메뉴 건너뛰기




Volumn 2012, Issue , 2012, Pages

A hybrid multiobjective evolutionary approach for flexible job-shop scheduling problems

Author keywords

[No Author keywords available]

Indexed keywords

CRITICAL PATHS; CROWDING DISTANCE; EVOLUTIONARY APPROACH; FLEXIBLE JOB-SHOP SCHEDULING PROBLEM; GENETIC OPERATORS; LOCAL SEARCH; MINIMIZING MAKESPAN; MULTI OBJECTIVE; PARETO OPTIMAL SOLUTIONS;

EID: 84866133152     PISSN: 1024123X     EISSN: 15635147     Source Type: Journal    
DOI: 10.1155/2012/478981     Document Type: Article
Times cited : (29)

References (47)
  • 1
    • 0016952078 scopus 로고
    • The complexity of flowshop and job shop scheduling
    • 2-s2.0-0016952078
    • Garey M. R., Johnson D. S., Sethi R., The complexity of flowshop and job shop scheduling. Mathematics of Operations Research 1976 1 2 117 129 2-s2.0-0016952078
    • (1976) Mathematics of Operations Research , vol.1 , Issue.2 , pp. 117-129
    • Garey, M.R.1    Johnson, D.S.2    Sethi, R.3
  • 2
    • 0033102020 scopus 로고    scopus 로고
    • Deterministic job-shop scheduling: Past, present and future
    • 2-s2.0-0033102020
    • Jain A. S., Meeran S., Deterministic job-shop scheduling: past, present and future. European Journal of Operational Research 1999 113 2 390 434 2-s2.0-0033102020
    • (1999) European Journal of Operational Research , vol.113 , Issue.2 , pp. 390-434
    • Jain, A.S.1    Meeran, S.2
  • 3
    • 0025531716 scopus 로고
    • Job-shop scheduling with multi-purpose machines
    • 2-s2.0-0025531716 10.1007/BF02238804
    • Brucker P., Schlie R., Job-shop scheduling with multi-purpose machines. Computing 1990 45 4 369 375 2-s2.0-0025531716 10.1007/BF02238804
    • (1990) Computing , vol.45 , Issue.4 , pp. 369-375
    • Brucker, P.1    Schlie, R.2
  • 4
    • 0036464279 scopus 로고    scopus 로고
    • Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
    • DOI 10.1109/TSMCC.2002.1009117, PII S1094697702046801
    • Kacem I., Hammadi S., Borne P., Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems. IEEE Transactions on Systems, Man and Cybernetics Part C 2002 32 1 1 13 2-s2.0-0036464279 10.1109/TSMCC.2002.1009117 (Pubitemid 34789920)
    • (2002) IEEE Transactions on Systems, Man and Cybernetics Part C: Applications and Reviews , vol.32 , Issue.1 , pp. 1-13
    • Kacem, I.1    Hammadi, S.2    Borne, P.3
  • 5
    • 0037201140 scopus 로고    scopus 로고
    • Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
    • 2-s2.0-0037201140 10.1016/S0378-4754(02)00019-8
    • Kacem I., Hammadi S., Borne P., Pareto-optimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logic. Mathematics and Computers in Simulation 2002 60 35 245 276 2-s2.0-0037201140 10.1016/S0378-4754(02)00019-8
    • (2002) Mathematics and Computers in Simulation , vol.60 , Issue.35 , pp. 245-276
    • Kacem, I.1    Hammadi, S.2    Borne, P.3
  • 6
    • 14044268702 scopus 로고    scopus 로고
    • An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
    • DOI 10.1016/j.cie.2005.01.018, PII S0360835205000197
    • Xia W., Wu Z., An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems. Computers and Industrial Engineering 2005 48 2 409 425 2-s2.0-14044268702 10.1016/j.cie.2005.01.018 (Pubitemid 40274933)
    • (2005) Computers and Industrial Engineering , vol.48 , Issue.2 , pp. 409-425
    • Xia, W.1    Wu, Z.2
  • 8
    • 67349174559 scopus 로고    scopus 로고
    • An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem
    • 2-s2.0-67349174559 10.1016/j.cie.2008.07.021
    • Zhang G., Shao X., Li P., Gao L., An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem. Computers and Industrial Engineering 2009 56 4 1309 1318 2-s2.0-67349174559 10.1016/j.cie.2008.07.021
