메뉴 건너뛰기




Volumn 17, Issue 3-4, 2010, Pages 63-84

An analytic network process-based approach for location problems: The case of a new waste incinerator plant in the province of torino (Italy)

Author keywords

Analytic Network Process; BOCR model; Decision making; Environmental indicators; Multicriteria Analysis; Waste management

Indexed keywords


EID: 84865226596     PISSN: 10579214     EISSN: 10991360     Source Type: Journal    
DOI: 10.1002/mcda.456     Document Type: Article
Times cited : (41)

References (61)
  • 1
    • 33748693686 scopus 로고    scopus 로고
    • Modelling the metrics of lean, agile and leagile supply chain: an ANP-based approach
    • Agarwal A, Shankar R, Tiwari MK. 2006. Modelling the metrics of lean, agile and leagile supply chain: an ANP-based approach. European Journal of Operational Research 173(1): 211–225.
    • (2006) European Journal of Operational Research , vol.173 , Issue.1 , pp. 211-225
    • Agarwal, A.1    Shankar, R.2    Tiwari, M.K.3
  • 3
    • 85040393106 scopus 로고    scopus 로고
    • 2008. Studio di localizzazione del termovalorizzatore della zona nord della provincia di Torino [Downloaded from the website, Accessed on 20th April
    • Associazione d'ambito Torinese per il governo dei Rifiuti (ATOR). 2008. Studio di localizzazione del termovalorizzatore della zona nord della provincia di Torino [Downloaded from the website: http://www.atorifiutitorinese.it/index.php?option=com_content&task=view&id=81&Itemid=95. Accessed on 20th April 2010].
    • (2010)
  • 4
    • 33947434493 scopus 로고    scopus 로고
    • An analytic network process-based approach to concept evaluation in a new product development environment
    • Ayag Z, Özdemir RG. 2007. An analytic network process-based approach to concept evaluation in a new product development environment. Journal of Engineering Design 18(3): 209–226.
    • (2007) Journal of Engineering Design , vol.18 , Issue.3 , pp. 209-226
    • Ayag, Z.1    Özdemir, R.G.2
  • 5
    • 0030472177 scopus 로고    scopus 로고
    • Life cycle assessment for waste management
    • Barton JR, Dalley D, Patel VS. 1996. Life cycle assessment for waste management. Waste Management 16(1–3): 35–50.
    • (1996) Waste Management , vol.16 , Issue.1-3 , pp. 35-50
    • Barton, J.R.1    Dalley, D.2    Patel, V.S.3
  • 6
    • 77956134607 scopus 로고    scopus 로고
    • Integrating the analytic network process (ANP) and the driving force-pressure-state-impact-responses (DPSIR) model for the sustainability assessment of territorial transformations
    • Bottero M, Ferretti V. 2010. Integrating the analytic network process (ANP) and the driving force-pressure-state-impact-responses (DPSIR) model for the sustainability assessment of territorial transformations. International Journal of Management of Environmental Quality 21(5): 618–644.
    • (2010) International Journal of Management of Environmental Quality , vol.21 , Issue.5 , pp. 618-644
    • Bottero, M.1    Ferretti, V.2
  • 8
    • 53349175029 scopus 로고    scopus 로고
    • An appraisal of analytic network process and its role in sustainability assessment in Northern Italy
    • Bottero M, Mondini G. 2008. An appraisal of analytic network process and its role in sustainability assessment in Northern Italy. International Journal of Management of Environmental Quality 19(6): 642–660.
    • (2008) International Journal of Management of Environmental Quality , vol.19 , Issue.6 , pp. 642-660
    • Bottero, M.1    Mondini, G.2
  • 10
    • 84973876663 scopus 로고    scopus 로고
    • A multiple-criteria decision-making approach for the evaluation of retail location
    • Burnaz S, Topcu YI. 2006. A multiple-criteria decision-making approach for the evaluation of retail location. Journal of Multi-Criteria Decision Analysis 14(1): 67–76.
    • (2006) Journal of Multi-Criteria Decision Analysis , vol.14 , Issue.1 , pp. 67-76
    • Burnaz, S.1    Topcu, Y.I.2
  • 12
    • 38549136571 scopus 로고    scopus 로고
    • Combining GIS with fuzzy multicriteria decision-making for landfill siting in a fast-growing urban region
    • Chang NB, Parvathinathan G, Breeden JB. 2008. Combining GIS with fuzzy multicriteria decision-making for landfill siting in a fast-growing urban region. Journal of Environmental Management 87(1): 139–153.
