메뉴 건너뛰기




Volumn 141, Issue 1, 2013, Pages 137-145

Particle swarm optimization with cocktail decoding method for hybrid flow shop scheduling problems with multiprocessor tasks

Author keywords

Hybrid flow shop; Lower bound; Multiprocessor task; Particle swarm optimization

Indexed keywords

COMPLEX NATURE; COMPUTATIONAL RESULTS; DECISION PROBLEMS; DECODING METHODS; HYBRID FLOW SHOP; HYBRID FLOW SHOP SCHEDULING; JOB SEQUENCES; LOWER BOUNDS; MAKESPAN; MULTIPROCESSOR TASKS; PARTICLE SWARM OPTIMIZATION ALGORITHM; QUALITY OF SOLUTION; SOLUTION QUALITY; STANDARD PSO; TASK-SCHEDULING;

EID: 84869490988     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2012.05.015     Document Type: Article
Times cited : (55)

References (27)
  • 3
    • 0033078202 scopus 로고    scopus 로고
    • Heuristics for scheduling in a flow shop with multiple processors
    • S.A. Brah, and L.L. Loo Heuristics for scheduling in a flow shop with multiple processors European Journal of Operational Research 113 1999 113 122
    • (1999) European Journal of Operational Research , vol.113 , pp. 113-122
    • Brah, S.A.1    Loo, L.L.2
  • 5
    • 0003899269 scopus 로고    scopus 로고
    • Heuristic algorithms for the two-stage hybrid flowshop problem
    • M. Haouari, and R. M'Hallah Heuristic algorithms for the two-stage hybrid flowshop problem Operations Research Letters 21 1997 43 53
    • (1997) Operations Research Letters , vol.21 , pp. 43-53
    • Haouari, M.1    M'Hallah, R.2
  • 6
    • 22044450246 scopus 로고    scopus 로고
    • A particle swarm optimization-based method for multiobjective design optimizations
    • S.L. Ho, S. Yang, G. Ni, E.W.C. Lo, and H.C. Wong A particle swarm optimization-based method for multiobjective design optimizations IEEE Transactions on Magnetics 41 2005 1756 1759
    • (2005) IEEE Transactions on Magnetics , vol.41 , pp. 1756-1759
    • Ho, S.L.1    Yang, S.2    Ni, G.3    Lo, E.W.C.4    Wong, H.C.5
  • 7
    • 37849189535 scopus 로고    scopus 로고
    • Metaheuristic approaches to the hybrid flow shop scheduling problem with a cost-related criterion
    • A. Janiak, E. Kozan, M. Lichtenstein, and C Oguz Metaheuristic approaches to the hybrid flow shop scheduling problem with a cost-related criterion International Journal of Production Economics 105 2007 407 424
    • (2007) International Journal of Production Economics , vol.105 , pp. 407-424
    • Janiak, A.1    Kozan, E.2    Lichtenstein, M.3    Oguz, C.4
  • 8
    • 28444469125 scopus 로고    scopus 로고
    • Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem
    • Z.H. Jin, Z. Yang, and T. Ito Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem International Journal of Production Economics 100 2006 322 334
    • (2006) International Journal of Production Economics , vol.100 , pp. 322-334
    • Jin, Z.H.1    Yang, Z.2    Ito, T.3
  • 9
    • 71449101038 scopus 로고    scopus 로고
    • Hybrid flow-shop: A memetic algorithm using constraint-based scheduling for efficient search
    • A. Jouglet, C. Oguz, and M. Sevaux Hybrid flow-shop: a memetic algorithm using constraint-based scheduling for efficient search Journal of Mathematical modeling and Algorithms 8 2009 271 292
    • (2009) Journal of Mathematical Modeling and Algorithms , vol.8 , pp. 271-292
    • Jouglet, A.1    Oguz, C.2    Sevaux, M.3
  • 10
    • 78049318410 scopus 로고    scopus 로고
    • Multiprocessor task scheduling in multistage hybrid flow-shops: A parallel greedy algorithm approach
    • C. Kahraman, O. Engin, I. Kaya, and R.E. Ozturk Multiprocessor task scheduling in multistage hybrid flow-shops: a parallel greedy algorithm approach Applied Soft Computing 10 2010 1293 1300
    • (2010) Applied Soft Computing , vol.10 , pp. 1293-1300
    • Kahraman, C.1    Engin, O.2    Kaya, I.3    Ozturk, R.E.4
  • 12
    • 79956319755 scopus 로고    scopus 로고
