-
1
-
-
0032682390
-
Aircraft maintenance workforce scheduling: A case study
-
Alfares, H.K. Aircraft maintenance workforce scheduling: a case study Journal of Quality in Maintenance Engineering 5 2 1999 78-88
-
(1999)
Journal of Quality in Maintenance Engineering
, vol.5
, Issue.2
, pp. 78-88
-
-
Alfares, H.K.1
-
2
-
-
84859821020
-
Insights into the maintenance, repair and overhaul configurations of European airlines
-
Al-kaabi, H., Potter, A., Naim, M. Insights into the maintenance, repair and overhaul configurations of European airlines Journal of Air Transportation 12 2 2007 27-42
-
(2007)
Journal of Air Transportation
, vol.12
, Issue.2
, pp. 27-42
-
-
Al-Kaabi, H.1
Potter, A.2
Naim, M.3
-
4
-
-
25844500378
-
Expert system for aircraft maintenance services industry
-
DOI 10.1108/13552510510626972
-
Cheung, A., Ip, W.H., Lu, D. Methodology and theory expert system for aircraft maintenance services industry Journal of Quality in Maintenance Engineering 11 4 2005a 348-58 (Pubitemid 41392796)
-
(2005)
Journal of Quality in Maintenance Engineering
, vol.11
, Issue.4
, pp. 348-358
-
-
Cheung, A.1
Ip, W.H.2
Lu, D.3
-
5
-
-
13844280941
-
An aircraft service scheduling model using genetic algorithms
-
DOI 10.1108/17410380510574112, Logistics and Supply Chain Management with Artificial Intelligence Techniques - Part 2
-
Cheung, A., Ip, W.H., Lu, D., Lai, C.L. An aircraft service scheduling model using genetic algorithms Journal of Manufacturing Technology Management 16 1 2005b 109-19 (Pubitemid 40242624)
-
(2005)
Journal of Manufacturing Technology Management
, vol.16
, Issue.1
, pp. 109-119
-
-
Cheung, A.1
Ip, W.H.2
Lu, D.3
Lai, C.L.4
-
6
-
-
0026243071
-
A DSS for capacity planning of aircraft maintenance personnel
-
Dijkstra, M.C., Kroon, L.G., Van Nunen, J.A.E.E., Summon, M. A DSS for capacity planning of aircraft maintenance personnel International Journal of Production Economics 23 1-3 1991 69-78
-
(1991)
International Journal of Production Economics
, vol.23
, Issue.13
, pp. 69-78
-
-
Dijkstra, M.C.1
Kroon, L.G.2
Van Nunen, J.A.E.E.3
Summon, M.4
-
9
-
-
84868111434
-
An on-line system for aircraft maintenance
-
Ho, K.W., Chan, L.Y. An on-line system for aircraft maintenance Journal of Systems Management. 45 9 1994 24-8
-
(1994)
Journal of Systems Management.
, vol.45
, Issue.9
, pp. 24-28
-
-
Ho, K.W.1
Chan, L.Y.2
-
10
-
-
0035815827
-
Maintenance spare parts logistics: Special characteristics and strategic choices
-
DOI 10.1016/S0925-5273(00)00112-2, PII S0925527300001122
-
Huiskonen, J. Maintenance spare parts logistics: special characteristics and strategic choices International Journal of Production Economics 71 1-3 2001 125-33 (Pubitemid 32478614)
-
(2001)
International Journal of Production Economics
, vol.71
, Issue.1-3
, pp. 125-133
-
-
Huiskonen, J.1
-
11
-
-
59049093823
-
Cooperative strategies for the availability service of repairable aircraft components
-
Kilpi, J., Toyli, J., Vepsalainen, A. Cooperative strategies for the availability service of repairable aircraft components International Journal of Production Economics 117 2 2009 360-70
-
(2009)
International Journal of Production Economics
, vol.117
, Issue.2
, pp. 360-370
-
-
Kilpi, J.1
Toyli, J.2
Vepsalainen, A.3
-
12
-
-
0033335427
-
Civil aircraft maintenance and support: Fault diagnosis from a business perspective
-
Knotts, R.M.H. Civil aircraft maintenance and support: fault diagnosis from a business perspective Journal of Quality in Maintenance Engineering 5 4 1999 335-47
-
(1999)
Journal of Quality in Maintenance Engineering
, vol.5
, Issue.4
, pp. 335-347
-
-
Knotts, R.M.H.1
-
13
-
-
84868119556
-
ERP for MRO: An alternative perspective; From package programs to niche providers
-
Lam, M.D. ERP FOR MRO: an alternative perspective; from package programs to niche providers Overhaul & Maintenance 14 5 2008 36-43