    • (2009) Computers and Industrial Engineering , vol.56 , Issue.4 , pp. 1309-1318
    • Zhang, G.1    Shao, X.2    Li, P.3    Gao, L.4
  • 9
    • 77049113541 scopus 로고    scopus 로고
    • A multi-swarm approach to multi-objective flexible job-shop scheduling problems
    • 2-s2.0-77049113541 10.3233/FI-2009-160
    • Liu H., Abraham A., Wang Z., A multi-swarm approach to multi-objective flexible job-shop scheduling problems. Fundamenta Informaticae 2009 95 4 465 489 2-s2.0-77049113541 10.3233/FI-2009-160
    • (2009) Fundamenta Informaticae , vol.95 , Issue.4 , pp. 465-489
    • Liu, H.1    Abraham, A.2    Wang, Z.3
  • 10
    • 34447289102 scopus 로고    scopus 로고
    • A hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems
    • DOI 10.1016/j.cie.2007.04.010, PII S0360835207000733
    • Gao J., Gen M., Sun L., Zhao X., A hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems. Computers and Industrial Engineering 2007 53 1 149 162 2-s2.0-34447289102 10.1016/j.cie.2007.04.010 (Pubitemid 47042310)
    • (2007) Computers and Industrial Engineering , vol.53 , Issue.1 , pp. 149-162
    • Gao, J.1    Gen, M.2    Sun, L.3    Zhao, X.4
  • 11
    • 38749142590 scopus 로고    scopus 로고
    • A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems
    • DOI 10.1016/j.cor.2007.01.001, PII S0305054807000020
    • Gao J., Sun L., Gen M., A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems. Computers and Operations Research 2008 35 9 2892 2907 2-s2.0-38749142590 10.1016/j.cor.2007. 01.001 (Pubitemid 351186807)
    • (2008) Computers and Operations Research , vol.35 , Issue.9 , pp. 2892-2907
    • Gao, J.1    Sun, L.2    Gen, M.3
  • 12
    • 53749102032 scopus 로고    scopus 로고
    • Multi-objective flexible job shop schedule: Design and evaluation by simulation modeling
    • 2-s2.0-53749102032 10.1016/j.asoc.2008.04.013
    • Xing L. N., Chen Y. W., Yang K. W., Multi-objective flexible job shop schedule: design and evaluation by simulation modeling. Applied Soft Computing Journal 2009 9 1 362 376 2-s2.0-53749102032 10.1016/j.asoc.2008.04.013
    • (2009) Applied Soft Computing Journal , vol.9 , Issue.1 , pp. 362-376
    • Xing, L.N.1    Chen, Y.W.2    Yang, K.W.3
  • 13
    • 67349126259 scopus 로고    scopus 로고
    • An efficient search method for multi-objective flexible job shop scheduling problems
    • 2-s2.0-67349126259 10.1007/s10845-008-0216-z
    • Xing L. N., Chen Y. W., Yang K. W., An efficient search method for multi-objective flexible job shop scheduling problems. Journal of Intelligent Manufacturing 2009 20 3 283 293 2-s2.0-67349126259 10.1007/s10845-008-0216-z
    • (2009) Journal of Intelligent Manufacturing , vol.20 , Issue.3 , pp. 283-293
    • Xing, L.N.1    Chen, Y.W.2    Yang, K.W.3
  • 14
    • 78049356373 scopus 로고    scopus 로고
    • An effective hybrid tabu search algorithm for multi-objective flexible job-shop scheduling problems
    • 2-s2.0-78049356373 10.1016/j.cie.2010.07.014
    • Li J. Q., Pan Q. K., Liang Y. C., An effective hybrid tabu search algorithm for multi-objective flexible job-shop scheduling problems. Computers and Industrial Engineering 2010 59 4 647 662 2-s2.0-78049356373 10.1016/j.cie.2010.07.014
    • (2010) Computers and Industrial Engineering , vol.59 , Issue.4 , pp. 647-662
    • Li, J.Q.1    Pan, Q.K.2    Liang, Y.C.3
  • 15
    • 75049086134 scopus 로고    scopus 로고
    • An artificial immune algorithm for the flexible job-shop scheduling problem
    • 2-s2.0-75049086134 10.1016/j.future.2009.10.004
