메뉴 건너뛰기




Volumn 19, Issue 5, 2012, Pages 543-556

Analysis of factors critical to construction project success in Malaysia

Author keywords

Construction industry; Critical success factors; Malaysia; Malaysian construction industry; Procurement; Project management

Indexed keywords

CONSTRUCTION PROJECTS; CORE ELEMENTS; CRITICAL ELEMENTS; CRITICAL SUCCESS FACTOR; DESIGN/METHODOLOGY/APPROACH; LITERATURE SEARCH; MALAYSIA; MALAYSIAN CONSTRUCTION INDUSTRY; PILOT SURVEYS; PRINCIPAL FACTORS; PROCUREMENT; PROCUREMENT METHODS; QUANTITY SURVEYING; QUESTIONNAIRE SURVEYS; STRONG CONSISTENCY;

EID: 84867264889     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/09699981211259612     Document Type: Article
Times cited : (120)

References (46)
  • 1
    • 0002855029 scopus 로고
    • Socio-cultural distance and the choice of joint ventures: A contingency perspective
    • Agarwal, S. Socio-cultural distance and the choice of joint ventures: a contingency perspective Journal of International Marketing 2 2 1994 63-80
    • (1994) Journal of International Marketing , vol.2 , Issue.2 , pp. 63-80
    • Agarwal, S.1
  • 2
    • 2242459831 scopus 로고    scopus 로고
    • Analysis of factors influencing project cost estimating practice
    • Akintoye, A. Analysis of factors influencing project cost estimating practice Construction Management and Economics 18 1 2000 77-89
    • (2000) Construction Management and Economics , vol.18 , Issue.1 , pp. 77-89
    • Akintoye, A.1
  • 3
    • 33847327339 scopus 로고    scopus 로고
    • The significant factors causing delay of building construction projects in Malaysia
    • DOI 10.1108/09699980710731308
    • Alaghbari, W., Kadir, M.R.A., Salim, A., Ernawati The significant factors causing delay of building construction projects in Malaysia Engineering, Construction and Architectural Management 14 2 2007 192-206 (Pubitemid 46326518)
    • (2007) Engineering, Construction and Architectural Management , vol.14 , Issue.2 , pp. 192-206
    • Alaghbari, W.1    Kadir, M.R.A.2    Salim, A.3
  • 5
    • 0032595622 scopus 로고    scopus 로고
    • Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria
    • Atkinson, R. Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria International Journal of Project Management 17 6 1999 337-42
    • (1999) International Journal of Project Management , vol.17 , Issue.6 , pp. 337-42
    • Atkinson, R.1
  • 8
    • 1342287952 scopus 로고    scopus 로고
    • Effective partnering tools in construction: A case study on MTRC TKE contract 604 in Hong Kong
    • DOI 10.1016/S0263-7863(03)00069-3
    • Bayliss, R., Cheung, S.O., Suen, H.C.H., Wong, S.P. Effective partnering tools in construction: a case study on MTRC TKE contract 604 in Hong Kong International Journal of Project Management 22 3 2004 253-63 (Pubitemid 38256942)
    • (2004) International Journal of Project Management , vol.22 , Issue.3 , pp. 253-263
    • Bayliss, R.1    Cheung, S.-O.2    Suen, H.C.H.3    Wong, S.-P.4
  • 9
    • 0030173778 scopus 로고    scopus 로고
    • A new framework for determining critical success/failure factors in projects
    • DOI 10.1016/0263-7863(95)00064-X
    • Belassi, W., Tukel, O.I. A new framework for determining critical success/failure factors in projects International Journal of Project Management 14 3 1996 141-51 (Pubitemid 126397312)
    • (1996) International Journal of Project Management , vol.14 , Issue.3 , pp. 141-151
    • Belassi, W.1    Tukel, O.I.2
  • 12
    • 0042155411 scopus 로고    scopus 로고
    • An empirical study of the benefits of construction partnering in Hong Kong
    • DOI 10.1080/0144619032000056162
    • Chan, A.P.C., Chan, D.W.M., Ho, K.S.K. An empirical study of the benefits of construction partnering in Hong Kong Construction Management and Economics 21 5 2003 523-33 (Pubitemid 36971546)
    • (2003) Construction Management and Economics , vol.21 , Issue.5 , pp. 523-533
    • Chan, A.P.C.1    Chan, D.W.M.2    Ho, K.S.K.3
  • 13
    • 0030287181 scopus 로고    scopus 로고
    • An evaluation of construction time performance in the building industry
    • DOI 10.1016/0360-1323(96)00031-5, PII S0360132396000315
    • Chan, D.W.M., Kumaraswamy, M.M. An evaluation of construction time performance in the building industry Building and Environment 31 6 1996 569-78 (Pubitemid 126382837)
    • (1996) Building and Environment , vol.31 , Issue.6 , pp. 569-578
    • Chan, D.W.M.1    Kumaraswamy, M.M.2
  • 15
    • 84867244699 scopus 로고    scopus 로고