    • Climbing depth-bounded adjacent discrepancy search for solving hybrid flow shop scheduling problems with multiprocessor tasks
    • A. Lahimer, P. Lopez, and M. Haouari Climbing depth-bounded adjacent discrepancy search for solving hybrid flow shop scheduling problems with multiprocessor tasks Lecture note on computer science 6697 2011 117 130
    • (2011) Lecture Note on Computer Science , vol.6697 , pp. 117-130
    • Lahimer, A.1    Lopez, P.2    Haouari, M.3
  • 13
    • 33748522007 scopus 로고    scopus 로고
    • A performance evaluation of permutation vs. non-permutation schedules in a flowshop
    • C.J. Liao, L.M. Liao, and C.T. Tseng A performance evaluation of permutation vs. non-permutation schedules in a flowshop International Journal of Production Research 44 2006 4297 4309
    • (2006) International Journal of Production Research , vol.44 , pp. 4297-4309
    • Liao, C.J.1    Liao, L.M.2    Tseng, C.T.3
  • 14
    • 0141509086 scopus 로고    scopus 로고
    • A case study in a two-stage hybrid flow shop with setup time and dedicated machine
    • H.T. Lin, and C.J. Liao A case study in a two-stage hybrid flow shop with setup time and dedicated machine International Journal of Production Economics 86 2003 133 145
    • (2003) International Journal of Production Economics , vol.86 , pp. 133-145
    • Lin, H.T.1    Liao, C.J.2
  • 16
    • 0031250528 scopus 로고    scopus 로고
    • Scheduling multiprocessor tasks in a two-stage flow-shop environment
    • C. Oguz, and M.F. Ercan Scheduling multiprocessor tasks in a two-stage flow-shop environment Computers and Industrial Engineering 33 1997 269 272
    • (1997) Computers and Industrial Engineering , vol.33 , pp. 269-272
    • Oguz, C.1    Ercan, M.F.2
  • 17
    • 21144440772 scopus 로고    scopus 로고
    • A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks
    • C. Oǧuz, and M.F. Ercan A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks Journal of Scheduling 8 2005 323 351
    • (2005) Journal of Scheduling , vol.8 , pp. 323-351
    • Oǧuz, C.1    Ercan, M.F.2
  • 21
  • 23
    • 2442566880 scopus 로고    scopus 로고
    • Multiprocessor task scheduling in multistage hybrid flow-shops: A genetic algorithm approach
    • F. Sivrikaya-Serifoglu, and G. Ulusoy Multiprocessor task scheduling in multistage hybrid flow-shops: a genetic algorithm approach Journal of the Operational Research Society 55 2004 504 512
    • (2004) Journal of the Operational Research Society , vol.55 , pp. 504-512
    • Sivrikaya-Serifoglu, F.1    Ulusoy, G.2
  • 24
    • 48249084195 scopus 로고    scopus 로고
    • A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks
    • C.-T. Tseng, and C.-J. Liao A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks International Journal of Production Research 46 2008 4655 4670
    • (2008) International Journal of Production Research , vol.46 , pp. 4655-4670
    • Tseng, C.-T.1    Liao, C.-J.2
  • 25
    • 33745125063 scopus 로고    scopus 로고
    • Multiprocessor task scheduling in multistage hybrid flow-shops: An ant colony system approach
    • K.-C. Ying, and S.-W. Lin Multiprocessor task scheduling in multistage hybrid flow-shops: an ant colony system approach International Journal of Production Research 44 2006 3177 6161
    • (2006) International Journal of Production Research , vol.44 , pp. 3177-6161
    • Ying, K.-C.1    Lin, S.-W.2
  • 26
    • 70449629231 scopus 로고    scopus 로고
    • Scheduling multistage hybrid flowshops with multiprocessor tasks by an effective heuristic
    • K.-C. Ying, and S.-W. Lin Scheduling multistage hybrid flowshops with multiprocessor tasks by an effective heuristic International Journal of Production Research 47 2009 3525 3538
    • (2009) International Journal of Production Research , vol.47 , pp. 3525-3538
    • Ying, K.-C.1    Lin, S.-W.2
  • 27


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.