메뉴 건너뛰기




Volumn 64, Issue 2, 2012, Pages 1707-1716

Hazard management and risk design by optimal statistical analysis

Author keywords

Computer aided; Financial insurance; Risk hazard assessment

Indexed keywords

COMPUTER AIDED DESIGN; DECISION MAKING; HAZARD MANAGEMENT; INSURANCE SYSTEM; REGRESSION ANALYSIS; RISK ASSESSMENT; STATISTICAL ANALYSIS;

EID: 84867234477     PISSN: 0921030X     EISSN: None     Source Type: Journal    
DOI: 10.1007/s11069-012-0329-8     Document Type: Article
Times cited : (20)

References (36)
  • 1
    • 0032678159 scopus 로고    scopus 로고
    • Developing utility functions for environmental decision-making
    • Accorsi R, Zio E, Apostolakis GE (1999) Developing utility functions for environmental decision-making. Prog Nucl Energy 34(4): 387-411.
    • (1999) Prog Nucl Energy , vol.34 , Issue.4 , pp. 387-411
    • Accorsi, R.1    Zio, E.2    Apostolakis, G.E.3
  • 2
    • 3142763958 scopus 로고    scopus 로고
    • Stability analysis of T-S fuzzy models for nonlinear multiple time-delay interconnected systems
    • Chen CW (2004) Stability analysis of T-S fuzzy models for nonlinear multiple time-delay interconnected systems. Mathematics and Computers in Simulation 66: 523-537.
    • (2004) Mathematics and Computers In Simulation , vol.66 , pp. 523-537
    • Chen, C.W.1
  • 3
    • 33746239122 scopus 로고    scopus 로고
    • Stability conditions of fuzzy systems and its application to structural and mechanical systems
    • Chen CW (2006) Stability conditions of fuzzy systems and its application to structural and mechanical systems. Advances in Engineering Software 37: 624-629.
    • (2006) Advances In Engineering Software , vol.37 , pp. 624-629
    • Chen, C.W.1
  • 4
    • 74249095245 scopus 로고    scopus 로고
    • Fuzzy control for an oceanic structure: A case study in time-delay TLP system
    • Chen CY (2010) Fuzzy control for an oceanic structure: A case study in time-delay TLP system. Journal of Vibration and Control 16: 147-160.
    • (2010) Journal of Vibration and Control , vol.16 , pp. 147-160
    • Chen, C.Y.1
  • 5
    • 84862777408 scopus 로고    scopus 로고
    • Assessment of the major hazard potential of interfacial solitary waves moving over a trapezoidal obstacle on a horizontal plateau
    • Chen CY (2012a) Assessment of the major hazard potential of interfacial solitary waves moving over a trapezoidal obstacle on a horizontal plateau. Natural Hazards, 62(3): 841-852.
    • (2012) Natural Hazards , vol.62 , Issue.3 , pp. 841-852
    • Chen, C.Y.1
  • 6
    • 84862823468 scopus 로고    scopus 로고
    • Disaster prevention and reduction for exploring teachers' technology acceptance using a virtual reality system and partial least squares techniques
    • Chen CY (2012b) Disaster prevention and reduction for exploring teachers' technology acceptance using a virtual reality system and partial least squares techniques. Natural Hazards 62(3): 1217-1231.
    • (2012) Natural Hazards , vol.62 , Issue.3 , pp. 1217-1231
    • Chen, C.Y.1
  • 7
    • 71749095343 scopus 로고    scopus 로고
    • Application of data mining to the spatial heterogeneity of foreclosed mortgages
    • Chen TH, Chen CW (2010) Application of data mining to the spatial heterogeneity of foreclosed mortgages. Expert Syst Appl 37(2): 993-997.
    • (2010) Expert Syst Appl , vol.37 , Issue.2 , pp. 993-997
    • Chen, T.H.1    Chen, C.W.2
  • 8
    • 78049467029 scopus 로고    scopus 로고
    • A web-based multi-perspective decision support system for information security planning
