-
3
-
-
0033078202
-
Heuristics for scheduling in a flow shop with multiple processors
-
S.A. Brah, and L.L. Loo Heuristics for scheduling in a flow shop with multiple processors European Journal of Operational Research 113 1999 113 122
-
(1999)
European Journal of Operational Research
, vol.113
, pp. 113-122
-
-
Brah, S.A.1
Loo, L.L.2
-
5
-
-
0003899269
-
Heuristic algorithms for the two-stage hybrid flowshop problem
-
M. Haouari, and R. M'Hallah Heuristic algorithms for the two-stage hybrid flowshop problem Operations Research Letters 21 1997 43 53
-
(1997)
Operations Research Letters
, vol.21
, pp. 43-53
-
-
Haouari, M.1
M'Hallah, R.2
-
6
-
-
22044450246
-
A particle swarm optimization-based method for multiobjective design optimizations
-
S.L. Ho, S. Yang, G. Ni, E.W.C. Lo, and H.C. Wong A particle swarm optimization-based method for multiobjective design optimizations IEEE Transactions on Magnetics 41 2005 1756 1759
-
(2005)
IEEE Transactions on Magnetics
, vol.41
, pp. 1756-1759
-
-
Ho, S.L.1
Yang, S.2
Ni, G.3
Lo, E.W.C.4
Wong, H.C.5
-
8
-
-
28444469125
-
Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem
-
Z.H. Jin, Z. Yang, and T. Ito Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem International Journal of Production Economics 100 2006 322 334
-
(2006)
International Journal of Production Economics
, vol.100
, pp. 322-334
-
-
Jin, Z.H.1
Yang, Z.2
Ito, T.3
-
9
-
-
71449101038
-
Hybrid flow-shop: A memetic algorithm using constraint-based scheduling for efficient search
-
A. Jouglet, C. Oguz, and M. Sevaux Hybrid flow-shop: a memetic algorithm using constraint-based scheduling for efficient search Journal of Mathematical modeling and Algorithms 8 2009 271 292
-
(2009)
Journal of Mathematical Modeling and Algorithms
, vol.8
, pp. 271-292
-
-
Jouglet, A.1
Oguz, C.2
Sevaux, M.3
-
10
-
-
78049318410
-
Multiprocessor task scheduling in multistage hybrid flow-shops: A parallel greedy algorithm approach
-
C. Kahraman, O. Engin, I. Kaya, and R.E. Ozturk Multiprocessor task scheduling in multistage hybrid flow-shops: a parallel greedy algorithm approach Applied Soft Computing 10 2010 1293 1300
-
(2010)
Applied Soft Computing
, vol.10
, pp. 1293-1300
-
-
Kahraman, C.1
Engin, O.2
Kaya, I.3
Ozturk, R.E.4
-
12
-
-
79956319755
-
Climbing depth-bounded adjacent discrepancy search for solving hybrid flow shop scheduling problems with multiprocessor tasks
-
A. Lahimer, P. Lopez, and M. Haouari Climbing depth-bounded adjacent discrepancy search for solving hybrid flow shop scheduling problems with multiprocessor tasks Lecture note on computer science 6697 2011 117 130
-
(2011)
Lecture Note on Computer Science
, vol.6697
, pp. 117-130
-
-
Lahimer, A.1
Lopez, P.2
Haouari, M.3
-
13
-
-
33748522007
-
A performance evaluation of permutation vs. non-permutation schedules in a flowshop
-
C.J. Liao, L.M. Liao, and C.T. Tseng A performance evaluation of permutation vs. non-permutation schedules in a flowshop International Journal of Production Research 44 2006 4297 4309
-
(2006)
International Journal of Production Research
, vol.44
, pp. 4297-4309
-
-
Liao, C.J.1
Liao, L.M.2
Tseng, C.T.3
-
14
-
-
0141509086
-
A case study in a two-stage hybrid flow shop with setup time and dedicated machine
-