    • (2008) Journal of Environmental Management , vol.87 , Issue.1 , pp. 139-153
    • Chang, N.B.1    Parvathinathan, G.2    Breeden, J.B.3
  • 13
    • 47249122241 scopus 로고    scopus 로고
    • Analytic hierarchy process helps select site for limestone quarry expansion in Barbados
    • Dey PK, Ramcharan EK. 2008. Analytic hierarchy process helps select site for limestone quarry expansion in Barbados. Journal of Environmental Management 88(4): 1384–1395.
    • (2008) Journal of Environmental Management , vol.88 , Issue.4 , pp. 1384-1395
    • Dey, P.K.1    Ramcharan, E.K.2
  • 16
    • 37449021283 scopus 로고    scopus 로고
    • Multicriteria decision support using rules that represent rough-graded preference relations
    • Fortemps P, Greco S, Slowinski R. 2008. Multicriteria decision support using rules that represent rough-graded preference relations. European Journal of Operational Research 188(1): 206–223.
    • (2008) European Journal of Operational Research , vol.188 , Issue.1 , pp. 206-223
    • Fortemps, P.1    Greco, S.2    Slowinski, R.3
  • 19
    • 0010879212 scopus 로고
    • A computational model for solid waste management with application
    • Gottinger HW. 1988. A computational model for solid waste management with application. European Journal of Operational Research 35: 350–364.
    • (1988) European Journal of Operational Research , vol.35 , pp. 350-364
    • Gottinger, H.W.1
  • 22
    • 0031121949 scopus 로고    scopus 로고
    • Choosing a solid waste management system using multicriteria decision analysis
    • Hokkanen J, Salminen P. 1997. Choosing a solid waste management system using multicriteria decision analysis. European Journal of Operational Research 98: 19–36.
    • (1997) European Journal of Operational Research , vol.98 , pp. 19-36
    • Hokkanen, J.1    Salminen, P.2
  • 23
    • 33748259237 scopus 로고    scopus 로고
    • Selection of logistics service provider: an analytic network process (ANP) approach
    • Jharkharia S, Shankar R. 2007. Selection of logistics service provider: an analytic network process (ANP) approach. Omega—The International Journal of Management Science 35(3): 274–289.
    • (2007) Omega—The International Journal of Management Science , vol.35 , Issue.3 , pp. 274-289
    • Jharkharia, S.1    Shankar, R.2
  • 24
    • 63449088915 scopus 로고    scopus 로고
    • Participatory diagnosis in urban planning: proposal for a learning process based on geographical information
    • Joerin F, Desthieux G, Beuze SB, Nembrini A. 2009. Participatory diagnosis in urban planning: proposal for a learning process based on geographical information. Journal of Environmental Management90: 2002–2011.
    • (2009) Journal of Environmental Management , vol.90 , pp. 2002-2011
    • Joerin, F.1    Desthieux, G.2    Beuze, S.B.3    Nembrini, A.4
  • 25
    • 1042287191 scopus 로고    scopus 로고
    • Use of chemometrics methods and multicriteria decision-making for site selection for sustainable onsite sewage effluent disposal
    • Khalil W, Goonetilleke A, Kokot S, Carroll S. 2004. Use of chemometrics methods and multicriteria decision-making for site selection for sustainable onsite sewage effluent disposal. Analytica Chimica Acta 506(1): 41–56.
    • (2004) Analytica Chimica Acta , vol.506 , Issue.1 , pp. 41-56
    • Khalil, W.1    Goonetilleke, A.2    Kokot, S.3    Carroll, S.4
  • 26
    • 45849113692 scopus 로고    scopus 로고
    • An analytic network process model for municipal solid waste disposal options
    • Khan S, Faisal MN. 2008. An analytic network process model for municipal solid waste disposal options. Waste Management 28(9): 1500–1508.
    • (2008) Waste Management , vol.28 , Issue.9 , pp. 1500-1508
    • Khan, S.1    Faisal, M.N.2
  • 27
    • 54849430256 scopus 로고    scopus 로고
    • Enterprise information system project selection with regard to BOCR
    • Liang C, Li Q. 2008. Enterprise information system project selection with regard to BOCR. International Journal of Project Management 26(8): 810–820.
    • (2008) International Journal of Project Management , vol.26 , Issue.8 , pp. 810-820
    • Liang, C.1    Li, Q.2
  • 28
    • 58349111146 scopus 로고    scopus 로고
    • Decision-support for environmental impact assessment: a hybrid approach using fuzzy logic and fuzzy analytic network process