    • Bagheri A., Zandieh M., Mahdavi I., Yazdani M., An artificial immune algorithm for the flexible job-shop scheduling problem. Future Generation Computer Systems 2010 26 4 533 541 2-s2.0-75049086134 10.1016/j.future.2009.10. 004
    • (2010) Future Generation Computer Systems , vol.26 , Issue.4 , pp. 533-541
    • Bagheri, A.1    Zandieh, M.2    Mahdavi, I.3    Yazdani, M.4
  • 16
    • 84855798863 scopus 로고    scopus 로고
    • A tabu search algorithm for solving a multicriteria flexible job shop scheduling problem
    • 2-s2.0-84855798863 10.1080/00207543.2010.526016
    • Vilcot G., Billaut J.-C., A tabu search algorithm for solving a multicriteria flexible job shop scheduling problem. International Journal of Production Research 2011 49 23 6963 6980 2-s2.0-84855798863 10.1080/00207543. 2010.526016
    • (2011) International Journal of Production Research , vol.49 , Issue.23 , pp. 6963-6980
    • Vilcot, G.1    Billaut, J.-C.2
  • 17
    • 50649083283 scopus 로고    scopus 로고
    • Solving multiple-objective flexible job shop problems by evolution and local search
    • 2-s2.0-50649083283 10.1109/TSMCC.2008.923888
    • Ho N. B., Tay J. C., Solving multiple-objective flexible job shop problems by evolution and local search. IEEE Transactions on Systems, Man and Cybernetics Part C 2008 38 5 674 685 2-s2.0-50649083283 10.1109/TSMCC.2008. 923888
    • (2008) IEEE Transactions on Systems, Man and Cybernetics Part C , vol.38 , Issue.5 , pp. 674-685
    • Ho, N.B.1    Tay, J.C.2
  • 18
    • 78649788124 scopus 로고    scopus 로고
    • A memetic algorithm based on a NSGAII scheme for the flexible job-shop scheduling problem
    • 2-s2.0-78649788124 10.1007/s10479-010-0751-9
    • Frutos M., Olivera A. C., Tohmé F., A memetic algorithm based on a NSGAII scheme for the flexible job-shop scheduling problem. Annals of Operations Research 2010 181 1 745 765 2-s2.0-78649788124 10.1007/s10479-010- 0751-9
    • (2010) Annals of Operations Research , vol.181 , Issue.1 , pp. 745-765
    • Frutos, M.1    Olivera, A.C.2    Tohmé, F.3
  • 19
    • 0036530772 scopus 로고    scopus 로고
    • A fast and elitist multiobjective genetic algorithm: NSGA-II
    • DOI 10.1109/4235.996017, PII S1089778X02041012
    • Deb K., Pratap A., Agarwal S., Meyarivan T., A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Transactions on Evolutionary Computation 2002 6 2 182 197 2-s2.0-0036530772 10.1109/4235.996017 (Pubitemid 34555372)
    • (2002) IEEE Transactions on Evolutionary Computation , vol.6 , Issue.2 , pp. 182-197
    • Deb, K.1    Pratap, A.2    Agarwal, S.3    Meyarivan, T.4
  • 20
    • 78650179774 scopus 로고    scopus 로고
    • A multi-objective genetic algorithm based on immune and entropy principle for flexible job-shop scheduling problem
    • 2-s2.0-78650179774 10.1007/s00170-010-2642-2
    • Wang X., Gao L., Zhang C., Shao X., A multi-objective genetic algorithm based on immune and entropy principle for flexible job-shop scheduling problem. International Journal of Advanced Manufacturing Technology 2010 51 58 757 767 2-s2.0-78650179774 10.1007/s00170-010-2642-2
    • (2010) International Journal of Advanced Manufacturing Technology , vol.51 , Issue.58 , pp. 757-767
    • Wang, X.1    Gao, L.2    Zhang, C.3    Shao, X.4
  • 21
    • 79961021676 scopus 로고    scopus 로고
    • Pareto-based discrete artificial bee colony algorithm for multi-objective flexible job shop scheduling problems
    • 2-s2.0-79961021676 10.1007/s00170-010-3140-2
    • Li J. Q., Pan Q. K., Gao K. Z., Pareto-based discrete artificial bee colony algorithm for multi-objective flexible job shop scheduling problems. International Journal of Advanced Manufacturing Technology 2011 55 912 1159 1169 2-s2.0-79961021676 10.1007/s00170-010-3140-2