    • CIDB Malaysia Construction Industry Development Board (CIDB) Kuala Lumpur
    • CIDB Malaysia Construction Industry Review 1980-2009 (Q1) Construction Industry Development Board (CIDB) Kuala Lumpur 2009
    • (2009) Construction Industry Review 1980-2009 (Q1)
  • 16
    • 84996495868 scopus 로고    scopus 로고
    • CIDB Malaysia Construction Industry Development Board (CIDB) Kuala Lumpur
    • CIDB Malaysia The 7th Malaysia Construction Sector Review Construction Industry Development Board (CIDB) Kuala Lumpur 2010
    • (2010) The 7th Malaysia Construction Sector Review
  • 18
    • 2342597189 scopus 로고    scopus 로고
    • Methodological issues in international entrepreneurship research
    • DOI 10.1016/j.jbusvent.2003.06.001, PII S0883902603000910
    • Coviello, N.E., Jones, M.V. Methodological issues in international entrepreneurship research Journal of Business Venturing 19 4 2004 485-508 (Pubitemid 38570621)
    • (2004) Journal of Business Venturing , vol.19 , Issue.4 , pp. 485-508
    • Coviello, N.E.1    Jones, M.V.2
  • 19
    • 33749569777 scopus 로고
    • Measurement of project success
    • de Wit A.
    • de Wit, A. Measurement of project success International Journal of Project Management 6 3 1988 164-70
    • (1988) International Journal of Project Management , vol.6 , Issue.3 , pp. 164-70
  • 20
    • 0037647481 scopus 로고    scopus 로고
    • Organizational motivation and inter-organizational interaction in construction innovation in Singapore
    • DOI 10.1080/0144619032000056144
    • Dulaimi, M.F., Ling, F.Y.Y., Bajracharya, A. Organizatioanal motivation and inter-organizational interaction in construction innovation in Singapore Construction Management and Economics 21 3 2003 307-18 (Pubitemid 36650334)
    • (2003) Construction Management and Economics , vol.21 , Issue.3 , pp. 307-318
    • Dulaimi, M.F.1    Ling, F.Y.Y.2    Bajracharya, A.3
  • 22
    • 34047109290 scopus 로고    scopus 로고
    • Procurement and governance management - development of a conceptual procurement model based on different types of control
    • Eriksson, P.E. Procurement and governance management - development of a conceptual procurement model based on different types of control The International Review of Management Studies 17 1 2006 30-49
    • (2006) The International Review of Management Studies , vol.17 , Issue.1 , pp. 30-49
    • Eriksson, P.E.1
  • 24
    • 0010273406 scopus 로고    scopus 로고
    • Project evaluation scheme: A tool for evaluating project status and predicting project results
    • Erling, S.A., Svein Arne, J. Project evaluation scheme: a tool for evaluating project status and predicting project results Project Management Journal 6 1 2000 61-9
    • (2000) Project Management Journal , vol.6 , Issue.1 , pp. 61-9
    • Erling, S.A.1    Svein Arne, J.2
  • 25
    • 14744288445 scopus 로고    scopus 로고
    • Conflicts between owner and contractors: Proposed intervention process
    • DOI 10.1061/(ASCE)0742-597X(2003)19:3(121)
    • Harmon, K. Conflicts between owner and contractors: proposed intervention process J. Manage. Eng 19 3 2003 121-5 (Pubitemid 40329321)
    • (2003) Journal of Management in Engineering , vol.19 , Issue.3 , pp. 121-125
    • Harmon, K.M.J.1
  • 30
    • 0000611906 scopus 로고    scopus 로고
    • Selecting a suitable procurement method for a building project
    • Love, P.E.D., Skitmore, M., Earl, G. Selecting a suitable procurement method for a building project Construction Management and Economics 16 2 1998 221-33 (Pubitemid 128650964)
    • (1998) Construction Management and Economics , vol.16 , Issue.2 , pp. 221-233
    • Love, P.E.D.1    Skitmore, M.2    Earl, G.3
  • 32
    • 0037210847 scopus 로고    scopus 로고
    • An overview into the concept of partnering
    • DOI 10.1016/S0263-7863(01)00059-X, PII S026378630100059X
    • Naoum, S. An overview into the concept of partnering International Journal of Project Management 21 1 2003 71-6 (Pubitemid 35391750)
    • (2003) International Journal of Project Management , vol.21 , Issue.1 , pp. 71-76
    • Naoum, S.1
  • 33
    • 0036744541 scopus 로고    scopus 로고
    • A theoretical framework for determining the minimum number of bidders in construction bidding competitions
    • Ngai, S.C., Drew, D.S., Lo, H.P., Skitmore, M. A theoretical framework for determining the minimum number of bidders in construction bidding competitions Construction Management and Economics 20 6 2002 473-82
    • (2002) Construction Management and Economics , vol.20 , Issue.6 , pp. 473-82
