메뉴 건너뛰기




Volumn 37, Issue 4, 2013, Pages 1753-1767

Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints

Author keywords

Integrated production inventory model; Lead time crashing; Multi buyer; Service level constraint

Indexed keywords

ALGORITHMIC APPROACH; BATCH PRODUCTION; CONTINUOUS REVIEW; CONTROLLABLE LEAD-TIME; COST COMPONENTS; CRASH COSTS; EXPECTED COSTS; INTEGRATED PRODUCTION-INVENTORY MODEL; INVENTORY SYSTEMS; KEY PARAMETERS; LAGRANGIAN MULTIPLIERS; LEADTIME; MULTI-BUYER; NUMERICAL EXAMPLE; OBJECTIVE FUNCTIONS; ORDER QUANTITY; PRODUCTION CYCLE; SERVICE LEVEL CONSTRAINT; STOCK-OUT; UNSATISFIED DEMAND;

EID: 84870247052     PISSN: 0307904X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.apm.2012.04.042     Document Type: Article
Times cited : (103)

References (32)
  • 1
    • 0031232606 scopus 로고    scopus 로고
    • Mixture inventory model involving variable lead time with a service level constraint
    • Ouyang L.Y., Wu K.S. Mixture inventory model involving variable lead time with a service level constraint. Comput. Oper. Res. 1997, 24:875-882.
    • (1997) Comput. Oper. Res. , vol.24 , pp. 875-882
    • Ouyang, L.Y.1    Wu, K.S.2
  • 2
    • 0017416997 scopus 로고
    • An integrated inventory model for a single supplier-single customer problem
    • Goyal S.K. An integrated inventory model for a single supplier-single customer problem. Int. J. Prod. Res. 1976, 15:107-111.
    • (1976) Int. J. Prod. Res. , vol.15 , pp. 107-111
    • Goyal, S.K.1
  • 3
    • 84985846646 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor
    • Banerjee A. A joint economic-lot-size model for purchaser and vendor. Decision Sci. 1986, 17:292-311.
    • (1986) Decision Sci. , vol.17 , pp. 292-311
    • Banerjee, A.1
  • 4
    • 84985781712 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor: a comment
    • Goyal S.K. A joint economic-lot-size model for purchaser and vendor: a comment. Decision Sci. 1988, 19:236-241.
    • (1988) Decision Sci. , vol.19 , pp. 236-241
    • Goyal, S.K.1
  • 5
    • 0029632685 scopus 로고
    • A one-vendor multi-buyer integrated inventory model
    • Lu L. A one-vendor multi-buyer integrated inventory model. Eur. J. Oper. Res. 1995, 81:312-323.
    • (1995) Eur. J. Oper. Res. , vol.81 , pp. 312-323
    • Lu, L.1
  • 6
    • 0001539415 scopus 로고
    • A one vendor multi-buyer integrated inventory model: a comment
    • Goyal S.K. A one vendor multi-buyer integrated inventory model: a comment. Eur. J. Oper. Res. 1995, 82:209-210.
    • (1995) Eur. J. Oper. Res. , vol.82 , pp. 209-210
    • Goyal, S.K.1
  • 7
    • 0031101243 scopus 로고    scopus 로고
    • The single-vendor single-buyer integrated production-inventory model with a generalized policy
    • Hill R.M. The single-vendor single-buyer integrated production-inventory model with a generalized policy. Eur. J. Oper. Res. 1997, 97:493-499.
    • (1997) Eur. J. Oper. Res. , vol.97 , pp. 493-499
    • Hill, R.M.1
  • 8
    • 0032632360 scopus 로고    scopus 로고
    • The optimal production and shipment policy for the single-vendor, single buyer integrated production-inventory problem
    • Hill R.M. The optimal production and shipment policy for the single-vendor, single buyer integrated production-inventory problem. Int. J. Prod. Res. 1999, 37:2463-2475.
    • (1999) Int. J. Prod. Res. , vol.37 , pp. 2463-2475
    • Hill, R.M.1
  • 9
    • 0343081532 scopus 로고    scopus 로고
    • Determination of economic production-shipment policy for a single-vendor-single-buyer system
    • Goyal S.K., Nebebe F. Determination of economic production-shipment policy for a single-vendor-single-buyer system. Eur. J. Oper. Res. 2000, 121:175-178.
    • (2000) Eur. J. Oper. Res. , vol.121 , pp. 175-178
    • Goyal, S.K.1    Nebebe, F.2
  • 10
    • 0028444423 scopus 로고
    • Coordinated vs. independent inventory replenishment policies for a vendor and multiple buyers
