메뉴 건너뛰기




Volumn 54, Issue 8, 2005, Pages 623-644

A lean architecture for transforming the aerospace maintenance, repair and overhaul (MRO) enterprise

Author keywords

Aerospace industry; Business development; Change management; Lean production

Indexed keywords


EID: 27844556387     PISSN: 17410401     EISSN: None     Source Type: Journal    
DOI: 10.1108/17410400510627499     Document Type: Article
Times cited : (55)

References (63)
  • 2
    • 84986123937 scopus 로고    scopus 로고
    • Position statement – GERAM and its possible implications to system and software engineering application
    • paper presented at IFIP-IFAC Task Force on Enterprise Integration Strategic Workshop on Enterprise Integration and Enterprise Computing (Systems and Software Engineering Standards in the Context of Enterprise Integration), Enterprise Integration Group, School of Computing and Information Technology (Faculty of ICT), Griffith University, 19-20 November.
    • Bernus, P. (1998), “Position statement – GERAM and its possible implications to system and software engineering application”, paper presented at IFIP-IFAC Task Force on Enterprise Integration Strategic Workshop on Enterprise Integration and Enterprise Computing (Systems and Software Engineering Standards in the Context of Enterprise Integration), Enterprise Integration Group, School of Computing and Information Technology (Faculty of ICT), Griffith University, 19-20 November.
    • (1998)
    • Bernus, P.1
  • 4
    • 84986031427 scopus 로고    scopus 로고
    • Enterprise-wide compliance programs
    • Speech at the Bond Market Association's Legal and Compliance Conference, New York, NY, 4 February, BIS Review.
    • Bies, S.S. (2004), “Enterprise-wide compliance programs”, Speech at the Bond Market Association's Legal and Compliance Conference, New York, NY, 4 February, BIS Review.
    • (2004)
    • Bies, S.S.1
  • 7
    • 0021463931 scopus 로고
    • Planning the introduction and predicting the benefits of group technology
    • Burbidge, J. and Dale, B. (1984), “Planning the introduction and predicting the benefits of group technology”, Engineering Costs and Production Economics, Vol. 8, pp. 117-28.
    • (1984) Engineering Costs and Production Economics , vol.8 , pp. 117-128
    • Burbidge, J.1    Dale, B.2
  • 8
    • 0029259780 scopus 로고
    • Improving productivity through cellular manufacturing
    • Collet, S. and Spicer, R. (1995), “Improving productivity through cellular manufacturing”, Production & Inventory Management Journal, Vol. 36 No. 1, pp. 71-5.
    • (1995) Production & Inventory Management Journal , vol.36 , pp. 71-75
    • Collet, S.1    Spicer, R.2
  • 9
    • 27844501770 scopus 로고    scopus 로고
    • DEMEP: Delaware manufacturing extension partnership
    • available at: www.demep.org/Lean_Manufacturing.asp.
    • DEMEP, Delaware manufacturing extension partnership (2004), “DEMEP: Delaware manufacturing extension partnership”, available at: www.demep.org/Lean_Manufacturing.asp.
    • (2004)
  • 12
    • 0003639096 scopus 로고
    • GIM, GRAI integrated methodology, a methodology for designing CIM systems
    • Version 1.0, Unnumbered Report, LAP/GRAI University Bordeaux 1, Bordeaux, May.
    • Doumeingts, G., Vallespir, B., Zanettin, M. and Chen, D. (1992), “GIM, GRAI integrated methodology, a methodology for designing CIM systems”, Version 1.0, Unnumbered Report, LAP/GRAI University Bordeaux 1, Bordeaux, May.
    • (1992)
    • Doumeingts, G.1    Vallespir, B.2    Zanettin, M.3    Chen, D.4
  • 14
    • 0023643527 scopus 로고
    • A successful implementation of group technology and cell manufacturing
    • Fry, T., Breen, M. and Wilson, M. (1987), “A successful implementation of group technology and cell manufacturing”, Production & Inventory Management Journal, Vol. 28 No. 3, pp. 4-6.
    • (1987) Production & Inventory Management Journal , vol.28 , pp. 4-6
    • Fry, T.1    Breen, M.2    Wilson, M.3
  • 16
    • 0041979900 scopus 로고
    • From job shop to just-in-time-a successful conversion
    • Howard, M. and Newman, R. (1993), “From job shop to just-in-time-a successful conversion”, Production & Inventory Management Journal, Vol. 34 No. 3, pp. 70-4.
    • (1993) Production & Inventory Management Journal , vol.34 , pp. 70-74
    • Howard, M.1    Newman, R.2
  • 17
    • 0024714857 scopus 로고
    • Group technology in the US manufacturing industry: a survey of current practices
    • Hyer, N. and Wemmerlov, U. (1989), “Group technology in the US manufacturing industry: a survey of current practices”, International Journal of Production Research, Vol. 27 No. 8, pp. 1287-304.
    • (1989) International Journal of Production Research , vol.27 , pp. 1287-1304
    • Hyer, N.1    Wemmerlov, U.2
  • 18
  • 20
    • 84986168843 scopus 로고    scopus 로고
