메뉴 건너뛰기




Volumn 23, Issue 3, 2006, Pages 407-424

The single-vendor single-buyer integrated inventory problem with quality improvement and lead time reduction - Minimax distribution-free approach

Author keywords

Integrated inventory model; Lead time reduction; Minimax distribution free procedure; Partial backorders; Quality improvement

Indexed keywords

NUMERICAL ANALYSIS; PROBABILITY DISTRIBUTIONS; PROBLEM SOLVING; WASTE DISPOSAL;

EID: 33749014161     PISSN: 02175959     EISSN: None     Source Type: Journal    
DOI: 10.1142/S021759590600098X     Document Type: Article
Times cited : (20)

References (34)
  • 1
    • 84985846646 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor
    • Banerjee, A (1986). A joint economic-lot-size model for purchaser and vendor. Decision Sciences, 17, 292-311.
    • (1986) Decision Sciences , vol.17 , pp. 292-311
    • Banerjee, A.1
  • 2
    • 0028439401 scopus 로고
    • Inventory models involving lead time as a decision variable
    • Ben-Daya, M and A Raouf (1994). Inventory models involving lead time as a decision variable. Journal of the Operational Research Society, 45(5), 579-582.
    • (1994) Journal of the Operational Research Society , vol.45 , Issue.5 , pp. 579-582
    • Ben-Daya, M.1    Raouf, A.2
  • 3
    • 0027642234 scopus 로고
    • The distribution free newsboy problem: Review and extensions
    • Gallego, G and I Moon (1993). The distribution free newsboy problem: review and extensions. Journal of the Operational Research Society, 44(8), 825-834.
    • (1993) Journal of the Operational Research Society , vol.44 , Issue.8 , pp. 825-834
    • Gallego, G.1    Moon, I.2
  • 4
    • 0017416997 scopus 로고
    • An integrated inventory model for a single supplier-single customer problem
    • Goyal, SK (1976). An integrated inventory model for a single supplier-single customer problem. International Journal of Production Research, 15, 107-111.
    • (1976) International Journal of Production Research , vol.15 , pp. 107-111
    • Goyal, S.K.1
  • 5
    • 0001539415 scopus 로고
    • A one-vendor multi-buyer integrated inventory model: A comment
    • Goyal, SK (1995). A one-vendor multi-buyer integrated inventory model: A comment. European Journal of Operational Research, 82, 209-210.
    • (1995) European Journal of Operational Research , vol.82 , pp. 209-210
    • Goyal, S.K.1
  • 6
    • 0343081532 scopus 로고    scopus 로고
    • Determination of economic production-shipment policy for a single-vendor-single-buyer system
    • Goyal, SK and F Nebebe (2000). Determination of economic production-shipment policy for a single-vendor-single-buyer system. European Journal of Operational Research, 121, 175-178.
    • (2000) European Journal of Operational Research , vol.121 , pp. 175-178
    • Goyal, S.K.1    Nebebe, F.2
  • 7
    • 0031103642 scopus 로고    scopus 로고
    • Implementation of JIT purchasing: An integrated approach
    • Ha, D and S Kim (1997). Implementation of JIT purchasing: an integrated approach. Production Planning & Control, 8(2), 152-157.
    • (1997) Production Planning & Control , vol.8 , Issue.2 , pp. 152-157
    • Ha, D.1    Kim, S.2
  • 9
    • 0004102424 scopus 로고
    • Illinois: Dow Hones-Irwin
    • Hall, R (1983). Zero Inventories. Illinois: Dow Hones-Irwin.
    • (1983) Zero Inventories
    • Hall, R.1
  • 10
    • 0033079082 scopus 로고    scopus 로고
    • Some stochastic inventory models with deterministic variable lead time
    • Hariga, M and M Ben-Daya (1999). Some stochastic inventory models with deterministic variable lead time. European Journal of Operational Research, 113, 42-51.
    • (1999) European Journal of Operational Research , vol.113 , pp. 42-51
    • Hariga, M.1    Ben-Daya, M.2
  • 11
    • 0029344857 scopus 로고
    • Joint investment in quality improvement and setup reduction
    • Hayya, JC and JD Hong (1995). Joint investment in quality improvement and setup reduction. Computers & Operations Research, 22, 567-574.
    • (1995) Computers & Operations Research , vol.22 , pp. 567-574
    • Hayya, J.C.1    Hong, J.D.2
  • 12
    • 0031101243 scopus 로고    scopus 로고
    • The single-vendor single-buyer integrated production-inventory model with a generalized policy
    • Hill, RM (1997). The single-vendor single-buyer integrated production-inventory model with a generalized policy. European Journal of Operational Research, 97, 493-499.
    • (1997) European Journal of Operational Research , vol.97 , pp. 493-499
    • Hill, R.M.1
  • 13
    • 0032632360 scopus 로고    scopus 로고
    • The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem
    • Hill, RM (1999). The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem. International Journal of Production Research, 37(11), 2463-2475.
    • (1999) International Journal of Production Research , vol.37 , Issue.11 , pp. 2463-2475
    • Hill, R.M.1
  • 14
    • 0037431669 scopus 로고    scopus 로고
    • Partnership and negotiation support by joint optimal ordering/setup policies for JIT
    • Kelle, P, F Al-khateeb and PA Miller (2003). Partnership and negotiation support by joint optimal ordering/setup policies for JIT. International Journal of Production Economics, 81-82, 431-441.
    • (2003) International Journal of Production Economics , vol.81-82 , pp. 431-441
    • Kelle, P.1    Al-Khateeb, F.2    Miller, P.A.3
  • 16
    • 0242269840 scopus 로고    scopus 로고
    • The impact of quality considerations on material flow in two-stage inventory systems
    • Khouja, M (2003). The impact of quality considerations on material flow in two-stage inventory systems. International Journal of Production Research, 41(7), 1533-1547.