    • Banerjee A., Burton J.S. Coordinated vs. independent inventory replenishment policies for a vendor and multiple buyers. Int. J. Prod. Econ. 1994, 35:215-222.
    • (1994) Int. J. Prod. Econ. , vol.35 , pp. 215-222
    • Banerjee, A.1    Burton, J.S.2
  • 11
    • 0028443964 scopus 로고
    • A coordinated order-up-to inventory control policy for a single supplier and multiple buyers using electronic data interchange
    • Banerjee A., Banerjee S. A coordinated order-up-to inventory control policy for a single supplier and multiple buyers using electronic data interchange. Int. J. Prod. Econ. 1994, 35:85-91.
    • (1994) Int. J. Prod. Econ. , vol.35 , pp. 85-91
    • Banerjee, A.1    Banerjee, S.2
  • 12
    • 37349007852 scopus 로고    scopus 로고
    • Coordination of a single-manufacturer/multi-buyer supply chain with credit option
    • Sarmah S.P., Acharya D., Goyal S.K. Coordination of a single-manufacturer/multi-buyer supply chain with credit option. Int. J. Prod. Econ. 2008, 111:676-685.
    • (2008) Int. J. Prod. Econ. , vol.111 , pp. 676-685
    • Sarmah, S.P.1    Acharya, D.2    Goyal, S.K.3
  • 13
    • 38649120479 scopus 로고    scopus 로고
    • Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain
    • Hoque M.A. Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain. Eur. J. Oper. Res. 2008, 3:811-825.
    • (2008) Eur. J. Oper. Res. , vol.3 , pp. 811-825
    • Hoque, M.A.1
  • 14
    • 79954414612 scopus 로고    scopus 로고
    • Generalized single-vendor multi-buyer integrated inventory supply chain models with a better synchronization
    • Hoque M.A. Generalized single-vendor multi-buyer integrated inventory supply chain models with a better synchronization. Int. J. Prod. Econ. 2011, 131:463-472.
    • (2011) Int. J. Prod. Econ. , vol.131 , pp. 463-472
    • Hoque, M.A.1
  • 15
    • 79960900770 scopus 로고    scopus 로고
    • An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors
    • Hoque M.A. An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors. Eur. J. Oper. Res. 2011, 215:80-88.
    • (2011) Eur. J. Oper. Res. , vol.215 , pp. 80-88
    • Hoque, M.A.1
  • 17
    • 0002505095 scopus 로고
    • An analytical determination of lead time with normal demand
    • Liao C.J., Shyu C.H. An analytical determination of lead time with normal demand. Int. J. Oper. Prod. Manage. 1991, 11:72-78.
    • (1991) Int. J. Oper. Prod. Manage. , vol.11 , pp. 72-78
    • Liao, C.J.1    Shyu, C.H.2
  • 18
    • 0037139670 scopus 로고    scopus 로고
    • A study of an integrated inventory with controllable lead time
    • Pan J.C.H., Yang J.S. A study of an integrated inventory with controllable lead time. Int. J. Prod. Res. 2002, 40:1263-1273.
    • (2002) Int. J. Prod. Res. , vol.40 , pp. 1263-1273
    • Pan, J.C.H.1    Yang, J.S.2
  • 19
    • 1342266030 scopus 로고    scopus 로고
    • Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment
    • Yang J.S., Pan J.C.H. Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment. Int. J. Prod. Res. 2004, 42:853-863.
    • (2004) Int. J. Prod. Res. , vol.42 , pp. 853-863
    • Yang, J.S.1    Pan, J.C.H.2
  • 20
    • 9544241347 scopus 로고    scopus 로고
    • Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time
    • Ouyang L.Y., Wu K.S., Ho C.H. Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time. Int. J. Prod. Econ. 2004, 92:255-266.
    • (2004) Int. J. Prod. Econ. , vol.92 , pp. 255-266
    • Ouyang, L.Y.1    Wu, K.S.2    Ho, C.H.3
  • 21
    • 33749014161 scopus 로고    scopus 로고
    • The single-vendor single-buyer integrated inventory problem with quality improvement and lead time reduction-minimax distribution-free approach
    • Ouyang L.Y., Wu K.S., Ho C.H. The single-vendor single-buyer integrated inventory problem with quality improvement and lead time reduction-minimax distribution-free approach. Asia-Pacific J. Oper. Res. 2006, 23:407-424.