    • Liu KFR, Lai JH. 2009. Decision-support for environmental impact assessment: a hybrid approach using fuzzy logic and fuzzy analytic network process. Expert Systems With Applications 36(3): 5119–5136.
    • (2009) Expert Systems With Applications , vol.36 , Issue.3 , pp. 5119-5136
    • Liu, K.F.R.1    Lai, J.H.2
  • 31
    • 39749093168 scopus 로고
    • The magical number seven, plus or minus two: some limits on our capacity for processing information
    • Miller GA. 1956. The magical number seven, plus or minus two: some limits on our capacity for processing information. Psychological Review 63: 81–97.
    • (1956) Psychological Review , vol.63 , pp. 81-97
    • Miller, G.A.1
  • 32
    • 1542375399 scopus 로고    scopus 로고
    • Waste management models and their application to sustainable waste management
    • Morrissey AJ, Browne J. 2004. Waste management models and their application to sustainable waste management. Waste Management 24: 297–308.
    • (2004) Waste Management , vol.24 , pp. 297-308
    • Morrissey, A.J.1    Browne, J.2
  • 33
    • 33744823280 scopus 로고    scopus 로고
    • Analytic network process model for landslide hazard zonation
    • Neaupane KM, Piantanakulchai M. 2006. Analytic network process model for landslide hazard zonation. Engineering Geology 85(3/4): 281–294.
    • (2006) Engineering Geology , vol.85 , Issue.3-4 , pp. 281-294
    • Neaupane, K.M.1    Piantanakulchai, M.2
  • 34
    • 13844312313 scopus 로고    scopus 로고
    • An analytic network process model for financial-crisis forecasting
    • Niemura MP, Saaty TL. 2004. An analytic network process model for financial-crisis forecasting. International Journal of Forecasting 20(4): 573–587.
    • (2004) International Journal of Forecasting , vol.20 , Issue.4 , pp. 573-587
    • Niemura, M.P.1    Saaty, T.L.2
  • 35
    • 30444437882 scopus 로고    scopus 로고
    • ELECTRE III as a support for participatory decision-making on the localization of waste-treatment plants
    • Norese MF. 2006. ELECTRE III as a support for participatory decision-making on the localization of waste-treatment plants. Land Use Policy 23(1): 76–85.
    • (2006) Land Use Policy , vol.23 , Issue.1 , pp. 76-85
    • Norese, M.F.1
  • 36
    • 85040436239 scopus 로고    scopus 로고
    • 2005., Proceedings of the 8th International Symposium on the Analytic Hierarchy Process, Honolulu, 8–10 July 2005
    • Piantanakulchai M. 2005. Analytic network process model for highway corridor planning. Proceedings of the 8th International Symposium on the Analytic Hierarchy Process, Honolulu, 8–10 July 2005.
    • Analytic network process model for highway corridor planning
    • Piantanakulchai, M.1
  • 37
    • 46249093343 scopus 로고    scopus 로고
    • Are consensus democracies more environmentally effective?
    • Poloni-Staudinger LM. 2008. Are consensus democracies more environmentally effective? Environmental Politics 17(3): 410–430.
    • (2008) Environmental Politics , vol.17 , Issue.3 , pp. 410-430
    • Poloni-Staudinger, L.M.1
  • 38
    • 33750291741 scopus 로고    scopus 로고
    • Evaluation of remedial countermeasures using the analytic network process
    • Promentilla MAB, Furuichi T, Ishii K, Tanikawa N. 2006. Evaluation of remedial countermeasures using the analytic network process. Waste Management 26(12): 1410–1421.
    • (2006) Waste Management , vol.26 , Issue.12 , pp. 1410-1421
    • Promentilla, M.A.B.1    Furuichi, T.2    Ishii, K.3    Tanikawa, N.4
  • 39
  • 40
    • 77956226978 scopus 로고    scopus 로고
    • An integrated analytic network process with mixed-integer non-linear programming to supplier selection and order allocation
    • Razmi J, Rafiei R. 2009. An integrated analytic network process with mixed-integer non-linear programming to supplier selection and order allocation. The International Journal of Advanced Manufacturing Technology. DOI: 10.1007/s00170-1009-2445-5.
    • (2009) The International Journal of Advanced Manufacturing Technology
    • Razmi, J.1    Rafiei, R.2
  • 42
    • 85040429533 scopus 로고    scopus 로고
    • Algorithmic decision theory
    • (eds)., ADT 2009, Venice, 20–23 October 2009., Springer Verlag, Berlin
    • Rossi F, Tsoukias A (eds). 2009. Algorithmic decision theory. Proceedings of the First International Conference, ADT 2009, Venice, 20–23 October 2009. Springer Verlag: Berlin.