    • El-Gayar OF, Fritz BD (2010) A web-based multi-perspective decision support system for information security planning. Decis Support Syst 50: 43-54.
    • (2010) Decis Support Syst , vol.50 , pp. 43-54
    • El-Gayar, O.F.1    Fritz, B.D.2
  • 9
    • 33644985214 scopus 로고    scopus 로고
    • Innovation risks of strategic outsourcing
    • Hoecht A, Trott P (2006) Innovation risks of strategic outsourcing. Technovation 26: 672-681.
    • (2006) Technovation , vol.26 , pp. 672-681
    • Hoecht, A.1    Trott, P.2
  • 11
    • 14744268610 scopus 로고    scopus 로고
    • Robust stabilization of nonlinear multiple time-delay large-scale systems via decentralized fuzzy control
    • Hsiao FH, Hwang, JD, Chen CW and Tsai ZR (2005b) Robust stabilization of nonlinear multiple time-delay large-scale systems via decentralized fuzzy control. IEEE Trans Fuzzy Syst 13: 152-163.
    • (2005) IEEE Trans Fuzzy Syst , vol.13 , pp. 152-163
    • Hsiao, F.H.1    Hwang, J.D.2    Chen, C.W.3    Tsai, Z.R.4
  • 12
    • 79961023019 scopus 로고    scopus 로고
    • An integrated flood risk assessment model for property insurance industry in Taiwan
    • Hsu WK (2011) An integrated flood risk assessment model for property insurance industry in Taiwan. Nat Hazards 58(3): 1295-1309.
    • (2011) Nat Hazards , vol.58 , Issue.3 , pp. 1295-1309
    • Hsu, W.K.1
  • 13
    • 84862804622 scopus 로고    scopus 로고
    • Risk and uncertainty analysis in the planning stages of a risk decision-making process
    • Hsu WK (2012) Risk and uncertainty analysis in the planning stages of a risk decision-making process. Nat Hazards 61(3): 1355-1365.
    • (2012) Nat Hazards , vol.61 , Issue.3 , pp. 1355-1365
    • Hsu, W.K.1
  • 14
    • 33644985951 scopus 로고    scopus 로고
    • Prevention and management of product recalls in the processed food industry: a case study based on an exporter's perspective
    • Kumar S, Budin EM (2006) Prevention and management of product recalls in the processed food industry: a case study based on an exporter's perspective. Technovation 26: 739-750.
    • (2006) Technovation , vol.26 , pp. 739-750
    • Kumar, S.1    Budin, E.M.2
  • 15
    • 71649097609 scopus 로고    scopus 로고
    • Towards a multi-dimensional project performance measurement system
    • Lauras M, Marques G, Gourc D (2010) Towards a multi-dimensional project performance measurement system. Decis Support Syst 48: 342-353.
    • (2010) Decis Support Syst , vol.48 , pp. 342-353
    • Lauras, M.1    Marques, G.2    Gourc, D.3
  • 16
    • 84855317872 scopus 로고    scopus 로고
    • Kalman filter decision systems for debris flow hazard assessment
    • Lin JW (2012a) Kalman filter decision systems for debris flow hazard assessment. Nat Hazards 60(3): 1255-1266.
    • (2012) Nat Hazards , vol.60 , Issue.3 , pp. 1255-1266
    • Lin, J.W.1
  • 17
    • 84858799303 scopus 로고    scopus 로고
    • Modeling and assessment of bridge structure for seismic hazard prevention
    • Lin JW (2012b) Modeling and assessment of bridge structure for seismic hazard prevention. Nat Hazards 61(3): 1115-1126.
    • (2012) Nat Hazards , vol.61 , Issue.3 , pp. 1115-1126
    • Lin, J.W.1
  • 18
    • 84866032661 scopus 로고    scopus 로고
    • Potential hazard analysis and risk assessment of debris flow by fuzzy modeling
    • doi: 10. 1007/s11069-012-0236-z
    • Lin JW (2012c) Potential hazard analysis and risk assessment of debris flow by fuzzy modeling. Nat Hazards. doi: 10. 1007/s11069-012-0236-z.
    • (2012) Nat Hazards
    • Lin, J.W.1
  • 19
    • 79251476511 scopus 로고    scopus 로고
