-
2
-
-
78951480940
-
Solving two-stage hybrid flow shop using climbing depth-bounded discrepancy search
-
Ben Hmida, A., Haouari, M., Huguet, M.-J., Lopez, P.: Solving two-stage hybrid flow shop using climbing depth-bounded discrepancy search. Computers and Industrial Engineering 60(2), 320-327 (2010)
-
(2010)
Computers and Industrial Engineering
, vol.60
, Issue.2
, pp. 320-327
-
-
Hmida, B.A.1
Haouari, M.2
Huguet, M.-J.3
Lopez, P.4
-
3
-
-
84969447092
-
Climbing depth-bounded discrepancy search for solving hybrid flow shop scheduling problems
-
Ben Hmida, A., Huguet, M.-J., Lopez, P., Haouari, M.: Climbing depth-bounded discrepancy search for solving hybrid flow shop scheduling problems. European Journal of Industrial Engineering 1(2), 223-243 (2007)
-
(2007)
European Journal of Industrial Engineering
, vol.1
, Issue.2
, pp. 223-243
-
-
Hmida, B.A.1
Huguet, M.-J.2
Lopez, P.3
Haouari, M.4
-
4
-
-
3342903540
-
A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation
-
Bertel, S., Billaut, J.-C.: A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation. European Journal of Operational Research 159(3), 651-662 (2004)
-
(2004)
European Journal of Operational Research
, vol.159
, Issue.3
, pp. 651-662
-
-
Bertel, S.1
Billaut, J.-C.2
-
5
-
-
0011725015
-
An algorithm for finding optimal or near optimal solutions to the production scheduling problem
-
Brooks, G., White, C.: An algorithm for finding optimal or near optimal solutions to the production scheduling problem. Journal of Industrial Engineering 16, 34-40 (1965)
-
(1965)
Journal of Industrial Engineering
, vol.16
, pp. 34-40
-
-
Brooks, G.1
White, C.2
-
6
-
-
0033079757
-
General multiprocessor task scheduling
-
Chen, J., Lee, C.-Y.: General multiprocessor task scheduling. Naval Research Logistics 46, 57-74 (1999)
-
(1999)
Naval Research Logistics
, vol.46
, pp. 57-74
-
-
Chen, J.1
Lee, C.-Y.2
-
7
-
-
0003533609
-
Performance of various computers using standard linear equations software
-
University of Tennessee
-
Dongarra, J.: Performance of various computers using standard linear equations software. Technical report, University of Tennessee (2009)
-
(2009)
Technical Report
-
-
Dongarra, J.1
-
8
-
-
85044469033
-
Real-time image interpretation on a multi-layer architecture
-
Ercan, M. F., Fung, Y.-F.: Real-time image interpretation on a multi-layer architecture. In: Proceedings of IEEE TENCON 1999, pp. 1303-1306 (1999)
-
(1999)
Proceedings of IEEE TENCON 1999
, pp. 1303-1306
-
-
Ercan, M.F.1
Fung, Y.-F.2
-
10
-
-
0002409769
-
Limited discrepancy search
-
Montréal, Québec, Canada, August
-
Harvey, W. D., Ginsberg, M. L.: Limited discrepancy search. In: Proceedings of the 14th International Joint Conference on Artificial Intelligence (IJCAI 1995), Montréal, Québec, Canada, vol. 1, pp. 607-615 (August 1995)
-
(1995)
Proceedings of the 14th International Joint Conference on Artificial Intelligence (IJCAI 1995)
, vol.1
, pp. 607-615
-
-
Harvey, W.D.1
Ginsberg, M.L.2
-
11
-
-
71449101038
-
Hybrid flow-shop: A memetic algorithm using constraint-based scheduling for efficient search
-
Jouglet, A., Oǧuz, C., Sevaux, M.: Hybrid flow-shop: a memetic algorithm using constraint-based scheduling for efficient search. Journal of Mathematical Modelling and Algorithms 8, 271-292 (2009)
-
(2009)
Journal of Mathematical Modelling and Algorithms
, vol.8
, pp. 271-292
-
-
Jouglet, A.1
Oǧuz, C.2
Sevaux, M.3
-
12
-
-
0002866635
-
The critical-path method: Resources planning and scheduling
-
Thompson, G. L., Muth, J. F. eds., Prentice-Hall, Englewood Cliffs
-
Kelley Jr, J. E.: The critical-path method: Resources planning and scheduling. In: Thompson, G. L., Muth, J. F. (eds.) Industrial Scheduling, pp. 347-365. Prentice-Hall, Englewood Cliffs (1963)
-
(1963)
Industrial Scheduling
, pp. 347-365
-
-
Kelley Jr., J.E.1
-
13
-
-
38149031766
-
CP-based local branching
-
Bessière, C. ed., Springer, Heidelberg
-