    • Industrial automation systems – requirements for enterprise-reference architectures and methodologies
    • ISO/WD 15704, 15 July.
    • International Organization for Standardization (ISO) (2003), “Industrial automation systems – requirements for enterprise-reference architectures and methodologies”, ISO/WD 15704, 15 July.
    • (2003)
  • 21
    • 27844562863 scopus 로고    scopus 로고
    • Market research for OC-ALC maintenance repair and overhaul transformation program
    • Oklahoma City Air Logistics Center, MA-T, US Air Force, December.
    • Kaiser-Arnett, T. (2003), “Market research for OC-ALC maintenance repair and overhaul transformation program”, Oklahoma City Air Logistics Center, MA-T, US Air Force, December.
    • (2003)
    • Kaiser-Arnett, T.1
  • 22
    • 27844576303 scopus 로고    scopus 로고
    • Lean manufacturing principles: a comprehensive framework for improving production efficiency
    • Master of Science thesis, Mechanical Engineering, Massachusetts Institute of Technology, Cambridge, MA, February.
    • Kilpatrick, A.M. (1997), “Lean manufacturing principles: a comprehensive framework for improving production efficiency”, Master of Science thesis, Mechanical Engineering, Massachusetts Institute of Technology, Cambridge, MA, February.
    • (1997)
    • Kilpatrick, A.M.1
  • 23
    • 0003621845 scopus 로고    scopus 로고
    • Harvard Business School Press, Boston, MA.
    • Kotter, J.P. (1996), Leading Change, Harvard Business School Press, Boston, MA.
    • (1996) Leading Change
    • Kotter, J.P.1
  • 25
    • 27844593984 scopus 로고    scopus 로고
    • The kaizen blitz: accelerating breakthroughs in productivity and performance
    • Wiley, New York, NY.
    • Laraia, A.C., Moody, P.E. and Hall, R.W. (1999), “The kaizen blitz: accelerating breakthroughs in productivity and performance”, The Association of Manufacturing Excellence, Wiley, New York, NY.
    • (1999) The Association of Manufacturing Excellence
    • Laraia, A.C.1    Moody, P.E.2    Hall, R.W.3
  • 26
    • 27844474891 scopus 로고    scopus 로고
    • Productivity Press, Portland, OR.
    • Leflar, J. (2001), Practical TPM, Productivity Press, Portland, OR.
    • (2001) Practical TPM
    • Leflar, J.1
  • 27
    • 0029369548 scopus 로고
    • A conversion from a functional to a cellular manufacturing layout at Steward, Inc.
    • Levasseur, G., Helms, M. and Zink, A. (1995), “A conversion from a functional to a cellular manufacturing layout at Steward, Inc.”, Production & Inventory Management Journal, Vol. 36 No. 3, pp. 37-42.
    • (1995) Production & Inventory Management Journal , vol.36 , pp. 37-42
    • Levasseur, G.1    Helms, M.2    Zink, A.3
  • 28
    • 0009593454 scopus 로고    scopus 로고
    • Productivity Press, Portland, OR.
    • Liker, J. (1997), Becoming Lean, Productivity Press, Portland, OR.
    • (1997) Becoming Lean
    • Liker, J.1
  • 29
    • 27844450152 scopus 로고    scopus 로고
    • Present and past performance information
    • unpublished report, Spartanburg, available at: www.lg.com.
    • Lockwood Greene Engineers, Inc. (2005), “Present and past performance information”, unpublished report, Spartanburg, available at: www.lg.com.
    • (2005)
  • 30
    • 84986123882 scopus 로고    scopus 로고
    • available at: www.lean.mit.edu.
    • Massachusetts Institute of Technology (MIT), Lean Aerospace Initiative (2005), available at: www.lean.mit.edu.
    • (2005)
  • 32
    • 23744485581 scopus 로고    scopus 로고
    • A framework for benchmarking, classifying, and implementing best sustainment practices
    • Mathaisel, D.F.X., Cathcart, T. and Comm, C. (2004), “A framework for benchmarking, classifying, and implementing best sustainment practices”, Benchmarking: An International Journal, Vol. 11 No. 4, pp. 403-17.
    • (2004) Benchmarking: An International Journal , vol.11 , pp. 403-417
    • Mathaisel, D.F.X.1    Cathcart, T.2    Comm, C.3
  • 34
    • 0031649739 scopus 로고    scopus 로고
    • Tools for assessing the responsiveness of existing production operations
    • Manufacturing Automation & Control Group, Department of Engineering, University of Cambridge, Cambridge, MA, London, February.
    • Matson, J. and McFarlane, D. (1998), “Tools for assessing the responsiveness of existing production operations”, Proceedings of IEE Workshop, Responsiveness in Manufacturing, Manufacturing Automation & Control Group, Department of Engineering, University of Cambridge, Cambridge, MA, London, February.
    • (1998) Proceedings of IEE Workshop, Responsiveness in Manufacturing
    • Matson, J.1    McFarlane, D.2
  • 35
    • 0003449926 scopus 로고
    • Industrial Engineering and Management Press, Atlanta, GA.
    • Monden, Y. (1983), Toyota Production System, Industrial Engineering and Management Press, Atlanta, GA.
