-
1
-
-
47249112532
-
Trends of skills and productivity in the UK construction industry. Engineering
-
doi:10.1108/09699980810886865
-
Abdel-Wahab, M.S., Dainty, A.R.J., Ison, S.G., Bowen, P., and Hazlehurst, G. 2008. Trends of skills and productivity in the UK construction industry. Engineering, Construction, and Architectural Management, 15(4): 372-382. doi:10.1108/09699980810886865.
-
(2008)
Construction, and Architectural Management
, vol.15
, Issue.4
, pp. 372-382
-
-
Abdel-Wahab, M.S.1
Dainty, A.R.J.2
Ison, S.G.3
Bowen, P.4
Hazlehurst, G.5
-
2
-
-
84865247322
-
-
M.A.Sc. thesis, Department of Civil and Environmental Engineering, University of Waterloo, Waterloo, Ont
-
Ahmed, H. 2011. Analysis of Building Sector Construction Productivity Trends in North America between 1995 and 2009. M.A.Sc. thesis, Department of Civil and Environmental Engineering, University of Waterloo, Waterloo, Ont.
-
(2011)
Analysis of Building Sector Construction Productivity Trends In North America Between 1995 and 2009
-
-
Ahmed, H.1
-
4
-
-
84865210936
-
Measuring the performance of the Canadian construction industry
-
CCIC, Metrics Report, Toronto, Ont. Canada. Available from
-
CCIC. 2006. Measuring the performance of the Canadian construction industry. Metrics Report. Canadian Construction Innovation Council, Toronto, Ont. Canada. Available from http://www.ccic-ccic.ca/reports.html
-
(2006)
Canadian Construction Innovation Council
-
-
-
5
-
-
77956714649
-
-
CII, Construction Industry Institute, The Univ. of Texas at Austin, Austin, Tex
-
CII. 2000. CII benchmarking and metrics data report 2000,Construction Industry Institute, The Univ. of Texas at Austin, Austin, Tex.
-
(2000)
CII Benchmarking and Metrics Data Report 2000
-
-
-
6
-
-
77951290029
-
-
Institutional site, Accessed on 27 September 2010
-
Constructing Excellence. 2004. Institutional site. http://www.constructingexcellence.org.uk. Accessed on 27 September 2010.
-
(2004)
Constructing Excellence
-
-
-
7
-
-
33748795062
-
Benchmarking initiatives in the construction industry: Lessons learned and improvement opportunities
-
doi:10.1061/, (ASCE)0742-597X(2006)22:4(158
-
Costa, D.B., Formoso, C.T., Kagioglou, M., Alarcon, L.F., and Caldas, C.H. 2006. Benchmarking initiatives in the construction industry: Lessons learned and improvement opportunities. Journal of Management Engineering, 22(4): 158-167. doi:10.1061/(ASCE)0742-597X(2006)22:4(158).
-
(2006)
Journal of Management Engineering
, vol.22
, Issue.4
, pp. 158-167
-
-
Costa, D.B.1
Formoso, C.T.2
Kagioglou, M.3
Alarcon, L.F.4
Caldas, C.H.5
-
8
-
-
33845772842
-
Management of construction firm using benchmarking
-
doi:10.1061/(ASCE)0742-597X(2007)23:1(10)
-
El-Mashaleh, M.S., Minchin, R.E., and O'Brien, W.J. 2007. Management of construction firm using benchmarking. Journal of Management Engineering, 23(1): 10-17. doi:10.1061/(ASCE)0742-597X(2007)23:1(10).
-
(2007)
Journal of Management Engineering
, vol.23
, Issue.1
, pp. 10-17
-
-
El-Mashaleh, M.S.1
Minchin, R.E.2
O'Brien, W.J.3
-
9
-
-
77956298480
-
-
phase 1, CSC-CBR Technical Report P1-T12, Ottawa, Ontario, Canada
-
Fayek, A., Hass, C., Rankin, J., and Russell, A. 2008. Benchmarking program overview: CSC performance and productivity bench-marking program, phase 1, CSC-CBR Technical Report P1-T12, Ottawa, Ontario, Canada, 23 pp.
-
(2008)
Benchmarking Program Overview: CSC Performance and Productivity Bench-marking Program
, pp. 23
-
-
Fayek, A.1
Hass, C.2
Rankin, J.3
Russell, A.4
-
10
-
-
0029203834
-
Benchmarking in construction industry
-
doi:10.1061/(ASCE)0742-597X(1995)11:1(50)
-
Fisher, D., Miertschin, S., and Pollock, D.R., Jr. 1995. Benchmarking in construction industry. Journal of Management Engineering, 11(1): 50-57. doi:10.1061/(ASCE)0742-597X(1995)11:1(50).
-
(1995)
Journal of Management Engineering
, vol.11
, Issue.1
, pp. 50-57
-
-
Fisher, D.1
Miertschin, S.2
Pollock Jr., D.R.3
-
11
-
-
2342443555
-
Partial factor productivity and equipment technology change at activity level in U.S. construction industry
-
doi:10.1061/(ASCE)0733-9364(2002)128:6(463)
-
Goodrum, P.M., and Haas, C.T. 2002. Partial factor productivity and equipment technology change at activity level in U.S. construction industry. Journal of Construction Engineering and Management, 128(6): 463-472. doi:10.1061/(ASCE)0733-9364(2002)128:6(463).
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.6
, pp. 463-472
-
-
Goodrum, P.M.1
Haas, C.T.2
-
12
-
-
0036648366
-
The divergence in aggregate and activity estimates of U.S. construction productivity
-
doi:10.1080/01446190210145868
-
Goodrum, P., Haas, C., and Glover, R. 2002. The divergence in aggregate and activity estimates of U.S. construction productivity. Journal of Construction Management and Economics, 20(5): 415-423. doi:10.1080/01446190210145868.
