The space of solution alternatives in the optimal lotsizing problem for general assembly systems applying MRP theory

Author keywords

Assembly system; Complexity; Laplace transform; MRP theory; Optimal lotsizing

Indexed keywords

ASSEMBLY SYSTEMS; AVERAGE COST; BILL OF MATERIALS; BINARY DECISION; COMPLEXITY; DYNAMIC LOT-SIZING; ECONOMIC EVALUATIONS; FEASIBLE SOLUTION; GENERAL ASSEMBLY; GENERAL METHOD; INPUT OUTPUT ANALYSIS; LOT SIZING; LOT SIZING PROBLEMS; MRP THEORY; MULTI-STAGE; NET PRESENT VALUE; OPTIMAL DYNAMICS; OPTIMAL PRODUCTION; PRODUCTION BATCHES; PRODUCTION INVENTORY SYSTEM; PRODUCTION PLANS; SOLUTION SPACE; WAGNER-WHITIN ALGORITHMS;

EID: 84866732859     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2011.01.012     Document Type: Conference Paper
Times cited : (18)

References (39)
  • 1
    • 0022672722 scopus 로고
    • Optimal lot-sizing algorithms for complex product structures
    • P. Afentakis, and B. Gavish Optimal lot-sizing algorithms for complex product structures Operations Research 34 1986 237 249
    • (1986) Operations Research , vol.34 , pp. 237-249
    • Afentakis, P.1    Gavish, B.2
  • 2
    • 0021376670 scopus 로고
    • Computationally efficient optimal solutions to the lot-sizing problem in multistage assembly systems
    • P. Afentakis, B. Gavish, and U. Karmarkar Computationally efficient optimal solutions to the lot-sizing problem in multistage assembly systems Management Science 30 1984 222 239
    • (1984) Management Science , vol.30 , pp. 222-239
    • Afentakis, P.1    Gavish, B.2    Karmarkar, U.3
  • 3
    • 0005801960 scopus 로고
    • Some doubly exponential sequences
    • A.V. Aho, and N.J.A. Sloane Some doubly exponential sequences Fibonacci Quarterly 11 1973 429 437
    • (1973) Fibonacci Quarterly , vol.11 , pp. 429-437
    • Aho, A.V.1    Sloane, N.J.A.2
  • 4
    • 0040553743 scopus 로고
    • The impact of a rolling schedule in a multilevel MRP system
    • J.D. Blackburn, and R.A. Millen The impact of a rolling schedule in a multilevel MRP system Journal of Operations Management 2 1982 125 135
    • (1982) Journal of Operations Management , vol.2 , pp. 125-135
    • Blackburn, J.D.1    Millen, R.A.2
  • 5
    • 34250022213 scopus 로고    scopus 로고
    • Measuring the supply chain risk and vulnerability in frequency space
    • D. Bogataj, and M. Bogataj Measuring the supply chain risk and vulnerability in frequency space International Journal of Production Economics 108 2007 291 301
    • (2007) International Journal of Production Economics , vol.108 , pp. 291-301
    • Bogataj, D.1    Bogataj, M.2
  • 6
    • 79952619942 scopus 로고    scopus 로고
    • Efficient location of industrial activity cells in a global supply chain
    • in press
    • Bogataj, M., Grubbström, R.W., Bogataj, L., Efficient location of industrial activity cells in a global supply chain, International Journal of Production Economics, in press. doi: 10.1016/j.ijpe.2010.09.035.
    • International Journal of Production Economics
    • Bogataj, M.1
  • 7
    • 70350777267 scopus 로고
    • Laplace transforms as present value rules: A note
    • S.A. Buser Laplace transforms as present value rules: a note Journal of Finance 41 1986 243 247
    • (1986) Journal of Finance , vol.41 , pp. 243-247
    • Buser, S.A.1
  • 8
    • 0001887653 scopus 로고
    • Economic lot size determination in multi-stage assembly systems
    • W.B. Crowston, M. Wagner, and J.F. Williams Economic lot size determination in multi-stage assembly systems Management Science 19 1973 517 527
    • (1973) Management Science , vol.19 , pp. 517-527
    • Crowston, W.B.1    Wagner, M.2    Williams, J.F.3
  • 9
    • 0034689120 scopus 로고    scopus 로고
    • Solving large unconstrained multilevel lot-sizing problems using a hybrid genetic algorithm
    • N. Dellaert, and J. Jeunet Solving large unconstrained multilevel lot-sizing problems using a hybrid genetic algorithm International Journal of Production Research 38 5 2000 1083 1099