    • Using GIS-based spatial geocomputation from remotely sensed data for drought risk-sensitive assessment
    • Lin ML (2011) Using GIS-based spatial geocomputation from remotely sensed data for drought risk-sensitive assessment. International Journal of Innovative Computing, Information and Control 7(2): 657-668.
    • (2011) International Journal of Innovative Computing, Information and Control , vol.7 , Issue.2 , pp. 657-668
    • Lin, M.L.1
  • 20
    • 84855317872 scopus 로고    scopus 로고
    • Kalman filter decision systems for debris flow hazard assessment
    • Lin JW, Chen CW, Peng CY (2012) Kalman filter decision systems for debris flow hazard assessment. Nat Hazards 60(3): 1255-1266.
    • (2012) Nat Hazards , vol.60 , Issue.3 , pp. 1255-1266
    • Lin, J.W.1    Chen, C.W.2    Peng, C.Y.3
  • 21
    • 33745303864 scopus 로고    scopus 로고
    • Critical success factors in agile natural disaster risk management: an empirical study
    • Power DJ, Sohal AS, Rahman S (2001) Critical success factors in agile natural disaster risk management: an empirical study. Int J Phys Distrib Logist 31(4): 247-265.
    • (2001) Int J Phys Distrib Logist , vol.31 , Issue.4 , pp. 247-265
    • Power, D.J.1    Sohal, A.S.2    Rahman, S.3
  • 22
    • 0035632096 scopus 로고    scopus 로고
    • International natural disaster risk control tradeoffs between flexibility and uncertainty
    • Prater E, Biehl M, Smith MA (2001) International natural disaster risk control tradeoffs between flexibility and uncertainty. Int J Oper Prod Manag 21(5/6): 823-839.
    • (2001) Int J Oper Prod Manag , vol.21 , Issue.5-6 , pp. 823-839
    • Prater, E.1    Biehl, M.2    Smith, M.A.3
  • 23
    • 0002290231 scopus 로고
    • The design of an optimal insurance policy
    • Raviv A (1979) The design of an optimal insurance policy. Am Econ Rev 69: 84-96.
    • (1979) Am Econ Rev , vol.69 , pp. 84-96
    • Raviv, A.1
  • 24
    • 84866034809 scopus 로고    scopus 로고
    • Using Lego NXT to explore scientific literacy in disaster prevention and rescue systems
    • doi: 10. 1007/s11069-012-0233-2
    • Shih BY (2012) Using Lego NXT to explore scientific literacy in disaster prevention and rescue systems. Nat Hazards. doi: 10. 1007/s11069-012-0233-2.
    • (2012) Nat Hazards
    • Shih, B.Y.1
  • 25
    • 77249087598 scopus 로고    scopus 로고
    • An earthquake disaster management mechanism based on risk assessment information for the tourism industry-a case study from the island of Taiwan
    • Tsai CH (2010) An earthquake disaster management mechanism based on risk assessment information for the tourism industry-a case study from the island of Taiwan. Tour Manag 31(4): 470-481.
    • (2010) Tour Manag , vol.31 , Issue.4 , pp. 470-481
    • Tsai, C.H.1
  • 26
    • 80052987350 scopus 로고    scopus 로고
    • Development of a mechanism for typhoon and flood risk assessment and disaster management in the hotel industry-a case study of the Hualien area
    • Tsai CH (2011a) Development of a mechanism for typhoon and flood risk assessment and disaster management in the hotel industry-a case study of the Hualien area. Scandinavian J Hosp Tour 11(3): 324-341.
    • (2011) Scandinavian J Hosp Tour , vol.11 , Issue.3 , pp. 324-341
    • Tsai, C.H.1
  • 27
    • 78649836382 scopus 로고    scopus 로고
    • The establishment of a rapid natural disaster risk assessment model for the tourism industry
    • Tsai CH (2011b) The establishment of a rapid natural disaster risk assessment model for the tourism industry. Tour Manag 32(1): 158-171.
