메뉴 건너뛰기




Volumn 1, Issue , 2012, Pages 339-343

Pattern analysis for load forecasting

Author keywords

load prediction; pattern analysis

Indexed keywords

ACCURATE PREDICTION; ELECTRIC POWER SYSTEM PLANNING; FORECASTING METHODS; LOAD FORECASTING; LOAD PATTERNS; LOAD PREDICTIONS; PATTERN ANALYSIS; SHORT TERM LOAD FORECASTING; TYPICAL PATTERNS;

EID: 84867022069     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (6)

References (26)
  • 2
    • 0037505508 scopus 로고    scopus 로고
    • Short-term load forecasting via ARMA model identificaiton including non-gaussian process considerations
    • S. J. Huang and K. Shih, Short-term load forecasting via ARMA model identificaiton including non-gaussian process considerations. IEEE trans Power System 2003, PP673-679
    • (2003) IEEE Trans Power System , pp. 673-679
    • Huang, S.J.1    Shih, K.2
  • 3
    • 0026207670 scopus 로고
    • Short term load forecasting using adaptive neural network
    • T. Dillon, S. Sesito and S. Leung, Short term load forecasting using adaptive neural network. Electric Power Energy System, 1991, PP186-192
    • (1991) Electric Power Energy System , pp. 186-192
    • Dillon, T.1    Sesito, S.2    Leung, S.3
  • 4
    • 0035248045 scopus 로고    scopus 로고
    • Neural networks for short-term laod forecasting: A review and evaluation
    • H. Hipper, C. Pedreira and R. Souza, Neural networks for short-term laod forecasting: a review and evaluation, IEEE Trans Power System, 2001, PP. 44-55
    • (2001) IEEE Trans Power System , pp. 44-55
    • Hipper, H.1    Pedreira, C.2    Souza, R.3
  • 5
    • 0034186817 scopus 로고    scopus 로고
    • Short-term load forecasting for special days in anomalous load conditons using neural networks and fuzzy inference method
    • K. Kim, H. Youn and Y. Kang, Short-term load forecasting for special days in anomalous load conditons using neural networks and fuzzy inference method, IEEE Trans Powre System. 2000, PP. 559-565
    • (2000) IEEE Trans Powre System. , pp. 559-565
    • Kim, K.1    Youn, H.2    Kang, Y.3
  • 6
    • 0034138664 scopus 로고    scopus 로고
    • Very short-term load forecasting using artificial neural networks
    • W. Charytoniuk and M chen., Very short-term load forecasting using artificial neural networks, IEEE Trans Power System, 2000, PP. 263-268
    • (2000) IEEE Trans Power System , pp. 263-268
    • Charytoniuk, W.1    Chen, M.2
  • 7
    • 0027590291 scopus 로고
    • A generalized knowledge-based short term loadforecasting technique
    • S. Rahman and O. Hazim, A generalized knowledge-based short term loadforecasting technique. IEEE Trans Power System 1993;8(2): PP. 508-514.
    • (1993) IEEE Trans Power System , vol.8 , Issue.2 , pp. 508-514
    • Rahman, S.1    Hazim, O.2
  • 8
    • 0026257538 scopus 로고
    • A priory vector based technique for load forecasting
    • S. Rahman and G. Shrestha. A priory vector based technique for load forecasting, IEEE Trans Power System 1993;6(4),PP.1459-1464.
    • (1993) IEEE Trans Power System , vol.6 , Issue.4 , pp. 1459-1464
    • Rahman, S.1    Shrestha, G.2
  • 9
    • 0034138664 scopus 로고    scopus 로고
    • Very Short-term Load Forecasting Using Artificial Neural Networks
    • W. Charytoniuk and M. Chen, "Very Short-term Load Forecasting Using Artificial Neural Networks," IEEE Trans. Power Systems, vol. 15, no. 1, 2000, PP. 263-268.
    • (2000) IEEE Trans. Power Systems , vol.15 , Issue.1 , pp. 263-268
    • Charytoniuk, W.1    Chen, M.2
  • 10
    • 0024764917 scopus 로고
    • Analysis and evaluation of five short-term load forecasting techniques
    • Nov.
    • I. Moghram and S. Rahman, "Analysis and evaluation of five short-term load forecasting techniques," IEEE Trans Power Syst., vol. 4, no. 4, PP. 1484-1491, Nov. 1989.
    • (1989) IEEE Trans Power Syst. , vol.4 , Issue.4 , pp. 1484-1491
    • Moghram, I.1    Rahman, S.2
  • 11
    • 0025519319 scopus 로고
    • A regression-based approach to short-term system load forecasting
    • Nov.
    • A. D. Papalexopoulos and T. C. Hesterberg, "A regression-based approach to short-term system load forecasting," IEEE Trans Power Syst., vol. 5, no. 4, PP. 1535-1547, Nov. 1990.
    • (1990) IEEE Trans Power Syst. , vol.5 , Issue.4 , pp. 1535-1547
    • Papalexopoulos, A.D.1    Hesterberg, T.C.2
  • 12
    • 0035425552 scopus 로고    scopus 로고
    • Short-term hourly load forecasting using time-series odeling with peak load estimation capability
    • Aug.