Kiziltan, Z., Lodi, A., Milano, M., Parisini, F.: CP-based local branching. In: Bessière, C. (ed.) CP 2007. LNCS, vol. 4741, pp. 847-855. Springer, Heidelberg (2007)
-
(2007)
CP 2007. LNCS
, vol.4741
, pp. 847-855
-
-
Kiziltan, Z.1
Lodi, A.2
Milano, M.3
Parisini, F.4
-
14
-
-
0030361834
-
Improved limited discrepancy search
-
Portland, OR, August
-
Korf, R. E.: Improved limited discrepancy search. In: Proceedings of the 13th National Conference on Artificial Intelligence (AAAI 1996), Portland, OR, vol. 1, pp. 286-291 (August 1996)
-
(1996)
Proceedings of the 13th National Conference on Artificial Intelligence (AAAI 1996)
, vol.1
, pp. 286-291
-
-
Korf, R.E.1
-
15
-
-
0344644485
-
On the relation between complete and incomplete search: An informal discussion
-
Milano, M., Roli, A.: On the relation between complete and incomplete search: an informal discussion. In: Proceedings of CPAIOR 2002, le Croisic, France, pp. 237-250 (2002)
-
(2002)
Proceedings of CPAIOR 2002, le Croisic, France
, pp. 237-250
-
-
Milano, M.1
Roli, A.2
-
16
-
-
21144440772
-
A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks
-
DOI 10.1007/s10951-005-1640-y
-
Oǧuz, C., Ercan, M. F.: A genetic algorithm for hybrid flow-shop scheduling with multiprocessor tasks. Journal of Scheduling 8, 323-351 (2005) (Pubitemid 40878783)
-
(2005)
Journal of Scheduling
, vol.8
, Issue.4
, pp. 323-351
-
-
Oguz, C.1
Ercan, M.F.2
-
17
-
-
35248901399
-
Parallel genetic algorithm for a flow shop problem with multiprocessor tasks
-
Berlin, Heidelberg
-
Oǧuz, C., Fung, Y.-F., Ercan, M. F., Qi, X.-T.: Parallel genetic algorithm for a flow shop problem with multiprocessor tasks. In: International Conference on Computational Science, Berlin, Heidelberg, pp. 548-559 (2003)
-
(2003)
International Conference on Computational Science
, pp. 548-559
-
-
Oǧuz, C.1
Fung, Y.-F.2
Ercan, M.F.3
Qi, X.-T.4
-
18
-
-
0141859883
-
Hybrid flow shop scheduling problems with multiprocessor task systems
-
Oǧuz, C., Zinder, Y., Ha Do, V., Janiak, A., Lichtenstein, M.: Hybrid flow shop scheduling problems with multiprocessor task systems. European Journal of Operational Research 152, 115-133 (2004)
-
(2004)
European Journal of Operational Research
, vol.152
, pp. 115-133
-
-
Oǧuz, C.1
Zinder, Y.2
Do, H.V.3
Janiak, A.4
Lichtenstein, M.5
-
20
-
-
2442566880
-
Multiprocessor task scheduling in multistage hybrid flow-shops: A genetic algorithm approach
-
Şerifoǧlu, F. S., Ulusoy, G.: Multiprocessor task scheduling in multistage hybrid flow-shops: A genetic algorithm approach. European Journal of Operational Research 55(5), 504-512 (2004)
-
(2004)
European Journal of Operational Research
, vol.55
, Issue.5
, pp. 504-512
-
-
Şerifoǧlu, F.S.1
Ulusoy, G.2
-
21
-
-
33745125063
-
Multiprocessor task scheduling in multistage hybrid flow-shops: An ant colony system approach
-
Şlerifoǧlu, F. S., Ulusoy, G.: Multiprocessor task scheduling in multistage hybrid flow-shops: An ant colony system approach. International Journal of Production Research 44(16), 3161-3177 (2006)
-
(2006)
International Journal of Production Research
, vol.44
, Issue.16
, pp. 3161-3177
-
-
Şlerifoǧlu, F.S.1
Ulusoy, G.2
-
22
-
-
0029636114
-
Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
-
Sprecher, A., Kolisch, R., Drexl, A.: Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem. European Journal of Operational Research 80(1), 94-102 (1995)
-
(1995)
European Journal of Operational Research
, vol.80
, Issue.1
, pp. 94-102
-
-
Sprecher, A.1
Kolisch, R.2
Drexl, A.3
-
23
-
-
84880668868
-
Depth-bounded discrepancy search
-
Nagoya, Japan, August
-
Walsh, T.: Depth-bounded discrepancy search. In: Proceedings of the 15th International Joint Conference on Artificial Intelligence (IJCAI 1997), Nagoya, Japan, vol. 2, pp. 1388-1395 (August 1997)
-
(1997)
Proceedings of the 15th International Joint Conference on Artificial Intelligence (IJCAI 1997)
, vol.2
, pp. 1388-1395
-
-
Walsh, T.1
|