    • (2011) Tour Manag , vol.32 , Issue.1 , pp. 158-171
    • Tsai, C.H.1
  • 28
    • 80255131305 scopus 로고    scopus 로고
    • A new viewpoint on risk control decision models for natural disasters
    • Tseng CP (2011) A new viewpoint on risk control decision models for natural disasters. Nat Hazards 59(3): 1715-1733.
    • (2011) Nat Hazards , vol.59 , Issue.3 , pp. 1715-1733
    • Tseng, C.P.1
  • 29
    • 84864414817 scopus 로고    scopus 로고
    • Default risk-based probabilistic decision model for risk management and control
    • doi: 10. 1007/s11069-012-0183-8
    • Tseng CP (2012) Default risk-based probabilistic decision model for risk management and control. Nat Hazards. doi: 10. 1007/s11069-012-0183-8.
    • (2012) Nat Hazards
    • Tseng, C.P.1
  • 30
    • 84855320262 scopus 로고    scopus 로고
    • Natural disaster management mechanisms for probabilistic earthquake loss
    • Tseng CP, Chen CW (2012) Natural disaster management mechanisms for probabilistic earthquake loss. Nat Hazards 60(3): 1055-1063.
    • (2012) Nat Hazards , vol.60 , Issue.3 , pp. 1055-1063
    • Tseng, C.P.1    Chen, C.W.2
  • 31
    • 79960100051 scopus 로고    scopus 로고
    • Risk control allocation model for pressure vessels and piping project
    • Tseng CP, Chen CW and Liu FR (2012) Risk control allocation model for pressure vessels and piping project. J Vib Control 18(3): 385-394.
    • (2012) J Vib Control , vol.18 , Issue.3 , pp. 385-394
    • Tseng, C.P.1    Chen, C.W.2    Liu, F.R.3
  • 32
    • 77957331019 scopus 로고    scopus 로고
    • A performance-oriented risk management framework for innovative R&D projects
    • Wang JT, Lin W, Huang YH (2010) A performance-oriented risk management framework for innovative R& D projects. Technovation 30: 601-611.
    • (2010) Technovation , vol.30 , pp. 601-611
    • Wang, J.T.1    Lin, W.2    Huang, Y.H.3
  • 33
    • 84863012855 scopus 로고    scopus 로고
    • Potential hazard analysis from the viewpoint of flow measurement in large open-channel junctions
    • Yang HC (2012) Potential hazard analysis from the viewpoint of flow measurement in large open-channel junctions. Nat Hazards 61(2): 803-813.
    • (2012) Nat Hazards , vol.61 , Issue.2 , pp. 803-813
    • Yang, H.C.1
  • 34
    • 78049326381 scopus 로고    scopus 로고
    • GIS-based distributed technique for assessing economic loss from flood damage: Pre-feasibility study for the Anyang Stream Basin in Korea
    • Yi CS, Lee JH, Shim MP (2010) GIS-based distributed technique for assessing economic loss from flood damage: pre-feasibility study for the Anyang Stream Basin in Korea. Nat Hazards 55(2): 251-272.
    • (2010) Nat Hazards , vol.55 , Issue.2 , pp. 251-272
    • Yi, C.S.1    Lee, J.H.2    Shim, M.P.3
  • 35
    • 3042734982 scopus 로고    scopus 로고
    • Agile natural disaster risk capabilities: determinants of competitive objectives
    • Yusuf YY, Gunasekaran A, Adeleye EO, Sivayoganathan K (2004) Agile natural disaster risk capabilities: determinants of competitive objectives. Eur J Oper Res 159: 379-392.
    • (2004) Eur J Oper Res , vol.159 , pp. 379-392
    • Yusuf, Y.Y.1    Gunasekaran, A.2    Adeleye, E.O.3    Sivayoganathan, K.4
  • 36
    • 77649235663 scopus 로고    scopus 로고
    • Resilience to natural hazards: a geographic perspective
    • Zhou HJ, Wang JA, Wan JH et al (2010) Resilience to natural hazards: a geographic perspective. Nat Hazards 53(1): 21-41.
    • (2010) Nat Hazards , vol.53 , Issue.1 , pp. 21-41
    • Zhou, H.J.1    Wang, J.A.2    Wan, J.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.