-
1
-
-
85043064303
-
Report to Institute for Water Resources
-
US Army Corps of Engineers and Australian National Committee on Large Dams, Institute for Dam Safety Risk Management, Utah State University, Logan, Utah, USA
-
Aboelata MA, Bowles DS (2005) LIFESim: A model for estimating dam failure life loss. Report to Institute for Water Resources, US Army Corps of Engineers and Australian National Committee on Large Dams, Institute for Dam Safety Risk Management, Utah State University, Logan, Utah, USA.
-
(2005)
LIFESim: A Model For Estimating Dam Failure Life Loss
-
-
Aboelata, M.A.1
Bowles, D.S.2
-
3
-
-
0024717942
-
Human stability in a high flood hazard zone
-
Abt SR, Wittler RJ, Taylor A, Love DJ (1989) Human stability in a high flood hazard zone. Water Resour Bull 25(4): 881-890.
-
(1989)
Water Resour Bull
, vol.25
, Issue.4
, pp. 881-890
-
-
Abt, S.R.1
Wittler, R.J.2
Taylor, A.3
Love, D.J.4
-
5
-
-
84855959080
-
Earthen embankment breaching
-
ASCE/EWRI Task Committee on Dam/Levee Breaching
-
ASCE/EWRI Task Committee on Dam/Levee Breaching (2011) Earthen embankment breaching. J Hydraul Eng ASCE 137(12): 1549-1564.
-
(2011)
J Hydraul Eng ASCE
, vol.137
, Issue.12
, pp. 1549-1564
-
-
-
6
-
-
0024127704
-
Assessing the threat to life from dam failure
-
Brown CA, Graham WJ (1988) Assessing the threat to life from dam failure. Water Resour Bull 24(6): 1303-1309.
-
(1988)
Water Resour Bull
, vol.24
, Issue.6
, pp. 1303-1309
-
-
Brown, C.A.1
Graham, W.J.2
-
7
-
-
77952003176
-
Simulation of the erosion process of landslide dams due to overtopping considering variations in soil erodibility along depth
-
Chang DS, Zhang LM (2010) Simulation of the erosion process of landslide dams due to overtopping considering variations in soil erodibility along depth. Nat Hazards Earth Syst Sci 10(4): 933-946.
-
(2010)
Nat Hazards Earth Syst Sci
, vol.10
, Issue.4
, pp. 933-946
-
-
Chang, D.S.1
Zhang, L.M.2
-
8
-
-
80052270053
-
Field testing of erodibility of two landslide dams triggered by the 12 May Wenchuan earthquake
-
Chang DS, Zhang LM, Xu Y, Huang RQ (2011) Field testing of erodibility of two landslide dams triggered by the 12 May Wenchuan earthquake. Landslides 8(3): 321-332.
-
(2011)
Landslides
, vol.8
, Issue.3
, pp. 321-332
-
-
Chang, D.S.1
Zhang, L.M.2
Xu, Y.3
Huang, R.Q.4
-
10
-
-
70349504172
-
The 12 May Wenchuan earthquake-induced landslide lakes: distribution and preliminary risk evaluation
-
Cui P, Zhu YY, Han YS, Chen XQ, Zhuang JQ (2009) The 12 May Wenchuan earthquake-induced landslide lakes: distribution and preliminary risk evaluation. Landslides 6(3): 209-223.
-
(2009)
Landslides
, vol.6
, Issue.3
, pp. 209-223
-
-
Cui, P.1
Zhu, Y.Y.2
Han, Y.S.3
Chen, X.Q.4
Zhuang, J.Q.5
-
11
-
-
0027154064
-
Predicting loss of life in cases of dam failure and flash flood
-
DeKay ML, McClelland GH (1993) Predicting loss of life in cases of dam failure and flash flood. Risk Anal 13(2): 193-205.
-
(1993)
Risk Anal
, vol.13
, Issue.2
, pp. 193-205
-
-
DeKay, M.L.1
McClelland, G.H.2
-
12
-
-
85009263336
-
-
Google Map (2008) http://ditu.google.cn/.
-
(2008)
Google Map
-
-
-
13
-
-
0007265758
-
A procedure for estimating loss of life caused by dam failure. U. S. Bureau of Reclamation, Dam Safety Office, Denver, USA, Report no
-
Graham WJ (1999) A procedure for estimating loss of life caused by dam failure. U. S. Bureau of Reclamation, Dam Safety Office, Denver, USA, Report no. DSO-99-06.
-
(1999)
DSO-99-06
-
-
Graham, W.J.1
-
14
-
-
60149103508
-
Analysis of blocking river mechanism of Tangjiashan landslide and dam-breaking mode of its barrier dam
-
(in Chinese)
-
Hu XW, Huang RQ, Shi YB, Lu XP, Zhu HY, Wang XR (2009) Analysis of blocking river mechanism of Tangjiashan landslide and dam-breaking mode of its barrier dam. Chin J Rock Mech Eng 28(1): 181-189 (in Chinese).