-
(2008)
Overhaul & Maintenance
, vol.14
, Issue.5
, pp. 36-43
-
-
Lam, M.D.1
-
15
-
-
33644869310
-
Generation of possible multiple components disassembly sequence for maintenance using a disassembly constraint graph
-
DOI 10.1016/j.ijpe.2005.01.012, PII S0925527305000526
-
Li, J.R., Khoo, L.P., Tor, S.B. Generation of possible multiple components disassembly sequence for maintenance using a disassembly constraint graph International Journal of Production Economics 102 1 2006 51-65 (Pubitemid 43374567)
-
(2006)
International Journal of Production Economics
, vol.102
, Issue.1
, pp. 51-65
-
-
Li, J.R.1
Khoo, L.P.2
Tor, S.B.3
-
16
-
-
27844556387
-
A lean architecture for transforming the aerospace maintenance, repair and overhaul (MRO) enterprise
-
DOI 10.1108/17410400510627499
-
Mathaisel, D.F.X. A lean architecture for transforming the aerospace maintenance, repair and overhaul (MRO) enterprise International Journal of Productivity and Performance Management 54 8 2005 623-44 (Pubitemid 41661319)
-
(2005)
International Journal of Productivity and Performance Management
, vol.54
, Issue.8
, pp. 623-644
-
-
Mathaisel, D.F.X.1
-
18
-
-
84948216825
-
Decision diagram approach to 'On Condition' philosophies
-
Nowlan, S. Decision diagram approach to 'On Condition' philosophies Aircraft Engineering April 1972 35-7
-
(1972)
Aircraft Engineering
, pp. 35-37
-
-
Nowlan, S.1
-
19
-
-
80052243439
-
Aircraft maintenance management systems
-
Oelsner, M. Aircraft maintenance management systems Aircraft Engineering April 1979 22-4
-
(1979)
Aircraft Engineering
, pp. 22-24
-
-
Oelsner, M.1
-
20
-
-
35148895483
-
Scheduling paths for merged CPM networks with MRP bills-of-materials
-
Toncich, D. Industrial Research Institute Swinburne Melbourne
-
Samaranayake, P. Toncich, D. Scheduling paths for merged CPM networks with MRP bills-of-materials Profiles in Industrial Research Industrial Research Institute Swinburne Melbourne 1998
-
(1998)
Profiles in Industrial Research
-
-
Samaranayake, P.1
-
21
-
-
35148820294
-
Integration of production planning, project management and logistics systems for supply chain management
-
Samaranayake, P., Toncich, D. Integration of production planning, project management and logistics systems for supply chain management International Journal of Production Research 45 22 2007 5414-47
-
(2007)
International Journal of Production Research
, vol.45
, Issue.22
, pp. 5414-5447
-
-
Samaranayake, P.1
Toncich, D.2
-
22
-
-
0036372580
-
Development of engineering structures for scheduling and control of aircraft maintenance
-
Samaranayake, P., Lewis, G.S., Woxvold, E.R.A., Toncich, D. Development of engineering structures for scheduling and control of aircraft maintenance International Journal of Operations and Production Management 22 8 2002 843-67
-
(2002)
International Journal of Operations and Production Management
, vol.22
, Issue.8
, pp. 843-867
-
-
Samaranayake, P.1
Lewis, G.S.2
Woxvold, E.R.A.3
Toncich, D.4
-
25
-
-
0027012590
-
Extending MRP II hierarchical structures to PERT/CPM networks
-
American Production and Inventory Control Society
-
Woxvold, E.R.A. Extending MRP II hierarchical structures to PERT/CPM networks 1992 447-51 American Production and Inventory Control Society, 35th International Conference, Montreal
-
(1992)
35th International Conference, Montreal
, pp. 447-451
-
-
Woxvold, E.R.A.1
-
27
-
-
1442359113
-
Methods to reduce direct maintenance costs for commercial aircraft
-
Wu, H., Liu, Y., Ding, Y., Liu, J. Methods to reduce direct maintenance costs for commercial aircraft Aircraft Engineering and Aerospace Technology 76 1 2004 15-8
-
(2004)
Aircraft Engineering and Aerospace Technology
, vol.76
, Issue.1
, pp. 15-18
-
-
Wu, H.1
Liu, Y.2
Ding, Y.3
Liu, J.4
|