    • (2011) International Journal of Advanced Manufacturing Technology , vol.55 , Issue.912 , pp. 1159-1169
    • Li, J.Q.1    Pan, Q.K.2    Gao, K.Z.3
  • 22
    • 84860470398 scopus 로고    scopus 로고
    • A hybrid Pareto-based local search algorithm for multi-objective flexible job shop scheduling problems
    • 2-s2.0-84860470398 10.1080/00207543.2011.555427
    • Li J.-Q., Pan Q.-K., Chen J., A hybrid Pareto-based local search algorithm for multi-objective flexible job shop scheduling problems. International Journal of Production Research 2012 50 4 1063 1078 2-s2.0-84860470398 10.1080/00207543.2011.555427
    • (2012) International Journal of Production Research , vol.50 , Issue.4 , pp. 1063-1078
    • Li, J.-Q.1    Pan, Q.-K.2    Chen, J.3
  • 23
    • 78649330971 scopus 로고    scopus 로고
    • A Pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search
    • 2-s2.0-78649330971 10.1016/j.ijpe.2010.08.004
    • Moslehi G., Mahnam M., A Pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search. International Journal of Production Economics 2011 129 1 14 22 2-s2.0-78649330971 10.1016/j.ijpe.2010.08.004
    • (2011) International Journal of Production Economics , vol.129 , Issue.1 , pp. 14-22
    • Moslehi, G.1    Mahnam, M.2
  • 24
    • 0002381223 scopus 로고
    • Machine sequencing via disjunctive graphs: An implicit enumeration algorithm
    • Balas E., Machine sequencing via disjunctive graphs: an implicit enumeration algorithm. Operations Research 1969 17 941 957
    • (1969) Operations Research , vol.17 , pp. 941-957
    • Balas, E.1
  • 25
    • 34848886877 scopus 로고    scopus 로고
    • Omni-optimizer: A generic evolutionary algorithm for single and multi-objective optimization
    • DOI 10.1016/j.ejor.2006.06.042, PII S0377221706006291
    • Deb K., Tiwari S., Omni-optimizer: a generic evolutionary algorithm for single and multi-objective optimization. European Journal of Operational Research 2008 185 3 1062 1087 2-s2.0-34848886877 10.1016/j.ejor.2006.06.042 (Pubitemid 47498807)
    • (2008) European Journal of Operational Research , vol.185 , Issue.3 , pp. 1062-1087
    • Deb, K.1    Tiwari, S.2
  • 29
    • 40249118429 scopus 로고    scopus 로고
    • A genetic algorithm for the Flexible Job-shop Scheduling Problem
    • DOI 10.1016/j.cor.2007.02.014, PII S0305054807000524
    • Pezzella F., Morganti G., Ciaschetti G., A genetic algorithm for the Flexible Job-shop Scheduling Problem. Computers and Operations Research 2008 35 10 3202 3212 2-s2.0-40249118429 10.1016/j.cor.2007.02.014 (Pubitemid 351335142)
    • (2008) Computers and Operations Research , vol.35 , Issue.10 , pp. 3202-3212
    • Pezzella, F.1    Morganti, G.2    Ciaschetti, G.3
  • 30
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
    • 2-s2.0-0034559432 10.1016/S0377-2217(99)00485-3
    • Hartmann S., Kolisch R., Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem. European Journal of Operational Research 2000 127 2 394 407 2-s2.0-0034559432 10.1016/S0377-2217(99)00485-3
    • (2000) European Journal of Operational Research , vol.127 , Issue.2 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 31
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • DOI 10.1016/j.ejor.2005.01.065, PII S0377221705002596
    • Kolisch R., Hartmann S., Experimental investigation of heuristics for resource-constrained project scheduling: an update. European Journal of Operational Research 2006 174 1 23 37 2-s2.0-33845270624 10.1016/j.ejor.2005.01. 065 (Pubitemid 44866841)