    • (1983) Toyota Production System
    • Monden, Y.1
  • 36
    • 3142735335 scopus 로고    scopus 로고
    • Design of cellular manufacturing systems for dynamic and uncertain production requirements with presence of routing flexibility
    • PhD dissertation, Industrial and Systems Engineering, Virginia Polytechnic Institute and State University, Blacksburg, VA, 1 September.
    • Mungwattana, A. (2000), “Design of cellular manufacturing systems for dynamic and uncertain production requirements with presence of routing flexibility”, PhD dissertation, Industrial and Systems Engineering, Virginia Polytechnic Institute and State University, Blacksburg, VA, 1 September.
    • (2000)
    • Mungwattana, A.1
  • 38
    • 27844541908 scopus 로고    scopus 로고
    • Transition-to-lean roadmap enterprise level, progress report
    • Lean Aerospace Initiative, Massachusetts Institute of Technology, Cambridge, MA, 12-13 July.
    • Nightingale, D. and Milauskas, R. (1999), “Transition-to-lean roadmap enterprise level, progress report”, Lean Aerospace Initiative, Massachusetts Institute of Technology, Cambridge, MA, 12-13 July.
    • (1999)
    • Nightingale, D.1    Milauskas, R.2
  • 40
    • 27844439161 scopus 로고    scopus 로고
    • How to use a design build approach for a construction project: a client guide
    • Chartered Institute of Building (CIOB) available at: www.ciob.org.uk.
    • Pearce, S. and Bennet, J. (2005), “How to use a design build approach for a construction project: a client guide”, Chartered Institute of Building (CIOB) available at: www.ciob.org.uk.
    • (2005)
    • Pearce, S.1    Bennet, J.2
  • 41
    • 24944526815 scopus 로고    scopus 로고
    • Building the lean machine
    • January, available at: www.advancedmanufacturing.com.
    • Phillips, T. (2000), “Building the lean machine”, Advanced Manufacturing, January, available at: www.advancedmanufacturing.com.
    • (2000) Advanced Manufacturing
    • Phillips, T.1
  • 42
    • 0008969197 scopus 로고
    • A Reference Model for Computer Integrated Manufacturing (CIM)
    • Purdue Research Foundation, PERA: Purdue Enterprise Reference Architecture, West Lafayette, IN, available at: www.pera.net.
    • Purdue University (1989), A Reference Model for Computer Integrated Manufacturing (CIM), Purdue Research Foundation, PERA: Purdue Enterprise Reference Architecture, West Lafayette, IN, available at: www.pera.net.
    • (1989)
  • 46
    • 27844488744 scopus 로고    scopus 로고
    • The missing link of lean success
    • Society of Automotive Engineers International.
    • Roper, W. (2005), “The missing link of lean success”, Society of Automotive Engineers International.
    • (2005)
    • Roper, W.1
  • 47
    • 27844503707 scopus 로고    scopus 로고
    • How to develop a successful approach to design/build construction
    • available at: www.ecmweb.com (accessed 1 April).
    • Rowe, L.E. (1998), “How to develop a successful approach to design/build construction”, available at: www.ecmweb.com (accessed 1 April).
    • (1998)
    • Rowe, L.E.1
  • 53
    • 84986127138 scopus 로고    scopus 로고
    • Advisory and assistance services for OC-ALC/MA-T depot maintenance transformation
    • Synergy, Inc., Burlington, MA, 14 May.
    • Synergy Inc. (2003a), “Advisory and assistance services for OC-ALC/MA-T depot maintenance transformation”, Technical Proposal, Synergy, Inc., Burlington, MA, 14 May.
    • (2003) Technical Proposal
  • 56
    • 0024731850 scopus 로고
    • Cellular manufacturing in the US industry: a survey of users
    • Wemmerlov, U. and Hyer, N. (1989), “Cellular manufacturing in the US industry: a survey of users”, International Journal of Production Research, Vol. 27 No. 9, pp. 1511-30.
    • (1989) International Journal of Production Research , vol.27 , pp. 1511-1530
    • Wemmerlov, U.1    Hyer, N.2
  • 57
    • 0030784413 scopus 로고    scopus 로고
    • Cellular manufacturing at 46 user plants: implementation experiences and performance improvements
    • Wemmerlov, U. and John, D. (1997), “Cellular manufacturing at 46 user plants: implementation experiences and performance improvements”, International Journal of Production Research, Vol. 35 No. 1, pp. 29-49.
    • (1997) International Journal of Production Research , vol.35 , pp. 29-49
    • Wemmerlov, U.1    John, D.2
  • 62
    • 1542388847 scopus 로고    scopus 로고
    • GERAM: generalised enterprise reference architecture and methodology
    • Version 1.6.2, June.
    • International Federation for Information Processing (IFIP) – the International Federation of Automatic Control (IFAC) Task Force (1998), “GERAM: generalised enterprise reference architecture and methodology”, Version 1.6.2, June.
    • (1998)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.