    • (2009) Proceedings of the First International Conference
    • Rossi, F.1    Tsoukias, A.2
  • 47
    • 24944530823 scopus 로고    scopus 로고
    • Rank from comparisons and from ratings in the analytic hierarchy/network processes
    • Saaty TL. 2006. Rank from comparisons and from ratings in the analytic hierarchy/network processes. European Journal of Operational Research 168: 557–570.
    • (2006) European Journal of Operational Research , vol.168 , pp. 557-570
    • Saaty, T.L.1
  • 50
    • 84907663082 scopus 로고    scopus 로고
    • Design and development of a planning support system for policy formulation in water resources rehabilitation: the case of Alcazar De San Juan district in Aquifer 23, La Mancha, Spain
    • Sharifi MA, Rodriguez E. 2002. Design and development of a planning support system for policy formulation in water resources rehabilitation: the case of Alcazar De San Juan district in Aquifer 23, La Mancha, Spain. Journal of Hydroinformatics 4(3): 157–175.
    • (2002) Journal of Hydroinformatics , vol.4 , Issue.3 , pp. 157-175
    • Sharifi, M.A.1    Rodriguez, E.2
  • 53
    • 1542353826 scopus 로고
    • A comprehensive costing methodology for the assessment of solid waste management alternatives
    • Smith DG, Baetz BW. 1991. A comprehensive costing methodology for the assessment of solid waste management alternatives. Journal of Resource Management and Technology 19(4): 140–147.
    • (1991) Journal of Resource Management and Technology , vol.19 , Issue.4 , pp. 140-147
    • Smith, D.G.1    Baetz, B.W.2
  • 55
    • 0034111587 scopus 로고    scopus 로고
    • EFECT—evaluation framework of environmental impacts and costs of transport initiatives
    • Tsamboulas D, Mikroudis G. 2000. EFECT—evaluation framework of environmental impacts and costs of transport initiatives. Transportation Research 5: 283–303.
    • (2000) Transportation Research , vol.5 , pp. 283-303
    • Tsamboulas, D.1    Mikroudis, G.2
  • 57
    • 44949119329 scopus 로고    scopus 로고
    • A fuzzy analytic network process based approach to transportation-mode selection between Turkey and Germany: a case study
    • Tuzkaya U, Onut S. 2008. A fuzzy analytic network process based approach to transportation-mode selection between Turkey and Germany: a case study. Information Sciences 178(15): 3133–3146.
    • (2008) Information Sciences , vol.178 , Issue.15 , pp. 3133-3146
    • Tuzkaya, U.1    Onut, S.2
  • 58
    • 48949118500 scopus 로고    scopus 로고
    • An analytic network process approach for locating undesirable facilities: an example from Istanbul, Turkey
    • Tuzkaya G, Önüt S, Tuzkaya UR, Gülsün B. 2007. An analytic network process approach for locating undesirable facilities: an example from Istanbul, Turkey. Journal of Environmental Management 88: 970–983.
    • (2007) Journal of Environmental Management , vol.88 , pp. 970-983
    • Tuzkaya, G.1    Önüt, S.2    Tuzkaya, U.R.3    Gülsün, B.4
  • 59
    • 7544241890 scopus 로고    scopus 로고
    • Determination of the appropriate energy policy for Turkey
    • Ulutas BH. 2005. Determination of the appropriate energy policy for Turkey. Energy 30(7): 1146–1161.
    • (2005) Energy , vol.30 , Issue.7 , pp. 1146-1161
    • Ulutas, B.H.1
  • 60
    • 34548133028 scopus 로고    scopus 로고
    • Analysis of benefits, opportunities, costs, and risks (BOCR) with the AHP–ANP: a critical validation
    • Wijnmalen DJD. 2007. Analysis of benefits, opportunities, costs, and risks (BOCR) with the AHP–ANP: a critical validation. Mathematical and Computer Modelling 46(7/8): 892–905.
    • (2007) Mathematical and Computer Modelling , vol.46 , Issue.7-8 , pp. 892-905
    • Wijnmalen, D.J.D.1
  • 61
    • 42649110394 scopus 로고    scopus 로고
    • Evaluating sustainable forest management strategies with the analytic network process in a pressure-state-response framework
    • Wolfslehner B., Vacik H. 2008. Evaluating sustainable forest management strategies with the analytic network process in a pressure-state-response framework. Journal of Environmental Management 88(1): 1–10.
    • (2008) Journal of Environmental Management , vol.88 , Issue.1 , pp. 1-10
    • Wolfslehner, B.1    Vacik, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.