메뉴 건너뛰기




Volumn 140, Issue 2, 2012, Pages 749-755

On the representation of timing for different structures within MRP theory

Author keywords

Distribution; Input output analysis; Laplace transform; Lead times; Location; MRP theory; Multi stage production inventory systems; Transportation

Indexed keywords

DISTRIBUTION; INPUT OUTPUT ANALYSIS; LEAD TIME; MRP THEORY; PRODUCTION INVENTORY SYSTEM;

EID: 84866740882     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2011.04.016     Document Type: Conference Paper
Times cited : (48)

References (37)
  • 2
    • 34250022213 scopus 로고    scopus 로고
    • Measuring the supply chain risk and vulnerability in frequency space
    • D. Bogataj, and M. Bogataj Measuring the supply chain risk and vulnerability in frequency space International Journal of Production Economics 108 1-2 2007 291 301
    • (2007) International Journal of Production Economics , vol.108 , Issue.12 , pp. 291-301
    • Bogataj, D.1    Bogataj, M.2
  • 3
    • 0032667509 scopus 로고    scopus 로고
    • Inventory allocation and customer travelling problem in spatial duopoly
    • M. Bogataj Inventory allocation and customer travelling problem in spatial duopoly International Journal of Production Economics 59 1999 271 279
    • (1999) International Journal of Production Economics , vol.59 , pp. 271-279
    • Bogataj, M.1
  • 4
    • 1342264262 scopus 로고    scopus 로고
    • On the compact presentation of the lead time perturbations in distribution networks
    • M. Bogataj, and L. Bogataj On the compact presentation of the lead time perturbations in distribution networks International Journal of Production Economics 88 2 2003 145 155
    • (2003) International Journal of Production Economics , vol.88 , Issue.2 , pp. 145-155
    • Bogataj, M.1    Bogataj, L.2
  • 7
    • 0034689120 scopus 로고    scopus 로고
    • Solving large unconstrained multilevel lot-sizing problems using a hybrid genetic algorithm
    • N. Dellaert, and J. Jeunet Solving large unconstrained multilevel lot-sizing problems using a hybrid genetic algorithm International Journal of Production Research 38 5 2000 1083 1099
    • (2000) International Journal of Production Research , vol.38 , Issue.5 , pp. 1083-1099
    • Dellaert, N.1    Jeunet, J.2
  • 8
    • 0034501331 scopus 로고    scopus 로고
    • A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs
    • N. Dellaert, J. Jeunet, and N. Jonard A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs International Journal of Production Economics 68 2000 241 257
    • (2000) International Journal of Production Economics , vol.68 , pp. 241-257
    • Dellaert, N.1    Jeunet, J.2    Jonard, N.3
  • 9
    • 84866741286 scopus 로고    scopus 로고
    • Material planning for a remanufacturing facility
    • J.A.D. Machuca, T. Mandakovic, Production and Operations Management Society and the University of Sevilla Sevilla
    • G. Ferrer, and C. Whybark Material planning for a remanufacturing facility J.A.D. Machuca, T. Mandakovic, POM - Facing the New Millenium 2000 Production and Operations Management Society and the University of Sevilla Sevilla 225 236
    • (2000) POM - Facing the New Millenium , pp. 225-236
    • Ferrer, G.1    Whybark, C.2
  • 10
    • 0000005440 scopus 로고
    • On the application of the Laplace transform to certain economic problems
    • R.W. Grubbström On the application of the Laplace transform to certain economic problems Management Science 13 7 1967 558 567
    • (1967) Management Science , vol.13 , Issue.7 , pp. 558-567
    • Grubbström, R.W.1
  • 11
    • 0030206269 scopus 로고    scopus 로고
    • Stochastic properties of a production-inventory process with planned production using transform methodology
    • R.W. Grubbström Stochastic properties of a production-inventory process with planned production using transform methodology International Journal of Production Economics 45 1996 407 419
    • (1996) International Journal of Production Economics , vol.45 , pp. 407-419
    • Grubbström, R.W.1
  • 13
    • 70350787701 scopus 로고    scopus 로고
    • Transform methodology applied to some inventory problems
    • R.W. Grubbström Transform methodology applied to some inventory problems Zeitschrift für Betriebswirtschaft 77 3 2007 297 324
    • (2007) Zeitschrift für Betriebswirtschaft , vol.77 , Issue.3 , pp. 297-324
    • Grubbström, R.W.1
  • 18
    • 0026819457 scopus 로고
    • Intertemporal generalization of the relationship between material requirements planning and Input-Output Analysis