    • N. Amjady, "Short-term hourly load forecasting using time-series odeling with peak load estimation capability," EEE Trans Power Syst., vol. 15, no. 3, PP. 498-505, Aug. 2001.
    • (2001) EEE Trans Power Syst. , vol.15 , Issue.3 , pp. 498-505
    • Amjady, N.1
  • 13
    • 0023563676 scopus 로고
    • Short-term load forecasting
    • Dec.
    • Grass and F. D. Galiana, "Short-term load forecasting," Proceedings of IEEE, vol. 75, no. 12, PP. 1558-1572, Dec. 1987.
    • (1987) Proceedings of IEEE , vol.75 , Issue.12 , pp. 1558-1572
    • Galiana, F.D.1
  • 15
    • 0032142541 scopus 로고    scopus 로고
    • Nonparametric regression based short-term load forecasting
    • Aug.
    • W. Charytoniuk, M. S. Chen, and P. Van Olinda, "Nonparametric regression based short-term load forecasting," IEEE Trans. on Power Systems, vol. 13, no. 3, PP. 725-730, Aug. 1998.
    • (1998) IEEE Trans. on Power Systems , vol.13 , Issue.3 , pp. 725-730
    • Charytoniuk, W.1    Chen, M.S.2    Van Olinda, P.3
  • 16
    • 0025519350 scopus 로고
    • Short term load forecasting of Taiwan power system using a knowledge-based expert system
    • 1990
    • K. L. Ho, Y. Y. Hsu, C. F. Chen, T. E. Lee, C. C. Liang, T. S. Lai, and K. K. Chen, Short term load forecasting of Taiwan power system using a knowledge-based expert system, IEEE Trans. Power Systems, vol. 5, no. 4, 1990, PP. 1214-1221, 1990.
    • (1990) IEEE Trans. Power Systems , vol.5 , Issue.4 , pp. 1214-1221
    • Ho, K.L.1    Hsu, Y.Y.2    Chen, C.F.3    Lee, T.E.4    Liang, C.C.5    Lai, T.S.6    Chen, K.K.7
  • 17
    • 0027590291 scopus 로고
    • A generalized knowledge-based short-term load forecasting technique
    • S. Rahman and O. Hazim, A generalized knowledge-based short-term load forecasting technique, IEEE Trans. Power Syst, vol. 8, no. 2, 1993, PP. 508-514.
    • (1993) IEEE Trans. Power Syst , vol.8 , Issue.2 , pp. 508-514
    • Rahman, S.1    Hazim, O.2
  • 18
    • 36749004284 scopus 로고    scopus 로고
    • Multistage Artificial Neural Network Short-Term Load Forecasting Engine with Front-End Weather Forecast
    • K. Methaprayoon, W. Lee, S. Rasmiddattaa, J. Lia and R. Ross, "Multistage Artificial Neural Network Short-Term Load Forecasting Engine With Front-End Weather Forecast," IEEE Industrial Applications, vol. 43, no. 6 , 2007, PP. 1410-1416.
    • (2007) IEEE Industrial Applications , vol.43 , Issue.6 , pp. 1410-1416
    • Methaprayoon, K.1    Lee, W.2    Rasmiddattaa, S.3    Lia, J.4    Ross, R.5
  • 19
    • 0030084673 scopus 로고    scopus 로고
    • Optimal fuzzy inference for short-term load forecasting
    • H. Mori and H. Kobayashi, Optimal fuzzy inference for short-term load forecasting, IEEE Trans. Power Systems, vol. 11, no. 1, 1996 , PP. 390-396.
    • (1996) IEEE Trans. Power Systems , vol.11 , Issue.1 , pp. 390-396
    • Mori, H.1    Kobayashi, H.2
  • 21
  • 23
    • 0036699869 scopus 로고    scopus 로고
    • Neural network load forecasting with weather ensemble predictions
    • J.W. Taylor and R. Buizza R, Neural network load forecasting with weather ensemble predictions. IEEE Trans Power Syst 2002;17(3), PP. 626-632.
    • (2002) IEEE Trans Power Syst , vol.17 , Issue.3 , pp. 626-632
    • Taylor, J.W.1    Buizza R, R.2
  • 24
    • 0030286579 scopus 로고    scopus 로고
    • Neural network-based short-term load forecasting using weather compensation
    • T. W. Chow and C. T. Leung, Neural network-based short-term load forecasting using weather compensation. IEEE Trans Power Syst 1996; PP: 1736-42.
    • (1996) IEEE Trans Power Syst , pp. 1736-1742
    • Chow, T.W.1    Leung, C.T.2
  • 25
    • 0030235269 scopus 로고    scopus 로고
    • Nonlinear autoregressive integrated neural network model for short-term load forecasting
    • T. W. Chow and C. T. Leung, Nonlinear autoregressive integrated neural network model for short-term load forecasting. lEE Proc Gener Transm Distrib 1996;143(5), PP.500-506.
    • (1996) LEE Proc Gener Transm Distrib , vol.143 , Issue.5 , pp. 500-506
    • Chow, T.W.1    Leung, C.T.2
  • 26
    • 0036474210 scopus 로고    scopus 로고
    • One-hour-ahead load forecasting using neural network
    • T. Senjyu, H. Takara, K. Uezato and T. Funabashi, One-hour-ahead load forecasting using neural network. IEEE Trans Power Syst 2002;17(1), PP. 113-118.
    • (2002) IEEE Trans Power Syst , vol.17 , Issue.1 , pp. 113-118
    • Senjyu, T.1    Takara, H.2    Uezato, K.3    Funabashi, T.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.