메뉴 건너뛰기




Volumn 18, Issue 7, 2012, Pages 1396-1405

Manufacturing resource allocation based on cloud manufacturing

Author keywords

Cloud manufacturing; Information flow; Material flow; Max inherit optimization; Resources allocation models

Indexed keywords

CLOUD SERVICES; COST OF MANUFACTURING; FORMAL DESCRIPTION; INFORMATION FLOWS; LEAST COST; MANUFACTURING RESOURCE ALLOCATION; MATERIAL FLOW; RESOURCE ALLOCATION PROBLEM; RESOURCE OPTIMIZATION; RESOURCES ALLOCATION;

EID: 84866250555     PISSN: 10065911     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (58)

References (22)
  • 1
    • 79960127517 scopus 로고    scopus 로고
    • Cloud manufacturing is a manufacturing service
    • in Chinese
    • YANG Haicheng. Cloud manufacturing is a manufacturing service[J]. Manufacture Information Engineering of China, 2010(6): 22-23(in Chinese).
    • (2010) Manufacture Information Engineering of China , Issue.6 , pp. 22-23
    • Yang, H.1
  • 2
    • 77949906705 scopus 로고    scopus 로고
    • Cloud manufacturing: A new service-oriented networked manufacturing model
    • in Chinese
    • LI Bohu, ZHANG Lin, WANG Shilong, et al. Cloud manufacturing: a new service-oriented networked manufacturing model[J]. Computer Integrated Manufacturing Systems, 2010, 16(1): 1-7, 16(in Chinese).
    • (2010) Computer Integrated Manufacturing Systems , vol.16 , Issue.1
    • Li, B.1    Zhang, L.2    Wang, S.3
  • 3
    • 79955913173 scopus 로고    scopus 로고
    • Further discussion on cloud manufacturing
    • in Chinese
    • LI Bohu, ZHANG Lin, REN Lei, et al. Further discussion on cloud manufacturing[J]. Computer Integrated Manufacturing Systems, 2011, 17(3): 449-457(in Chinese).
    • (2011) Computer Integrated Manufacturing Systems , vol.17 , Issue.3 , pp. 449-457
    • Li, B.1    Zhang, L.2    Ren, L.3
  • 4
    • 3442900327 scopus 로고    scopus 로고
    • Optimization deployment of networked manufacturing resources
    • in Chinese
    • MA Xuefen, DAI Xudong, SUN Shudong. Optimization deployment of networked manufacturing resources[J]. Computer Integrated Manufacturing Systems, 2004, 10(5): 523-527(in Chinese).
    • (2004) Computer Integrated Manufacturing Systems , vol.10 , Issue.5 , pp. 523-527
    • Ma, X.1    Dai, X.2    Sun, S.3
  • 5
    • 74849112737 scopus 로고    scopus 로고
    • Collaborative optimization of manufacture task decomposition and resource deployment of manufacturing unit
    • in Chinese
    • ZHOU Ke, LU Min, WANG Gang, et al. Collaborative optimization of manufacture task decomposition and resource deployment of manufacturing unit[J]. Journal of Harbin Institute of Technology, 2009, 41(11): 47-52(in Chinese).
    • (2009) Journal of Harbin Institute of Technology , vol.41 , Issue.11 , pp. 47-52
    • Zhou, K.1    Lu, M.2    Wang, G.3
  • 6
    • 77952534247 scopus 로고    scopus 로고
    • Optimal allocation model and its genetic algorithms of outsouring production resources in multi-task
    • in Chinese
    • YIN Sheng, YIN Chao, LIU Fei, et al. Optimal allocation model and its genetic algorithms of outsouring production resources in multi-task[J]. Journal of Chongqing University, 2010, 33(3): 49-55(in Chinese).
    • (2010) Journal of Chongqing University , vol.33 , Issue.3 , pp. 49-55
    • Yin, S.1    Yin, C.2    Liu, F.3
  • 7
    • 33846379653 scopus 로고    scopus 로고
    • Partner selection of agile supply chain based on ant colony optimization algorithm
    • in Chinese
    • JIANG Jianguo, XIA Na, ZHANG Fuguo, et al. Partner selection of agile supply chain based on ant colony optimization algorithm[J]. Journal of System Simulation, 2006, 18(12): 3377-3379(in Chinese).
    • (2006) Journal of System Simulation , vol.18 , Issue.12 , pp. 3377-3379
    • Jiang, J.1    Xia, N.2    Zhang, F.3
  • 9
    • 79960620381 scopus 로고    scopus 로고
    • Dynamic resource allocation and power management in virtualized data centers
    • 2010-05-06, 2011-01-13
    • URGAONKAR R, KOZAT U C, IGARASHI K, et al. Dynamic resource allocation and power management in virtualized data centers[EB/OL]. (2010-05-06)[2011-01-13]. http://www-scf.usc.edu/~urgaonka/papers/data_center.pdf.
    • Urgaonkar, R.1    Kozat, U.C.2    Igarashi, K.3
  • 10
    • 33846151407 scopus 로고    scopus 로고
    • Resource selection in virtual manufacturing cell reconfiguration
    • in Chinese
    • LENG Sheng, WEI Xiaobin, WANG Ningsheng, et al. Resource selection in virtual manufacturing cell reconfiguration[J]. Computer Integrated Manufacturing Systems, 2006, 12(11): 1814-1820, 1830(in Chinese).
    • (2006) Computer Integrated Manufacturing Systems , vol.12 , Issue.11
    • Leng, S.1    Wei, X.2    Wang, N.3
  • 11
    • 77957767723 scopus 로고    scopus 로고
    • Virtual hypervisor: Enabling fair and economical resource partitioning in cloud environments
    • Washington, D.C., USA: IEEE
