|
Volumn 431, Issue 1-3, 2012, Pages 10-15
|
PIE preparation of the MEGAPIE target
|
Author keywords
[No Author keywords available]
|
Indexed keywords
BEAM POWER;
HOT CELL;
INTERIM STORAGE FACILITIES;
LEAD-BISMUTH EUTECTICS;
POST IRRADIATION EXAMINATIONS;
SAMPLE EXTRACTION;
STORAGE FACILITIES;
VISUAL INSPECTION;
BISMUTH;
NUCLEAR POWER PLANTS;
RADIOACTIVE WASTES;
EXTRACTION;
|
EID: 84868696962
PISSN: 00223115
EISSN: None
Source Type: Journal
DOI: 10.1016/j.jnucmat.2011.11.024 Document Type: Article |
Times cited : (12)
|
References (9)
|