-
(2009)
Chin J Rock Mech Eng
, vol.28
, Issue.1
, pp. 181-189
-
-
Hu, X.W.1
Huang, R.Q.2
Shi, Y.B.3
Lu, X.P.4
Zhu, H.Y.5
Wang, X.R.6
-
15
-
-
0013364804
-
-
Hydrologic Engineering Center (HEC), version 4. 0, developed by Hydrologic Engineering Center of US Army Corps of Engineers, Washington
-
Hydrologic Engineering Center (HEC) (2008) HEC-RAS, river analysis system, hydraulic reference manual, version 4. 0, developed by Hydrologic Engineering Center of US Army Corps of Engineers, Washington.
-
(2008)
HEC-RAS, River Analysis System, Hydraulic Reference Manual
-
-
-
18
-
-
48449101803
-
Architecture, modelling framework and validation of BC hydro's virtual reality life safety model
-
In: Vrijling et al., 23-24 May 2005, Nijmegen, the Netherlands
-
Johnstone WM, Sakamoto D, Assaf H, Bourban S (2005) Architecture, modelling framework and validation of BC hydro's virtual reality life safety model. In: Vrijling et al. (eds) Proceedings of the international symposium on stochastic hydraulics, 23-24 May 2005, Nijmegen, the Netherlands.
-
(2005)
Proceedings of the International Symposium On Stochastic Hydraulics
-
-
Johnstone, W.M.1
Sakamoto, D.2
Assaf, H.3
Bourban, S.4
-
21
-
-
48449087845
-
Methods for the estimation of loss of life due to floods: a literature review and proposal for a new method
-
Jonkman SN, Vrijling JK, Vrouwenvelder ACWM (2008) Methods for the estimation of loss of life due to floods: a literature review and proposal for a new method. Nat Hazards 46(3): 353-389.
-
(2008)
Nat Hazards
, vol.46
, Issue.3
, pp. 353-389
-
-
Jonkman, S.N.1
Vrijling, J.K.2
Vrouwenvelder, A.C.W.M.3
-
22
-
-
63849221512
-
Loss of life caused by the flooding of New Orleans after hurricane Katrina: analysis of the relationship between flood characteristics and mortality
-
Jonkman SN, Maaskant B, Boyd E, Levitan ML (2009) Loss of life caused by the flooding of New Orleans after hurricane Katrina: analysis of the relationship between flood characteristics and mortality. Risk Anal 29(5): 676-698.
-
(2009)
Risk Anal
, vol.29
, Issue.5
, pp. 676-698
-
-
Jonkman, S.N.1
Maaskant, B.2
Boyd, E.3
Levitan, M.L.4
-
23
-
-
0242377100
-
-
Oak Ridge National Laboratory Draft Report. Prepared for the Institute for Water Resources, U. S. Army Corps of Engineers, Washington
-
Lee R, Hu PS, Neal D, Ogles MR, Sorensen JH, Trumble DA (1986) Predicting loss of life from floods. Oak Ridge National Laboratory Draft Report. Prepared for the Institute for Water Resources, U. S. Army Corps of Engineers, Washington.
-
(1986)
Predicting Loss of Life From Floods
-
-
Lee, R.1
Hu, P.S.2
Neal, D.3
Ogles, M.R.4
Sorensen, J.H.5
Trumble, D.A.6
-
25
-
-
85043045833
-
-
Chinese Academy of Sciences, 25 July 2008, Chengdu, China (in Chinese)
-
Liu N (2008b) Landslide dams in Wenchuan earthquake and risk mitigation measures. Keynote lecture, forum on earthquake relief vs. science and technology, Chinese Academy of Sciences, 25 July 2008, Chengdu, China (in Chinese).
-
(2008)
Landslide Dams In Wenchuan Earthquake and Risk Mitigation Measures. Keynote Lecture, Forum On Earthquake Relief Vs. Science and Technology
-
-
Liu, N.1
-
27
-
-
63349097862
-
Draining Tangjiashan barrier lake after Wenchuan earthquake and the flood propagation after the dam break
-
Liu N, Zhang JX, Lin W, Cheng WY, Chen ZY (2009) Draining Tangjiashan barrier lake after Wenchuan earthquake and the flood propagation after the dam break. Sci China Ser E Technol Sci 52(4): 901-908.
-
(2009)
Sci China Ser E Technol Sci
, vol.52
, Issue.4
, pp. 901-908
-
-
Liu, N.1
Zhang, J.X.2
Lin, W.3
Cheng, W.Y.4
Chen, Z.Y.5
-
28
-
-
77957967773
-
Draining the Tangjiashan barrier lake
-
Liu N, Chen ZY, Zhang JX, Lin W, Chen WY, Xu Wj (2010) Draining the Tangjiashan barrier lake. J Hydraul Eng 136(11): 914-923.
