메뉴 건너뛰기




Volumn 18, Issue 2, 2003, Pages 673-679

Short-term load forecasting via ARMA model identification including non-Gaussian process considerations

Author keywords

Bispectrum; Cumulant; Non Gaussian process; Short term load forecast

Indexed keywords

COMPUTER SIMULATION; FOURIER TRANSFORMS; LEAST SQUARES APPROXIMATIONS; MATRIX ALGEBRA; MAXIMUM LIKELIHOOD ESTIMATION; PARAMETER ESTIMATION; POLES AND ZEROS; RANDOM PROCESSES; REGRESSION ANALYSIS; SPECTRUM ANALYSIS; TIME SERIES ANALYSIS; TRANSFER FUNCTIONS;

EID: 0037505508     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2003.811010     Document Type: Article
Times cited : (570)

References (29)
  • 2
    • 0023563676 scopus 로고
    • Short term load forecasting
    • Dec.
    • G. Gross and F. D. Galiana, "Short term load forecasting," Proc. IEEE, vol. 75, pp. 1558-1573, Dec. 1987.
    • (1987) Proc. IEEE , vol.75 , pp. 1558-1573
    • Gross, G.1    Galiana, F.D.2
  • 3
    • 0031119047 scopus 로고    scopus 로고
    • Expert systems: Their implications and applications for power systems
    • Apr./May
    • K. G. Rajesh, "Expert systems: Their implications and applications for power systems," IEEE Potentials, vol. 16, no. 2, pp. 35-37, Apr./May 1997.
    • (1997) IEEE Potentials , vol.16 , Issue.2 , pp. 35-37
    • Rajesh, K.G.1
  • 4
    • 0029356764 scopus 로고
    • Implementation of hybrid short-term load forecasting system using artificial neural networks and fuzzy expert systems
    • Aug.
    • K. H. Kim, J. K. Park, K. J. Hwang, and S. H. Kim, "Implementation of hybrid short-term load forecasting system using artificial neural networks and fuzzy expert systems," IEEE Trans. Power Syst., vol. 10, pp. 1534-1539, Aug. 1995.
    • (1995) IEEE Trans. Power Syst. , vol.10 , pp. 1534-1539
    • Kim, K.H.1    Park, J.K.2    Hwang, K.J.3    Kim, S.H.4
  • 5
    • 0032592947 scopus 로고    scopus 로고
    • Parallel neural network-fuzzy expert system strategy for short-term load forecasting: System implementation and performance evaluation
    • Aug.
    • D. Srinivasan, T. S. Swee, C. S. Cheng, and E. K. Chan, "Parallel neural network-fuzzy expert system strategy for short-term load forecasting: System implementation and performance evaluation," IEEE Trans. Power Syst., vol. 14, pp. 1100-1106, Aug. 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , pp. 1100-1106
    • Srinivasan, D.1    Swee, T.S.2    Cheng, C.S.3    Chan, E.K.4
  • 7
    • 0030182529 scopus 로고    scopus 로고
    • Genetic-based multi-layered perceptrons for Taiwan power system short-term load forecasting
    • July
    • S. J. Huang and C. L. Huang, "Genetic-Based multi-layered perceptrons for taiwan power system short-term load forecasting," Int. J. Elect. Power Syst. Res., vol. 38, no. 3, pp. 69-74, July 1996.
    • (1996) Int. J. Elect. Power Syst. Res. , vol.38 , Issue.3 , pp. 69-74
    • Huang, S.J.1    Huang, C.L.2
  • 8
    • 0032142541 scopus 로고    scopus 로고
    • Nonparametric regression based short-term load forecasting
    • Aug.
    • W. Charytoniuk, M. S. Chen, and P. Van Olinda, "Nonparametric regression based short-term load forecasting," IEEE Trans. Power Syst., vol. 13, pp. 725-730, Aug. 1998.
    • (1998) IEEE Trans. Power Syst. , vol.13 , pp. 725-730