    • KOCHUT A, SCHULZ C, SHAIKH H. Virtual hypervisor: enabling fair and economical resource partitioning in cloud environments[C]//Proceedings of NOMS 2010. Washington, D.C., USA: IEEE, 2010: 104-111.
    • (2010) Proceedings of NOMS 2010 , pp. 104-111
    • Kochut, A.1    Schulz, C.2    Shaikh, H.3
  • 12
    • 40849085074 scopus 로고    scopus 로고
    • Optimal job sequence determination and operation machine allocation in flexible manufacturing systems: An approach using adaptive hierarchical ant colony algorithm
    • PRAKASH A, TIWARI M K, SHANKAR R. Optimal job sequence determination and operation machine allocation in flexible manufacturing systems: an approach using adaptive hierarchical ant colony algorithm[J]. Journal of Intelligent Manufacturing, 2008, 19(2): 161-173.
    • (2008) Journal of Intelligent Manufacturing , vol.19 , Issue.2 , pp. 161-173
    • Prakash, A.1    Tiwari, M.K.2    Shankar, R.3
  • 13
    • 77957861680 scopus 로고    scopus 로고
    • Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm
    • UDHAYAKUMAR P, KUMANAN S. Sequencing and scheduling of job and tool in a flexible manufacturing system using ant colony optimization algorithm[J]. International Journal of Advanced Manufacturing Technology, 2010, 50(9-12): 1075-1084.
    • (2010) International Journal of Advanced Manufacturing Technology , vol.50 , Issue.9-12 , pp. 1075-1084
    • Udhayakumar, P.1    Kumanan, S.2
  • 14
    • 84866250264 scopus 로고    scopus 로고
    • Resource allocation in grid computing
    • 2007-03-15, 2011-01-23
    • KOOLE G, RIGHTER R. Resource allocation in grid computing[EB/OL]. (2007-03-15)[2011-01-23]. http://www.math.vu.nl/~koole/articles/2008jos/art.pdf.
    • Koole, G.1    Righter, R.2
  • 15
    • 84866235502 scopus 로고    scopus 로고
    • The instruction manual of 1stOpt
    • 2011-11-29, in Chinese
    • 7D-Soft High Technology Inc.. The instruction manual of 1stOpt[EB/OL]. [2011-11-29]. http://www.mesky.net/downz/tezzhck(in Chinese).
  • 17
    • 79955885883 scopus 로고    scopus 로고
    • Analyses of cloud manufacturing and related advanced manufacturing models
    • in Chinese
    • ZHANG Lin, LUO Yongliang, FAN Wenhui, et al. Analyses of cloud manufacturing and related advanced manufacturing models[J]. Computer Integrated Manufacturing Systems, 2011, 17(3): 458-468(in Chinese).
    • (2011) Computer Integrated Manufacturing Systems , vol.17 , Issue.3 , pp. 458-468
    • Zhang, L.1    Luo, Y.2    Fan, W.3
  • 18
    • 78650762653 scopus 로고    scopus 로고
    • Key technologies for the construction of manufacturing cloud
    • in Chinese
    • ZHANG Lin, LUO Yongliang, TAO Fei, et al. Key technologies for the construction of manufacturing cloud[J]. Computer Integrated Manufacturing Systems, 2010, 16(11): 2510-2520(in Chinese).
    • (2010) Computer Integrated Manufacturing Systems , vol.16 , Issue.11 , pp. 2510-2520
    • Zhang, L.1    Luo, Y.2    Tao, F.3
  • 19
    • 79955898095 scopus 로고    scopus 로고
    • Resource virtualization in cloud manufacturing
    • in Chinese
    • REN Lei, ZHANG Lin, ZHANG Yabin, et al. Resource virtualization in cloud manufacturing[J]. Computer Integrated Manufacturing Systems, 2011, 17(3): 511-518(in Chinese).
    • (2011) Computer Integrated Manufacturing Systems , vol.17 , Issue.3 , pp. 511-518
    • Ren, L.1    Zhang, L.2    Zhang, Y.3
  • 20
    • 79955891947 scopus 로고    scopus 로고
    • Typical characteristics of cloud manufacturing and several key issues of cloud service composition
    • in Chinese
    • TAO Fei, ZHANG Lin, GUO Hua, et al. Typical characteristics of cloud manufacturing and several key issues of cloud service composition[J]. Computer Integrated Manufacturing Systems, 2011, 17(3): 477-486(in Chinese).
    • (2011) Computer Integrated Manufacturing Systems , vol.17 , Issue.3 , pp. 477-486
    • Tao, F.1    Zhang, L.2    Guo, H.3
  • 21
    • 68549139973 scopus 로고    scopus 로고
    • Improved genetic algorithm for the fexible Job-shop scheduling problem
    • in Chinese
    • ZHANG Guohui, GAO Liang, LI Peigen, et al. Improved genetic algorithm for the fexible Job-shop scheduling problem[J]. Journal of Mechanical Engineering, 2009, 45(7): 145-151(in Chinese).
    • (2009) Journal of Mechanical Engineering , vol.45 , Issue.7 , pp. 145-151
    • Zhang, G.1    Gao, L.2    Li, P.3
  • 22
    • 84863220890 scopus 로고    scopus 로고
    • A genetic algorithm based on modified selection operator and crossover operator
    • in Chinese
    • CAO Daoyou, CHENG Jiaxing. A genetic algorithm based on modified selection operator and crossover operator[J]. Computer Technology and Development, 2010, 20(2): 45-47, 51(in Chinese).
    • (2010) Computer Technology and Development , vol.20 , Issue.2
    • Cao, D.1    Cheng, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.