-
(2010)
J Hydraul Eng
, vol.136
, Issue.11
, pp. 914-923
-
-
Liu, N.1
Chen, Z.Y.2
Zhang, J.X.3
Lin, W.4
Chen, W.Y.5
Xu, W.6
-
29
-
-
84867229675
-
-
Ph. D. thesis, The Hong Kong University of Science and Technology, Hong Kong
-
Peng M (2012) Dam risk analysis and dynamic decision making. Ph. D. thesis, The Hong Kong University of Science and Technology, Hong Kong.
-
(2012)
Dam Risk Analysis and Dynamic Decision Making
-
-
Peng, M.1
-
30
-
-
80051903912
-
-
Geotechnical special publication, ASCE, Reston, Virginia, USA
-
Peng M, Zhang LM (2011) Breaching of Changkai Levee in June 2010 in Jiangxi Province, China. Geotechnical special publication (224), ASCE, Reston, Virginia, USA, pp 476-483.
-
(2011)
Breaching of Changkai Levee In June 2010 In Jiangxi Province, China
, Issue.224
, pp. 476-483
-
-
Peng, M.1
Zhang, L.M.2
-
31
-
-
84858709182
-
Breaching parameters of landslide dams
-
Peng M, Zhang LM (2012a) Breaching parameters of landslide dams. Landslides 9(1): 13-31.
-
(2012)
Landslides
, vol.9
, Issue.1
, pp. 13-31
-
-
Peng, M.1
Zhang, L.M.2
-
32
-
-
84866037328
-
Analysis of human risks due to dam break floods-part 1: A new model based on Bayesian networks
-
doi: 10. 1007/s11069-012-0275-5
-
Peng M, Zhang LM (2012b) Analysis of human risks due to dam break floods-part 1: a new model based on Bayesian networks. Nat Hazards. doi: 10. 1007/s11069-012-0275-5.
-
(2012)
Nat Hazards
-
-
Peng, M.1
Zhang, L.M.2
-
33
-
-
79959587335
-
-
Geotechnical Special Publication (199), ASCE, Reston, Virginia, USA
-
Peng M, Zhang LM, Huang RQ (2009) Risk analysis of Tangjiashan landslide dam. Geotechnical Special Publication (199), ASCE, Reston, Virginia, USA, pp 2192-2201.
-
(2009)
Risk Analysis of Tangjiashan Landslide Dam
, pp. 2192-2201
-
-
Peng, M.1
Zhang, L.M.2
Huang, R.Q.3
-
34
-
-
85043062943
-
Building a model to estimate risk to life for European flood events-final report
-
Priest S, Wilson T, Tapsell S, Penning-Rowsell E, Viavattene C, Fernandez-Bilbao A (2007) Building a model to estimate risk to life for European flood events-final report. Integrated Flood Risk Analysis and Management Methodologies, FLOODsite, http://www.floodsite.net/html/partner_area/search_results3b.asp?docID=265.
-
(2007)
Integrated Flood Risk Analysis and Management Methodologies, FLOODsite
-
-
Priest, S.1
Wilson, T.2
Tapsell, S.3
Penning-Rowsell, E.4
Viavattene, C.5
Fernandez-Bilbao, A.6
-
35
-
-
33044509099
-
-
R& D Technical report FD2317TR Department for Environment, Food & Rural Affairs-Flood Management Division, London
-
Ramsbottom D, Floyd P, Penning-Rowsell E (2003) Flood risks to people-phase 1. R& D Technical report FD2317TR Department for Environment, Food & Rural Affairs-Flood Management Division, London.
-
(2003)
Flood Risks to People-phase 1
-
-
Ramsbottom, D.1
Floyd, P.2
Penning-Rowsell, E.3
-
37
-
-
75949111604
-
Breaching parameters of earth and rockfill dams
-
Xu Y, Zhang LM (2009) Breaching parameters of earth and rockfill dams. J Geotech Geoenviron Eng ASCE 135(12): 1957-1970.
-
(2009)
J Geotech Geoenviron Eng ASCE
, vol.135
, Issue.12
, pp. 1957-1970
-
-
Xu, Y.1
Zhang, L.M.2
-
38
-
-
33745366481
-
An empirical model of fatalities and injuries due to floods in Japan
-
Zhai G, Fukuzono T, Ikeda S (2006) An empirical model of fatalities and injuries due to floods in Japan. J Am Water Resour As 42(4): 863-875.
-
(2006)
J Am Water Resour As
, vol.42
, Issue.4
, pp. 863-875
-
-
Zhai, G.1
Fukuzono, T.2
Ikeda, S.3
|