    • (2000) International Journal of Production Research , vol.38 , Issue.5 , pp. 1083-1099
    • Dellaert, N.1    Jeunet, J.2
  • 10
    • 0034501331 scopus 로고    scopus 로고
    • A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs
    • N. Dellaert, J. Jeunet, and N. Jonard A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs International Journal of Production Economics 68 2000 241 257
    • (2000) International Journal of Production Economics , vol.68 , pp. 241-257
    • Dellaert, N.1    Jeunet, J.2    Jonard, N.3
  • 11
    • 0026208005 scopus 로고
    • A simple forward algorithm to solve general dynamic lot sizing models with n periods in 0(n log n) or 0(n) time
    • A. Federgruen, and M. Tzur A simple forward algorithm to solve general dynamic lot sizing models with n periods in 0(n log n) or 0(n) time Management Science 37 1991 909 925
    • (1991) Management Science , vol.37 , pp. 909-925
    • Federgruen, A.1    Tzur, M.2
  • 12
    • 0000005440 scopus 로고
    • On the application of the Laplace transform to certain economic problems
    • R.W. Grubbström On the application of the Laplace transform to certain economic problems Management Science 13 1967 558 567
    • (1967) Management Science , vol.13 , pp. 558-567
    • Grubbström, R.W.1
  • 13
    • 0018990961 scopus 로고
    • A principle for determining the correct capital costs of work-in-progress and inventory
    • R.W. Grubbström A principle for determining the correct capital costs of work-in-progress and inventory International Journal of Production Research 18 1980 259 271
    • (1980) International Journal of Production Research , vol.18 , pp. 259-271
    • Grubbström, R.W.1
  • 14
    • 29844433990 scopus 로고    scopus 로고
    • Algorithms for optimal dynamic lotsizing in discrete and continuous time
    • R.W. Grubbström Algorithms for optimal dynamic lotsizing in discrete and continuous time International Journal of Agile Manufacturing 8 2 2005 85 96
    • (2005) International Journal of Agile Manufacturing , vol.8 , Issue.2 , pp. 85-96
    • Grubbström, R.W.1
  • 15
    • 0035729664 scopus 로고    scopus 로고
    • Some aspects on modelling as a base for scientific recommendations
    • R.W. Grubbström Some aspects on modelling as a base for scientific recommendations Kybernetes 30 9/10 2001 1126 1138
    • (2001) Kybernetes , vol.30 , Issue.9-10 , pp. 1126-1138
    • Grubbström, R.W.1
  • 18
    • 0042472191 scopus 로고
    • The Axsäter integrated production-inventory system interpreted in terms of the theory of relatively closed systems
    • R.W. Grubbström, and J. Lundquist The Axsäter integrated production-inventory system interpreted in terms of the theory of relatively closed systems Journal of Cybernetics 7 1977 49 67
    • (1977) Journal of Cybernetics , vol.7 , pp. 49-67
    • Grubbström, R.W.1    Lundquist, J.2
  • 19
    • 0028444293 scopus 로고
    • Further theoretical considerations on the relationship between MRP, input-output analysis and multi-echelon inventory system
    • R.W. Grubbström, and A. Molinder Further theoretical considerations on the relationship between MRP, input-output analysis and multi-echelon inventory system International Journal of Production Economics 35 1994 299 311
    • (1994) International Journal of Production Economics , vol.35 , pp. 299-311
    • Grubbström, R.W.1    Molinder, A.2
  • 20
    • 0026819457 scopus 로고
    • Intertemporal generalization of the relationship between material requirements planning and input-output analysis
    • R.W. Grubbström, and P. Ovrin Intertemporal generalization of the relationship between material requirements planning and input-output analysis International Journal of Production Economics 26 1992 311 318
    • (1992) International Journal of Production Economics , vol.26 , pp. 311-318
    • Grubbström, R.W.1    Ovrin, P.2
  • 21
    • 0011730713 scopus 로고    scopus 로고
    • An overview of input-output analysis applied to production-inventory systems