    • Charytoniuk, W.1    Chen, M.S.2    Van Olinda, P.3
  • 10
    • 0028546825 scopus 로고
    • Regression based peak load forecasting using a transformation technique
    • Nov.
    • T. Haida and S. Muto, "Regression based peak load forecasting using a transformation technique," IEEE Trans. Power Syst., vol. 9, pp. 1788-1794, Nov. 1994.
    • (1994) IEEE Trans. Power Syst. , vol.9 , pp. 1788-1794
    • Haida, T.1    Muto, S.2
  • 11
    • 0032142541 scopus 로고    scopus 로고
    • Nonparametric regression based short-term load forecasting
    • Aug.
    • W. Charytoniuk, M. Chen, and P. Olinda, "Nonparametric regression based short-term load forecasting," IEEE Trans. Power Syst., vol. 13, pp. 725-730, Aug. 1998.
    • (1998) IEEE Trans. Power Syst. , vol.13 , pp. 725-730
    • Charytoniuk, W.1    Chen, M.2    Olinda, P.3
  • 12
    • 85047678405 scopus 로고    scopus 로고
    • Hybrid adaptive techniques for electric-load forecast using ANN and ARIMA
    • July
    • A. A. El-Desouky and M. M. Elkateb, "Hybrid adaptive techniques for electric-load forecast using ANN and ARIMA," Proc. Inst. Elect. Eng.-Gen., Transm., Dist., vol. 147, no. 4, pp. 213-217, July 2000.
    • (2000) Proc. Inst. Elect. Eng.-Gen., Transm., Dist. , vol.147 , Issue.4 , pp. 213-217
    • El-Desouky, A.A.1    Elkateb, M.M.2
  • 14
    • 0032204319 scopus 로고    scopus 로고
    • Methodology for weekly load forecasting
    • Nov.
    • E. H. Barakat and J. M. Al-Qasem, "Methodology for weekly load forecasting," IEEE Trans. Power Syst., vol. 13, pp. 1548-1555, Nov. 1998.
    • (1998) IEEE Trans. Power Syst. , vol.13 , pp. 1548-1555
    • Barakat, E.H.1    Al-Qasem, J.M.2
  • 15
    • 0035425552 scopus 로고    scopus 로고
    • Short-term hourly load forecasting using time-series modeling with peak load estimation capability
    • Nov.
    • N. Amjady, "Short-Term hourly load forecasting using time-series modeling with peak load estimation capability," IEEE Trans. Power Syst., vol. 16, pp. 798-805, Nov. 2001.
    • (2001) IEEE Trans. Power Syst. , vol.16 , pp. 798-805
    • Amjady, N.1
  • 17
    • 0026119462 scopus 로고
    • Tutorial on higher-order statistics in signal processing and system theory: Theoretical results and some applications
    • Mar.
    • J. M. Mendel, "Tutorial on higher-order statistics in signal processing and system theory: Theoretical results and some applications," Proc. IEEE, vol. 79, pp. 278-305, Mar. 1991.
    • (1991) Proc. IEEE , vol.79 , pp. 278-305
    • Mendel, J.M.1
  • 18
    • 85032751474 scopus 로고
    • Signal processing with higher-order spectra
    • July
    • C. L. Nikias and J. M. Mendel, "Signal processing with higher-order spectra," IEEE Signal Processing Mag., pp. 10-37, July 1991.
    • (1991) IEEE Signal Processing Mag. , pp. 10-37
    • Nikias, C.L.1    Mendel, J.M.2
  • 19
    • 84986811814 scopus 로고
    • Testing for gaussianity and linearity of a stationary time series
    • M. J. Hinch, "Testing for gaussianity and linearity of a stationary time series," J. Time Series Analysis, vol. 3, no. 3, pp. 169-176, 1982.
    • (1982) J. Time Series Analysis , vol.3 , Issue.3 , pp. 169-176
    • Hinch, M.J.1
  • 20
    • 0028517212 scopus 로고
    • Testing for linearity of noisy stationary signals
    • July