-
(2002)
Journal of Construction Management and Economics
, vol.20
, Issue.5
, pp. 415-423
-
-
Goodrum, P.1
Haas, C.2
Glover, R.3
-
13
-
-
62549118247
-
The relationship between changes in material technology and construction productivity
-
doi:10.1061/(ASCE)0733-9364(2009)135:4(278)
-
Goodrum, P., Zhai, D., and Yasin, M. 2009. The relationship between changes in material technology and construction productivity. Journal of Construction Engineering and Management, 135(4): 278-287. doi:10.1061/(ASCE)0733-9364(2009)135:4(278).
-
(2009)
Journal of Construction Engineering and Management
, vol.135
, Issue.4
, pp. 278-287
-
-
Goodrum, P.1
Zhai, D.2
Yasin, M.3
-
14
-
-
84859916873
-
Can measurement error explain the weakness of productivity growth in the Canadian construction industry?
-
Research Report No. 2007-01. Ottawa, Ontario
-
Harrison, P. 2007. Can measurement error explain the weakness of productivity growth in the Canadian construction industry? Centre for the Study of Living Standards (CSLS), Research Report No. 2007-01. Ottawa, Ontario.
-
(2007)
Centre For the Study of Living Standards (CSLS)
-
-
Harrison, P.1
-
15
-
-
84865215439
-
-
Available at, About-Us Accessed on 18 October 2010
-
Independent Project Analysis (IPA). 2010. Available at http://www.ipaglobal.com/About-Us Accessed on 18 October 2010.
-
(2010)
Independent Project Analysis (IPA)
-
-
-
16
-
-
84855816149
-
Performance of the Canadian construction industry-A benchmarking pilot
-
Meade, G., Rankin, J., and Manseau, A. 2006. Performance of the Canadian construction industry-A benchmarking pilot. Canadian Civil Engineer, 23(4): 8-11.
-
(2006)
Canadian Civil Engineer
, vol.23
, Issue.4
, pp. 8-11
-
-
Meade, G.1
Rankin, J.2
Manseau, A.3
-
17
-
-
63049088452
-
Studies in construction performance benchmarking
-
Québec City, Quebec, Canada, 10-13 June 2008
-
Nasir, H., Dorji, U., Attalla, M., Rankin, J., Fayek, A.R., and Haas, C. 2008. Studies in construction performance benchmarking. In Proceedings of Annual Conference of the Canadian Society for Civil Engineering, Québec City, Quebec, Canada, 10-13 June 2008. pp. 136-145.
-
(2008)
Proceedings of Annual Conference of the Canadian Society For Civil Engineering
, pp. 136-145
-
-
Nasir, H.1
Dorji, U.2
Attalla, M.3
Rankin, J.4
Fayek, A.R.5
Haas, C.6
-
18
-
-
84865274884
-
-
National Research Council (NRC), construction industry. The National Academies Press, Washington, D.C
-
National Research Council (NRC). 2009. Advancing the competitiveness and efficiency of the U.S. construction industry. The National Academies Press, Washington, D.C.
-
(2009)
Advancing the Competitiveness and Efficiency of the U.S
-
-
-
19
-
-
23044480215
-
Benchmarking of construction productivity
-
doi:10.1061/(ASCE)0733-9364(2005)131:7(772)
-
Park, H.S., Thomas, S.R., and Tucker, R.L. 2005. Benchmarking of construction productivity. Journal of Construction Engineering and Management, 131(7): 772-778. doi:10.1061/(ASCE)0733-9364(2005)131:7(772).
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.7
, pp. 772-778
-
-
Park, H.S.1
Thomas, S.R.2
Tucker, R.L.3
-
20
-
-
52149123885
-
Initial metrics and pilot program results for measuring the performance of the Canadian construction industry
-
doi:10.1139/L08-018
-
Rankin, J., Fayek, A.R., Meade, G., Haas, C., and Manseau, A. 2008. Initial metrics and pilot program results for measuring the performance of the Canadian construction industry. Canadian Journal of Civil Engineering, 35(9): 894-907. doi:10.1139/L08-018.
-
(2008)
Canadian Journal of Civil Engineering
, vol.35
, Issue.9
, pp. 894-907
-
-
Rankin, J.1
Fayek, A.R.2
Meade, G.3
Haas, C.4
Manseau, A.5
-
21
-
-
0004180820
-
The benchmarking book
-
American Management Association, New York
-
Spendolini, M.J. 1992. The benchmarking book. AMACOM, American Management Association, New York.
-
(1992)
AMACOM
-
-
Spendolini, M.J.1
-
22
-
-
0035454709
-
Discussion of U.S. construction labor productivity trends, 1970-1998
-
doi:10.1061/(ASCE)0733-9364(2001)127:5(427)
-
Teicholz, P., Goodrum, P.M., and Haas, C.T. 2001. Discussion of "U.S. construction labor productivity trends, 1970-1998". Journal of Construction Engineering and Management, 127(5): 427-429. doi:10.1061/(ASCE)0733-9364(2001)127:5(427).
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.5
, pp. 427-429
-
-
Teicholz, P.1
Goodrum, P.M.2
Haas, C.T.3
-
24
-
-
3142680315
-
Study concludes productivity is up, just not enough
-
McGraw Hill
-
Tuchman, J. 2004. Study concludes productivity is up, just not enough. Engineering News Record. McGraw Hill. 253(1). p. 18.
-
(2004)
Engineering News Record
, vol.253
, Issue.1
, pp. 18
-
-
Tuchman, J.1
|