    • (2006) European Journal of Operational Research , vol.174 , Issue.1 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 32
    • 0030241443 scopus 로고    scopus 로고
    • Genetic algorithms for flowshop scheduling problems
    • DOI 10.1016/0360-8352(96)00053-8
    • Murata T., Ishibuchi H., Tanaka H., Genetic algorithms for flowshop scheduling problems. Computers and Industrial Engineering 1996 30 4 1061 1071 2-s2.0-0030241443 10.1016/0360-8352(96)00053-8 (Pubitemid 126375914)
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.4 , pp. 1061-1071
    • Murata, T.1    Ishibuchi, H.2    Tanaka, H.3
  • 33
    • 0030241820 scopus 로고    scopus 로고
    • Multi-objective genetic algorithm and its applications to flowshop scheduling
    • DOI 10.1016/0360-8352(96)00045-9
    • Murata T., Ishibuchi H., Tanaka H., Multi-objective genetic algorithm and its applications to flowshop scheduling. Computers and Industrial Engineering 1996 30 4 957 968 2-s2.0-0030241820 10.1016/0360-8352(96)00045-9 (Pubitemid 126375906)
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.4 , pp. 957-968
    • Murata, T.1    Ishibuchi, H.2    Tanaka, H.3
  • 34
    • 84859765834 scopus 로고    scopus 로고
    • A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations
    • 786923 2-s2.0-84859765834 10.1155/2012/786923
    • Xiong J., Chen Y.-W., Yang K.-W., Zhao Q.-S., Xing L.-N., A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations. Mathematical Problems in Engineering 2012 2012 24 786923 2-s2.0-84859765834 10.1155/2012/786923
    • (2012) Mathematical Problems in Engineering , vol.2012 , pp. 24
    • Xiong, J.1    Chen, Y.-W.2    Yang, K.-W.3    Zhao, Q.-S.4    Xing, L.-N.5
  • 35
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resource-constrained project scheduling
    • Hartmann S., A competitive genetic algorithm for resource-constrained project scheduling. Naval Research Logistics 1998 45 7 733 750 2-s2.0-0032188522 (Pubitemid 128587349)
    • (1998) Naval Research Logistics , vol.45 , Issue.7 , pp. 733-750
    • Hartmann, S.1
  • 36
    • 33847297058 scopus 로고    scopus 로고
    • A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
    • 2-s2.0-33847297058 10.1016/j.ejor.2006.03.056
    • Shadrokh S., Kianfar F., A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty. European Journal of Operational Research 2007 181 1 86 101 2-s2.0-33847297058 10.1016/j.ejor.2006.03.056
    • (2007) European Journal of Operational Research , vol.181 , Issue.1 , pp. 86-101
    • Shadrokh, S.1    Kianfar, F.2
  • 37
    • 0002595027 scopus 로고
    • A memetic approach for the traveling salesman problem: Implementation of a computational ecology for combinatorial optimization on message-passing systems
    • Amsterdam, The Netherlands
    • Moscato P., Cheng R., A memetic approach for the traveling salesman problem: implementation of a computational ecology for combinatorial optimization on message-passing systems. Proceedings of the International Conference on Parallel Computing and Transputer Applications 1992 Amsterdam, The Netherlands
    • (1992) Proceedings of the International Conference on Parallel Computing and Transputer Applications
    • Moscato, P.1    Cheng, R.2
  • 40
    • 34047181443 scopus 로고    scopus 로고
    • A tabu search algorithm with a new neighborhood structure for the job shop scheduling problem
    • DOI 10.1016/j.cor.2005.12.002, PII S0305054805003989
    • Zhang C., Li P., Guan Z., Rao Y., A tabu search algorithm with a new neighborhood structure for the job shop scheduling problem. Computers and Operations Research 2007 34 11 3229 3242 2-s2.0-34047181443 10.1016/j.cor.2005. 12.002 (Pubitemid 46517853)
