Product design for improved material flow - A multi-storey timber housing project

Author keywords

Assembly; Logistics; Multi Storey Timber housing; Prefabrication; Standardization

Indexed keywords

BUILDING PRODUCTS; CONTROL FLOWS; DESIGN DECISIONS; EMPIRICAL DATA; FLOW OF MATERIAL; HOUSING CONSTRUCTION; INDUSTRIAL CONSTRUCTION; INDUSTRIAL PROCESSS; LEARNING CYCLE; MATERIAL FLOW; PREFABRICATION; PRODUCTION ISSUES; REDUCTION OF ERRORS; STANDARDIZATION PROCESS; TIMBER HOUSING;

EID: 84866109705     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (10)

References (18)
  • 3
    • 84866083432 scopus 로고    scopus 로고
    • Benefits and disadvantages of erp in industrialised timber frame housing in sweden
    • Mgmt. and Econ. 2004
    • Bergström, M. and Stehn, L. (2004). "Benefits and Disadvantages of ERP in Industrialised Timber Frame Housing in Sweden." Submit-ted for publication in Constr. Mgmt. and Econ., 2004.
    • (2004) Submit-ted for Publication in Constr
    • Bergström, M.1    Stehn, L.2
  • 5
    • 84987665794 scopus 로고    scopus 로고
    • Lean Construction: Where are we and how to proceed?
    • Bertelsen, S. (2004). "Lean Construction: Where are we and how to proceed?" Lean Construction Journal, 1(1) 46-69.
    • (2004) Lean Construction Journal , vol.1 , Issue.1 , pp. 46-69
    • Bertelsen, S.1
  • 8
    • 0032094010 scopus 로고    scopus 로고
    • Construction as a Manufacturing Process: Lessons from the Automotive Industry
    • Crowley, A. (1998). "Construction as a Manufacturing Process: Lessons from the Automotive Industry." Computers and Structures, 67(5) 389-400.
    • (1998) Computers and Structures , vol.67 , Issue.5 , pp. 389-400
    • Crowley, A.1
  • 9
    • 0036812951 scopus 로고    scopus 로고
    • The Construction Industry as a Loosely Coupled System
    • Dubois, A. and Gadde, L-E. (2002). "The Construction Industry as a Loosely Coupled System." Construction Management and Economics. 20(7) 621-631.
    • (2002) Construction Management and Economics , vol.20 , Issue.7 , pp. 621-631
    • Dubois, A.1    Gadde, L.-E.2
  • 10
    • 0000683034 scopus 로고    scopus 로고
    • Standardization and Pre-assembly-Distinguishing Myth from Reality Using Case Study Research
    • Gibb, A. (2001). "Standardization and Pre-assembly-Distinguishing Myth from Reality Using Case Study Research." Construction Management and Information. 19(3) 8pp.
    • (2001) Construction Management and Information , vol.19 , Issue.3 , pp. 8
    • Gibb, A.1
  • 12
    • 0037367928 scopus 로고    scopus 로고
    • Is structural change the primary solution to the problems of construction?
    • Koskela, L. (2003). "Is Structural Change the Primary Solution to the Problems of Construction?" Building Research & Information, 31(2) 85-96.
    • (2003) Building Research & Information , vol.31 , Issue.2 , pp. 85-96
    • Koskela, L.1
  • 13
    • 0033729711 scopus 로고    scopus 로고
    • Benchmarking the lean enterprise: organizational learning at work
    • Knuf, J. (2000). "Benchmarking the Lean Enterprise: Organizational Learning at Work" Journal of Management in Engineering, 16(4) 58-71.
    • (2000) Journal of Management in Engineering , vol.16 , Issue.4 , pp. 58-71
    • Knuf, J.1
  • 14
    • 0012763346 scopus 로고    scopus 로고
    • An innovative supply chain strategy for customized housing
    • Naim, M. and Barlow, J. (2003). "An Innovative Supply Chain Strategy for Customized Housing." Construction Management and Economics. 21(6) 593-602.
    • (2003) Construction Management and Economics , vol.21 , Issue.6 , pp. 593-602
    • Naim, M.1    Barlow, J.2
  • 15
    • 0036140878 scopus 로고    scopus 로고
    • The evidence of complex variability in construction labour productivity
    • Radosavljevic, M. and Horner, W. (2002). "The Evidence of Complex Variability in Construction Labour Productivity." Construction Management and Economics. 20(1) 3-12.
    • (2002) Construction Management and Economics , vol.20 , Issue.1 , pp. 3-12
    • Radosavljevic, M.1    Horner, W.2
  • 17
    • 0037062522 scopus 로고    scopus 로고
    • Integrated design and production of multi-storey timber frame houses
    • Stehn, L. and Bergström, M. (2002). "Integrated Design and Production of Multi-Storey Timber Frame Houses." International. Journal of Production Economics, 77(3), 259-269.
    • (2002) International. Journal of Production Economics , vol.77 , Issue.3 , pp. 259-269
    • Stehn, L.1    Bergström, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.