    • (2006) Asia-Pacific J. Oper. Res. , vol.23 , pp. 407-424
    • Ouyang, L.Y.1    Wu, K.S.2    Ho, C.H.3
  • 22
    • 34249930610 scopus 로고    scopus 로고
    • An integrated vendor-buyer inventory model with quality improvement and lead time reduction
    • Ouyang L.Y., Wu K.S., Ho C.H. An integrated vendor-buyer inventory model with quality improvement and lead time reduction. Int. J. Prod. Econ. 2007, 108:349-358.
    • (2007) Int. J. Prod. Econ. , vol.108 , pp. 349-358
    • Ouyang, L.Y.1    Wu, K.S.2    Ho, C.H.3
  • 23
    • 74549172921 scopus 로고    scopus 로고
    • A single-vendor single-buyer production-inventory model with controllable lead time and service level constraint for decaying items
    • Jha J.K., Shanker K. A single-vendor single-buyer production-inventory model with controllable lead time and service level constraint for decaying items. Int. J. Prod. Res. 2009, 47:6875-6898.
    • (2009) Int. J. Prod. Res. , vol.47 , pp. 6875-6898
    • Jha, J.K.1    Shanker, K.2
  • 24
    • 69649098598 scopus 로고    scopus 로고
    • Two-echelon supply chain inventory model with controllable lead time and service level constraint
    • Jha J.K., Shanker K. Two-echelon supply chain inventory model with controllable lead time and service level constraint. Comput. Ind. Eng. 2009, 57:1096-1104.
    • (2009) Comput. Ind. Eng. , vol.57 , pp. 1096-1104
    • Jha, J.K.1    Shanker, K.2
  • 25
    • 64149087706 scopus 로고    scopus 로고
    • Replenishment and lead time decisions in manufacturer-retailer chains
    • Hsu S.L., Lee C.C. Replenishment and lead time decisions in manufacturer-retailer chains. Transport. Res. Part E: Logistics Transp. Rev. 2009, 45:398-408.
    • (2009) Transport. Res. Part E: Logistics Transp. Rev. , vol.45 , pp. 398-408
    • Hsu, S.L.1    Lee, C.C.2
  • 26
    • 0035480433 scopus 로고    scopus 로고
    • Inventory models with minimal service level constraints
    • Chen F.Y., Krass D. Inventory models with minimal service level constraints. Eur. J. Oper. Res. 2001, 134:120-140.
    • (2001) Eur. J. Oper. Res. , vol.134 , pp. 120-140
    • Chen, F.Y.1    Krass, D.2
  • 28
    • 0007031914 scopus 로고
    • The distribution free continuous review inventory system with a service level constraint
    • Moon, Choi S. The distribution free continuous review inventory system with a service level constraint. Comput. Ind. Eng. 1994, 27:209-212.
    • (1994) Comput. Ind. Eng. , vol.27 , pp. 209-212
    • Moon, C.S.1
  • 29
    • 0034309379 scopus 로고    scopus 로고
    • A periodic review inventory model involving variable lead time with a service level constraint
    • Ouyang L.Y., Chuang B.R. A periodic review inventory model involving variable lead time with a service level constraint. Int. J. Syst. Sci. 2000, 31:1209-1215.
    • (2000) Int. J. Syst. Sci. , vol.31 , pp. 1209-1215
    • Ouyang, L.Y.1    Chuang, B.R.2
  • 30
    • 33645888670 scopus 로고    scopus 로고
    • Computational algorithm for inventory model with a service level constraint, lead time demand with the mixture of distributions and controllable negative exponential backorder rate
    • Lee W.C., Wu J.W., Hsu J.W. Computational algorithm for inventory model with a service level constraint, lead time demand with the mixture of distributions and controllable negative exponential backorder rate. Appl. Math. Comput. 2006, 175:1125-1138.
    • (2006) Appl. Math. Comput. , vol.175 , pp. 1125-1138
    • Lee, W.C.1    Wu, J.W.2    Hsu, J.W.3
  • 31
    • 80053219023 scopus 로고    scopus 로고
    • Supply chain coordination model with controllable lead time and service level constraint
    • Li Y., Xu X., Ye F. Supply chain coordination model with controllable lead time and service level constraint. Comput. Ind. Eng. 2011, 61:858-864.
    • (2011) Comput. Ind. Eng. , vol.61 , pp. 858-864
    • Li, Y.1    Xu, X.2    Ye, F.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.