. J. Prod. Econ.
, vol.108
, pp. 349-358
-
-
Ouyang, L.Y.1
Wu, K.S.2
Ho, C.H.3
-
23
-
-
74549172921
-
A single-vendor single-buyer production-inventory model with controllable lead time and service level constraint for decaying items
-
Jha J.K., Shanker K. A single-vendor single-buyer production-inventory model with controllable lead time and service level constraint for decaying items. Int. J. Prod. Res. 2009, 47:6875-6898.
-
(2009)
Int. J. Prod. Res.
, vol.47
, pp. 6875-6898
-
-
Jha, J.K.1
Shanker, K.2
-
24
-
-
69649098598
-
Two-echelon supply chain inventory model with controllable lead time and service level constraint
-
Jha J.K., Shanker K. Two-echelon supply chain inventory model with controllable lead time and service level constraint. Comput. Ind. Eng. 2009, 57:1096-1104.
-
(2009)
Comput. Ind. Eng.
, vol.57
, pp. 1096-1104
-
-
Jha, J.K.1
Shanker, K.2
-
25
-
-
64149087706
-
Replenishment and lead time decisions in manufacturer-retailer chains
-
Hsu S.L., Lee C.C. Replenishment and lead time decisions in manufacturer-retailer chains. Transport. Res. Part E: Logistics Transp. Rev. 2009, 45:398-408.
-
(2009)
Transport. Res. Part E: Logistics Transp. Rev.
, vol.45
, pp. 398-408
-
-
Hsu, S.L.1
Lee, C.C.2
-
26
-
-
0035480433
-
Inventory models with minimal service level constraints
-
Chen F.Y., Krass D. Inventory models with minimal service level constraints. Eur. J. Oper. Res. 2001, 134:120-140.
-
(2001)
Eur. J. Oper. Res.
, vol.134
, pp. 120-140
-
-
Chen, F.Y.1
Krass, D.2
-
28
-
-
0007031914
-
The distribution free continuous review inventory system with a service level constraint
-
Moon, Choi S. The distribution free continuous review inventory system with a service level constraint. Comput. Ind. Eng. 1994, 27:209-212.
-
(1994)
Comput. Ind. Eng.
, vol.27
, pp. 209-212
-
-
Moon, C.S.1
-
29
-
-
0034309379
-
A periodic review inventory model involving variable lead time with a service level constraint
-
Ouyang L.Y., Chuang B.R. A periodic review inventory model involving variable lead time with a service level constraint. Int. J. Syst. Sci. 2000, 31:1209-1215.
-
(2000)
Int. J. Syst. Sci.
, vol.31
, pp. 1209-1215
-
-
Ouyang, L.Y.1
Chuang, B.R.2
-
30
-
-
33645888670
-
Computational algorithm for inventory model with a service level constraint, lead time demand with the mixture of distributions and controllable negative exponential backorder rate
-
Lee W.C., Wu J.W., Hsu J.W. Computational algorithm for inventory model with a service level constraint, lead time demand with the mixture of distributions and controllable negative exponential backorder rate. Appl. Math. Comput. 2006, 175:1125-1138.
-
(2006)
Appl. Math. Comput.
, vol.175
, pp. 1125-1138
-
-
Lee, W.C.1
Wu, J.W.2
Hsu, J.W.3
-
31
-
-
80053219023
-
Supply chain coordination model with controllable lead time and service level constraint
-
Li Y., Xu X., Ye F. Supply chain coordination model with controllable lead time and service level constraint. Comput. Ind. Eng. 2011, 61:858-864.
-
(2011)
Comput. Ind. Eng.
, vol.61
, pp. 858-864
-
-
Li, Y.1
Xu, X.2
Ye, F.3
|