    • J. K. Tugnait, "Testing for linearity of noisy stationary signals," IEEE Trans. Signal Processing, vol. 42, pp. 2747-2748, July 1989.
    • (1989) IEEE Trans. Signal Processing , vol.42 , pp. 2747-2748
    • Tugnait, J.K.1
  • 21
    • 0024627342 scopus 로고
    • Identification of nonminimum phase systems using higher order statistics
    • Mar.
    • G. B. Giannakis and J. M. Mendel, "Identification of nonminimum phase systems using higher order statistics," IEEE Trans. Acoust., Speech, Signal Processing, vol. 37, no. 3, pp. 360-377, Mar. 1989.
    • (1989) IEEE Trans. Acoust., Speech, Signal Processing , vol.37 , Issue.3 , pp. 360-377
    • Giannakis, G.B.1    Mendel, J.M.2
  • 22
    • 0025465150 scopus 로고
    • Detection of nongaussian signals in nongaussian noise using the bispectrum
    • July
    • M. J. Hinch and G. R. Wilson, "Detection of nongaussian signals in nongaussian noise using the bispectrum," IEEE Trans. Acoust., Speech, Signal Processing, vol. 38, pp. 1126-1131, July 1989.
    • (1989) IEEE Trans. Acoust., Speech, Signal Processing , vol.38 , pp. 1126-1131
    • Hinch, M.J.1    Wilson, G.R.2
  • 23
  • 24
    • 0036504240 scopus 로고    scopus 로고
    • Robust and accurate ARX and ARMA model order estimation of nongaussian processes
    • Mar.
    • A. Al-Smadi and D. Mitchell Wilkes, "Robust and accurate ARX and ARMA model order estimation of nongaussian processes," IEEE Trans. Signal Processing, vol. 50, pp. 759-763, Mar. 2002.
    • (2002) IEEE Trans. Signal Processing , vol.50 , pp. 759-763
    • Al-Smadi, A.1    Mitchell Wilkes, D.2
  • 26
    • 0030216026 scopus 로고    scopus 로고
    • Fast adaptive algorithm for AR parameters estimation using higher order statistics
    • August
    • D. Aboutajdine, A. Adib, and A. Meziane, "Fast adaptive algorithm for AR parameters estimation using higher order statistics," IEEE Signal Processing Magazine, vol. 44. no. 8, pp. 1998-2009, August 1996.
    • (1996) IEEE Signal Processing Magazine , vol.44 , Issue.8 , pp. 1998-2009
    • Aboutajdine, D.1    Adib, A.2    Meziane, A.3
  • 27
    • 0027879513 scopus 로고
    • Singular value decomposition-based MA order determination of nongaussian ARMA models
    • Aug.
    • X. D. Zhang and Y. S. Zhang, "Singular value decomposition-based MA order determination of nongaussian ARMA models," IEEE Trans. Signal Processing, vol. 41, pp. 2657-2664, Aug. 1993.
    • (1993) IEEE Trans. Signal Processing , vol.41 , pp. 2657-2664
    • Zhang, X.D.1    Zhang, Y.S.2
  • 28
    • 0037890863 scopus 로고
    • AR modeling of skewed signals using third-order cumulants
    • Apr.
    • J. R. Dickie, "AR modeling of skewed signals using third-order cumulants," Proc. Inst. Elect. Eng.-Visual Image Signal Processing, vol. 142, no. 2, pp. 78-86, Apr. 1995.
    • (1995) Proc. Inst. Elect. Eng.-Visual Image Signal Processing , vol.142 , Issue.2 , pp. 78-86
    • Dickie, J.R.1
  • 29
    • 0029328212 scopus 로고
    • Order determination of MA models using fourth-order cumulants
    • June
    • S. A. Alshebeili, "Order determination of MA models using fourth-order cumulants," IEEE Signal Processing Lett., vol. 2, pp. 120-122, June 1995.
    • (1995) IEEE Signal Processing Lett. , vol.2 , pp. 120-122
    • Alshebeili, S.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.