    • (2007) Computers and Operations Research , vol.34 , Issue.11 , pp. 3229-3242
    • Zhang, C.1    Li, P.2    Guan, Z.3    Rao, Y.4
  • 41
    • 0038273913 scopus 로고    scopus 로고
    • Balance between genetic search and local search in memetic algorithms for multiobjective permutation flowshop scheduling
    • 2-s2.0-0038273913 10.1109/TEVC.2003.810752
    • Ishibuchi H., Yoshida T., Murata T., Balance between genetic search and local search in memetic algorithms for multiobjective permutation flowshop scheduling. IEEE Transactions on Evolutionary Computation 2003 7 2 204 223 2-s2.0-0038273913 10.1109/TEVC.2003.810752
    • (2003) IEEE Transactions on Evolutionary Computation , vol.7 , Issue.2 , pp. 204-223
    • Ishibuchi, H.1    Yoshida, T.2    Murata, T.3
  • 42
    • 80054693896 scopus 로고    scopus 로고
    • Analysis on the collaboration between global search and local search in memetic computation
    • 6031912 2-s2.0-80054693896 10.1109/TEVC.2011.2150754
    • Lin J.-Y., Chen Y.-P., Analysis on the collaboration between global search and local search in memetic computation. IEEE Transactions on Evolutionary Computation 2011 15 5 608 623 6031912 2-s2.0-80054693896 10.1109/TEVC.2011.2150754
    • (2011) IEEE Transactions on Evolutionary Computation , vol.15 , Issue.5 , pp. 608-623
    • Lin, J.-Y.1    Chen, Y.-P.2
  • 44
    • 77549083772 scopus 로고    scopus 로고
    • Bi-objective group scheduling in hybrid flexible flowshop: A multi-phase approach
    • 2-s2.0-77549083772 10.1016/j.eswa.2009.09.005
    • Karimi N., Zandieh M., Karamooz H. R., Bi-objective group scheduling in hybrid flexible flowshop: a multi-phase approach. Expert Systems with Applications 2010 37 6 4024 4032 2-s2.0-77549083772 10.1016/j.eswa.2009.09.005
    • (2010) Expert Systems with Applications , vol.37 , Issue.6 , pp. 4024-4032
    • Karimi, N.1    Zandieh, M.2    Karamooz, H.R.3
  • 45
    • 84873710072 scopus 로고    scopus 로고
    • Developing two multi-objective evolutionary algorithms for the multi-objective flexible job shop scheduling problem
    • In press 2-s2.0-84858596898 10.1007/s00170-012-4051-1
    • Rahmati S. H. A., Zandieh M., Yazdani M., Developing two multi-objective evolutionary algorithms for the multi-objective flexible job shop scheduling problem. International Journal of Advanced Manufacturing Technology. In press 2-s2.0-84858596898 10.1007/s00170-012-4051-1
    • International Journal of Advanced Manufacturing Technology
    • Rahmati, S.H.A.1    Zandieh, M.2    Yazdani, M.3
  • 46
    • 34250084648 scopus 로고
    • Routing and scheduling in a flexible job shop by tabu search
    • 2-s2.0-34250084648 10.1007/BF02023073
    • Brandimarte P., Routing and scheduling in a flexible job shop by tabu search. Annals of Operations Research 1993 41 3 157 183 2-s2.0-34250084648 10.1007/BF02023073
    • (1993) Annals of Operations Research , vol.41 , Issue.3 , pp. 157-183
    • Brandimarte, P.1
  • 47
    • 84862829861 scopus 로고    scopus 로고
    • An effective shuffled frog-leaping algorithm for multi-objective flexible job shop scheduling problems
    • 2-s2.0-84860437097 10.1016/j.amc.2012.03.018
    • Li J., Pan Q., Xie S., An effective shuffled frog-leaping algorithm for multi-objective flexible job shop scheduling problems. Applied Mathematics and Computation 2012 218 18 9353 9371 2-s2.0-84860437097 10.1016/j.amc.2012.03.018
    • (2012) Applied Mathematics and Computation , vol.218 , Issue.18 , pp. 9353-9371
    • Li, J.1    Pan, Q.2    Xie, S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.