    • R.W. Grubbström, and P. Ovrin Intertemporal generalization of the relationship between material requirements planning and Input-Output Analysis International Journal of Production Economics 26 1-3 1992 311 318
    • (1992) International Journal of Production Economics , vol.26 , Issue.13 , pp. 311-318
    • Grubbström, R.W.1    Ovrin, P.2
  • 19
    • 0011730713 scopus 로고    scopus 로고
    • An overview of Input-Output Analysis applied to production-inventory systems
    • R.W. Grubbström, and O. Tang An overview of Input-Output Analysis applied to production-inventory systems Economic Systems Review 12 2000 3 25
    • (2000) Economic Systems Review , vol.12 , pp. 3-25
    • Grubbström, R.W.1    Tang, O.2
  • 20
    • 84866732859 scopus 로고    scopus 로고
    • The space of solution alternatives in the optimal lotsizing problem for general assembly systems applying MRP theory
    • doi:10.1016/j.ijpe.2011.01.012 this issue
    • Grubbström, R.W., Tang, O. The space of solution alternatives in the optimal lotsizing problem for general assembly systems applying MRP theory. International Journal of Production Economics, this issue, doi:10.1016/j.ijpe. 2011.01.012.
    • International Journal of Production Economics
    • Grubbström, R.W.1
  • 21
    • 0034694477 scopus 로고    scopus 로고
    • Introducing capacity limitations into multi-level, multi-stage production-inventory systems applying the input output/Laplace transform approach
    • R.W. Grubbström, and Z. Wang Introducing capacity limitations into multi-level, multi-stage production-inventory systems applying the input output/Laplace transform approach International Journal of Production Research 38 17 2000 4227 4234
    • (2000) International Journal of Production Research , vol.38 , Issue.17 , pp. 4227-4234
    • Grubbström, R.W.1    Wang, Z.2
  • 22
    • 0037431672 scopus 로고    scopus 로고
    • A stochastic model of multi-level/multi-stage capacity-constrained production-inventory systems
    • R.W. Grubbström, and Z. Wang A stochastic model of multi-level/multi-stage capacity-constrained production-inventory systems International Journal of Production Economics 81-82 2003 483 494
    • (2003) International Journal of Production Economics , vol.81-82 , pp. 483-494
    • Grubbström, R.W.1    Wang, Z.2
  • 23
    • 84866737769 scopus 로고    scopus 로고
    • Capacity Constraints in Multi-Stage Production-Inventory Systems - Applying Material Requirements Planning Theory
    • PROFIL 23, Linköping
    • Huynh, T. T. T., 2006. Capacity Constraints in Multi-Stage Production-Inventory Systems - Applying Material Requirements Planning Theory, Production-Economic Research in Linköping, PROFIL 23, Linköping.
    • (2006) Production-Economic Research in Linköping
    • Huynh, T.T.T.1
  • 25
    • 0030244109 scopus 로고    scopus 로고
    • Simulated annealing and genetic algorithms for scheduling products with multi-level product structure
    • J-U. Kim, and Y-D. Kim Simulated annealing and genetic algorithms for scheduling products with multi-level product structure Computers & Operations Research 23 1996 857 868
    • (1996) Computers & Operations Research , vol.23 , pp. 857-868
    • Kim, J.-U.1    Kim, Y.-D.2
  • 26
    • 0033166857 scopus 로고    scopus 로고
    • A genetic algorithm for multi-level, multi-machine lot sizing and scheduling
    • A. Kimms A genetic algorithm for multi-level, multi-machine lot sizing and scheduling Computers & Operations Research 26 1999 829 848
    • (1999) Computers & Operations Research , vol.26 , pp. 829-848
    • Kimms, A.1
  • 28
    • 0025701546 scopus 로고
    • Multi-level lot-sizing problem: Evaluation of a simulated annealing heuristic
    • R. Kuik, and M. Salomon Multi-level lot-sizing problem: evaluation of a simulated annealing heuristic European Journal of Operational Research 45 1990 25 37
    • (1990) European Journal of Operational Research , vol.45 , pp. 25-37
    • Kuik, R.1    Salomon, M.2
  • 34
    • 0030206273 scopus 로고    scopus 로고
    • A Capacity-constrained multi-level inventory and production control problem
    • A. Segerstedt A Capacity-constrained multi-level inventory and production control problem International Journal of Production Economics 45 1996 449 461
    • (1996) International Journal of Production Economics , vol.45 , pp. 449-461
    • Segerstedt, A.1
  • 36
    • 0002893786 scopus 로고
    • The use of mathematics in production and inventory control
    • A. Vazsonyi The use of mathematics in production and inventory control Management Science 1 1 1955 70 85
    • (1955) Management Science , vol.1 , Issue.1 , pp. 70-85
    • Vazsonyi, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.