    • Ngai, S.C.1    Drew, D.S.2    Lo, H.P.3    Skitmore, M.4
  • 35
    • 0036132474 scopus 로고    scopus 로고
    • Causes of construction delay: Traditional contracts
    • DOI 10.1016/S0263-7863(00)00037-5, PII S0263786300000375
    • Odeh, A.M., Battaineh, H.T. Causes of construction delay: traditional contracts International Journal of Project Management 20 1 2002 67-73 (Pubitemid 33102306)
    • (2002) International Journal of Project Management , vol.20 , Issue.1 , pp. 67-73
    • Odeh, A.M.1    Battaineh, H.T.2
  • 36
    • 0027623833 scopus 로고
    • Checklist of critical success factors for building projects
    • Parfitt, M., Sanvido, V. Checklist of critical success factors for building projects J. Manage. Eng 9 3 1993 243-9
    • (1993) J. Manage. Eng , vol.9 , Issue.3 , pp. 243-9
    • Parfitt, M.1    Sanvido, V.2
  • 37
    • 0006822095 scopus 로고
    • The changing role of the information systems executive: A critical success factors perspective
    • Rockart, J.F. The changing role of the information systems executive: a critical success factors perspective Sloan Management Review 24 1 1982 3-13
    • (1982) Sloan Management Review , vol.24 , Issue.1 , pp. 3-13
    • Rockart, J.F.1
  • 38
    • 0011571031 scopus 로고
    • Sloan School of Management, MIT Cambridge, MA Working Paper No. 69, Center for Information Systems Research
    • Rockart, J.F., Bullen, C.V. A primer on critical success factors Sloan School of Management, MIT Cambridge, MA 1981 Working Paper No. 69, Center for Information Systems Research
    • (1981) A primer on critical success factors
    • Rockart, J.F.1    Bullen, C.V.2
  • 39
    • 34248402903 scopus 로고    scopus 로고
    • Causes and effects of delays in Malaysian construction industry
    • DOI 10.1016/j.ijproman.2006.11.007, PII S0263786306001700
    • Sambasivan, M., Soon, Y.W. Causes and effects of delays in Malaysian construction industry International Journal of Project Management 25 5 2007 517-26 (Pubitemid 46731273)
    • (2007) International Journal of Project Management , vol.25 , Issue.5 , pp. 517-526
    • Sambasivan, M.1    Soon, Y.W.2
  • 41
    • 84861074881 scopus 로고    scopus 로고
    • Analysis of measures of construction project success in Malaysia
    • Association of Researchers in Construction Management, Edinburgh 1-3 September
    • Takim, R., Akintoye, A., Kelly, J. Analysis of measures of construction project success in Malaysia 2004 1123-33 Proceedings of the 20th Annual ARCOM Conference in Heriot Watt University, Association of Researchers in Construction Management, Edinburgh, Vol. 2, 1-3 September
    • (2004) Proceedings of the 20th Annual ARCOM Conference in Heriot Watt University , vol.2 , pp. 1123-33
    • Takim, R.1    Akintoye, A.2    Kelly, J.3
  • 42
    • 0026883757 scopus 로고
    • Critical success factors in winning BOT contracts
    • Tiong, R. Critical success factors in winning BOT contracts J. Constr. Eng. Manage 118 2 1992 217-28
    • (1992) J. Constr. Eng. Manage , vol.118 , Issue.2 , pp. 217-28
    • Tiong, R.1
  • 43
    • 84992948135 scopus 로고    scopus 로고
    • Construction professionals' perception of critical success factors for large-scale construction projects
    • Toor, S.R., Ogunlana, S.O. Construction professionals' perception of critical success factors for large-scale construction projects Construction Innovation: Information, Process, Management 9 2 2009 149-67
    • (2009) Construction Innovation: Information, Process, Management , vol.9 , Issue.2 , pp. 149-67
    • Toor, S.R.1    Ogunlana, S.O.2
  • 45
    • 0000331042 scopus 로고
    • An investigation into construction time performance
    • Walker, D.H.T. An investigation into construction time performance Construction Management and Economics 13 3 1995 263-74
    • (1995) Construction Management and Economics , vol.13 , Issue.3 , pp. 263-74
    • Walker, D.H.T.1
  • 46
    • 0010940888 scopus 로고
    • Contracting systems in the European construction industry: A sectoral approach to the dynamics of business systems
    • Whitley, R., Kristensen, P.H. Routledge London
    • Winch, G. Whitley, R., Kristensen, P.H. Contracting systems in the European construction industry: a sectoral approach to the dynamics of business systems The Changing European Firm: Limits to Convergence Routledge London 1995 241-70
    • (1995) The Changing European Firm: Limits to Convergence , pp. 241-70
    • Winch, G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.