    • (2003) International Journal of Production Research , vol.41 , Issue.7 , pp. 1533-1547
    • Khouja, M.1
  • 18
    • 4444338623 scopus 로고    scopus 로고
    • A joint EOQ model for supplier and retailer with deteriorating items
    • Lin, C and Y Lin (2004). A joint EOQ model for supplier and retailer with deteriorating items.Asia-Pacific Journal of Operational Research, 21 (2), 163-178.
    • (2004) Asia-Pacific Journal of Operational Research , vol.21 , Issue.2 , pp. 163-178
    • Lin, C.1    Lin, Y.2
  • 19
    • 0029632685 scopus 로고
    • A one-vendor multi-buyer integrated inventory model
    • Lu, L (1995). A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research, 81, 312-323.
    • (1995) European Journal of Operational Research , vol.81 , pp. 312-323
    • Lu, L.1
  • 20
    • 0346638532 scopus 로고    scopus 로고
    • Inventory of damagable items with variable replenishment and stock-dependent demand
    • Mandai, M and M Maiti (2000). Inventory of damagable items with variable replenishment and stock-dependent demand. Asia-Pacific Journal of Operational Research, 17(1), 41-54.
    • (2000) Asia-Pacific Journal of Operational Research , vol.17 , Issue.1 , pp. 41-54
    • Mandai, M.1    Maiti, M.2
  • 22
    • 0001361091 scopus 로고
    • Multiproduct economic lot size models with investment costs for setup reduction and quality improvement: Review and extensions
    • Moon, I (1994). Multiproduct economic lot size models with investment costs for setup reduction and quality improvement: Review and extensions. International Journal of Production Research, 32, 2795-2801.
    • (1994) International Journal of Production Research , vol.32 , pp. 2795-2801
    • Moon, I.1
  • 24
    • 0030734196 scopus 로고    scopus 로고
    • Distribution free procedures for make-to-order (MTO), make-in advance (MIA), and composite policies
    • Moon, I and S Choi (1997). Distribution free procedures for make-to-order (MTO), make-in advance (MIA), and composite policies. International Journal of Production Economics, 48, 21-28.
    • (1997) International Journal of Production Economics , vol.48 , pp. 21-28
    • Moon, I.1    Choi, S.2
  • 25
    • 0032210280 scopus 로고    scopus 로고
    • A note on lead time and distributional assumptions in continuous review inventory models
    • Moon, I and S Choi (1998). A note on lead time and distributional assumptions in continuous review inventory models. Computers & Operations Research, 25, 1007-1012.
    • (1998) Computers & Operations Research , vol.25 , pp. 1007-1012
    • Moon, I.1    Choi, S.2
  • 26
    • 0033731023 scopus 로고    scopus 로고
    • The multi-item newsvendor problem with a budget constraint and fixed ordering costs
    • Moon, I and E Silver (2000). The multi-item newsvendor problem with a budget constraint and fixed ordering costs. Journal of the Operational Research Society, 51, 602-608.
    • (2000) Journal of the Operational Research Society , vol.51 , pp. 602-608
    • Moon, I.1    Silver, E.2
  • 27
    • 0034286621 scopus 로고    scopus 로고
    • Impact of investing in quality improvement on (Q, r, L) model involving the imperfect production process
    • Ouyang, LY and HC Chang (2000). Impact of investing in quality improvement on (Q, r, L) model involving the imperfect production process. Production Planning & Control, 11(6), 598-607.
    • (2000) Production Planning & Control , vol.11 , Issue.6 , pp. 598-607
    • Ouyang, L.Y.1    Chang, H.C.2
  • 28
    • 0036778937 scopus 로고    scopus 로고
    • Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process
    • Ouyang, LY, CK Chen and HC Chang (2002). Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process. Computers & Operations Research, 29, 1701-1717.
    • (2002) Computers & Operations Research , vol.29 , pp. 1701-1717
    • Ouyang, L.Y.1    Chen, C.K.2    Chang, H.C.3
  • 29
    • 0030170083 scopus 로고    scopus 로고
    • Mixture inventory model with backorders and lost sales for variable lead time
    • Ouyang, LY, NC Yeh and KS Wu (1996). Mixture inventory model with backorders and lost sales for variable lead time. Journal of the Operational Research Society, 47, 829-832.
    • (1996) Journal of the Operational Research Society , vol.47 , pp. 829-832
    • Ouyang, L.Y.1    Yeh, N.C.2    Wu, K.S.3
  • 30
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • Porteus, EL (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research, 34, 137-144.
    • (1986) Operations Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 31
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • Rosenblatt, MJ and HL Lee (1986). Economic production cycles with imperfect production processes. IIE Transactions, 18, 48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblatt, M.J.1    Lee, H.L.2
  • 32
    • 0002693448 scopus 로고
    • A min max solution of an inventory problem
    • K Arrow, S Karlin and H Scarf, (eds.), CA: Stanford University Press, Stanford
    • Scarf, H (1958). A min max solution of an inventory problem. In Studies in the mathematical Theory of Inventory and Production, K Arrow, S Karlin and H Scarf, (eds.), CA: Stanford University Press, Stanford.
    • (1958) Studies in the Mathematical Theory of Inventory and Production
    • Scarf, H.1
  • 33
    • 0035898993 scopus 로고    scopus 로고
    • The multi-item single period problem with an initial stock of convertible units
    • Silver, E and I Moon (2001). The multi-item single period problem with an initial stock of convertible units. European Journal of Operational Research, 132, 466-477.
    • (2001) European Journal of Operational Research , vol.132 , pp. 466-477
    • Silver, E.1    Moon, I.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.