H.T. Lin, and C.J. Liao A case study in a two-stage hybrid flow shop with setup time and dedicated machine International Journal of Production Economics 86 2003 133 145
-
(2003)
International Journal of Production Economics
, vol.86
, pp. 133-145
-
-
Lin, H.T.1
Liao, C.J.2
-
16
-
-
0031250528
-
Scheduling multiprocessor tasks in a two-stage flow-shop environment
-
C. Oguz, and M.F. Ercan Scheduling multiprocessor tasks in a two-stage flow-shop environment Computers and Industrial Engineering 33 1997 269 272
-
(1997)
Computers and Industrial Engineering
, vol.33
, pp. 269-272
-
-
Oguz, C.1
Ercan, M.F.2
-
17
-
-
21144440772
-
A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks
-
C. Oǧuz, and M.F. Ercan A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks Journal of Scheduling 8 2005 323 351
-
(2005)
Journal of Scheduling
, vol.8
, pp. 323-351
-
-
Oǧuz, C.1
Ercan, M.F.2
-
19
-
-
0141859883
-
Hybrid flow-shop schedsuling problems with multiprocessor task systems
-
C. Oǧuz, Y. Zinder, V.H. Do, A. Janiak, and M. Lichtenstein Hybrid flow-shop schedsuling problems with multiprocessor task systems European Journal of Operational Research 152 2004 115 131
-
(2004)
European Journal of Operational Research
, vol.152
, pp. 115-131
-
-
Oǧuz, C.1
Zinder, Y.2
Do, V.H.3
Janiak, A.4
Lichtenstein, M.5
-
21
-
-
2542462204
-
Sequencing in the order a, b, with multiplicity of machines for a single operation
-
T.B.K. Rao Sequencing in the order a, b, with multiplicity of machines for a single operation OPSEARCH: Journal of the Operational Research Society of India 7 1970 135 144
-
(1970)
OPSEARCH: Journal of the Operational Research Society of India
, vol.7
, pp. 135-144
-
-
Rao, T.B.K.1
-
23
-
-
2442566880
-
Multiprocessor task scheduling in multistage hybrid flow-shops: A genetic algorithm approach
-
F. Sivrikaya-Serifoglu, and G. Ulusoy Multiprocessor task scheduling in multistage hybrid flow-shops: a genetic algorithm approach Journal of the Operational Research Society 55 2004 504 512
-
(2004)
Journal of the Operational Research Society
, vol.55
, pp. 504-512
-
-
Sivrikaya-Serifoglu, F.1
Ulusoy, G.2
-
24
-
-
48249084195
-
A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks
-
C.-T. Tseng, and C.-J. Liao A particle swarm optimization algorithm for hybrid flow-shop scheduling with multiprocessor tasks International Journal of Production Research 46 2008 4655 4670
-
(2008)
International Journal of Production Research
, vol.46
, pp. 4655-4670
-
-
Tseng, C.-T.1
Liao, C.-J.2
-
25
-
-
33745125063
-
Multiprocessor task scheduling in multistage hybrid flow-shops: An ant colony system approach
-
K.-C. Ying, and S.-W. Lin Multiprocessor task scheduling in multistage hybrid flow-shops: an ant colony system approach International Journal of Production Research 44 2006 3177 6161
-
(2006)
International Journal of Production Research
, vol.44
, pp. 3177-6161
-
-
Ying, K.-C.1
Lin, S.-W.2
-
26
-
-
70449629231
-
Scheduling multistage hybrid flowshops with multiprocessor tasks by an effective heuristic
-
K.-C. Ying, and S.-W. Lin Scheduling multistage hybrid flowshops with multiprocessor tasks by an effective heuristic International Journal of Production Research 47 2009 3525 3538
-
(2009)
International Journal of Production Research
, vol.47
, pp. 3525-3538
-
-
Ying, K.-C.1
Lin, S.-W.2
|