    • R.W. Grubbström, and O. Tang An overview of input-output analysis applied to production-inventory systems Economic Systems Review 12 2000 3 25
    • (2000) Economic Systems Review , vol.12 , pp. 3-25
    • Grubbström, R.W.1    Tang, O.2
  • 22
    • 0034321043 scopus 로고    scopus 로고
    • Modelling rescheduling activities in a multi-period production-inventory system
    • R.W. Grubbström, and O. Tang Modelling rescheduling activities in a multi-period production-inventory system International Journal of Production Economics 68 2000 123 135
    • (2000) International Journal of Production Economics , vol.68 , pp. 123-135
    • Grubbström, R.W.1    Tang, O.2
  • 24
    • 0032639960 scopus 로고    scopus 로고
    • A market game with the characteristic function according to the MRP and input-output analysis model
    • L. Horvat, and L. Bogataj A market game with the characteristic function according to the MRP and input-output analysis model International Journal of Production Economics 59 1999 281 288
    • (1999) International Journal of Production Economics , vol.59 , pp. 281-288
    • Horvat, L.1    Bogataj, L.2
  • 26
    • 0033166857 scopus 로고    scopus 로고
    • A genetic algorithm for multi-level, multi-machine lot sizing and scheduling
    • A. Kimms A genetic algorithm for multi-level, multi-machine lot sizing and scheduling Computers and Operations Research 26 1999 829 848
    • (1999) Computers and Operations Research , vol.26 , pp. 829-848
    • Kimms, A.1
  • 27
    • 0030244109 scopus 로고    scopus 로고
    • Simulated annealing and genetic algorithms for scheduling products with multi-level product structure
    • J-U. Kim, and Y-D. Kim Simulated annealing and genetic algorithms for scheduling products with multi-level product structure Computers and Operations Research 23 1996 857 868
    • (1996) Computers and Operations Research , vol.23 , pp. 857-868
    • Kim, J.-U.1    Kim, Y.-D.2
  • 28
    • 0025701546 scopus 로고
    • Multi-level lot-sizing problem: Evaluation of a simulated annealing heuristic
    • R. Kuik, and M. Salomon Multi-level lot-sizing problem: evaluation of a simulated annealing heuristic European Journal of Operational Research 45 1990 25 37
    • (1990) European Journal of Operational Research , vol.45 , pp. 25-37
    • Kuik, R.1    Salomon, M.2
  • 29
    • 84985817972 scopus 로고
    • An efficient zero-one formulation of the multilevel lot-sizing problem
    • M.A. McKnew, C. Saydam, and B.J. Coleman An efficient zero-one formulation of the multilevel lot-sizing problem Decision Sciences 22 1991 280 295
    • (1991) Decision Sciences , vol.22 , pp. 280-295
    • McKnew, M.A.1    Saydam, C.2    Coleman, B.J.3
  • 32
    • 0019247722 scopus 로고
    • Optimal multi-level lot sizing for requirements planning systems
    • E. Steinberg, and H.A. Napier Optimal multi-level lot sizing for requirements planning systems Management Science 26 1980 1258 1271
    • (1980) Management Science , vol.26 , pp. 1258-1271
    • Steinberg, E.1    Napier, H.A.2
  • 33
    • 0000045398 scopus 로고
    • On a point in the theory of vulgar fractions
    • J.J. Sylvester On a point in the theory of vulgar fractions American Journal of Mathematics 3 4 1880 332 335
    • (1880) American Journal of Mathematics , vol.3 , Issue.4 , pp. 332-335
    • Sylvester, J.J.1
  • 38
    • 0001653909 scopus 로고
    • Minimum concave-cost solution of Leontief substitution models of multifacility inventory systems
    • A.F. Veinott Jr. Minimum concave-cost solution of Leontief substitution models of multifacility inventory systems Operations Research 17 1969 262 291
    • (1969) Operations Research , vol.17 , pp. 262-291
    • Veinott, Jr.A.F.1
  • 39
    • 0001962762 scopus 로고
    • A dynamic version of the economic lot size model
    • H.M. Wagner, and T.M. Whitin A dynamic version of the economic lot size model Management Science 5 1958 89 96
    • (1958) Management Science , vol.5 , pp. 89-96
    • Wagner, H.M.1    Whitin, T.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.