메뉴 건너뛰기




Volumn 135, Issue 4, 2009, Pages 278-287

Relationship between changes in material technology and construction productivity

Author keywords

Construction industry; Construction materials; Productivity; Regression analysis; Technology assessment

Indexed keywords

CONSTRUCTION ACTIVITIES; CONSTRUCTION MATERIALS; CONSTRUCTION PRODUCTIVITIES; LABOR PRODUCTIVITIES; MATERIAL TECHNOLOGIES; PARTIAL FACTOR PRODUCTIVITIES; TECHNOLOGY ASSESSMENT; UNIT WEIGHTS;

EID: 62549118247     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2009)135:4(278)     Document Type: Article
Times cited : (69)

References (25)
  • 1
    • 0001296853 scopus 로고
    • Why construction industry productivity is declining
    • Allen, S. G. (1985). " Why construction industry productivity is declining.." Rev. Econ. Stat., 117 (4), 661-665.
    • (1985) Rev. Econ. Stat. , vol.117 , Issue.4 , pp. 661-665
    • Allen, S.G.1
  • 2
    • 27644571340 scopus 로고    scopus 로고
    • Measuring productivity: An industry challenge
    • Bernstein, H. (2003). " Measuring productivity: An industry challenge.." Civ. Eng. (N.Y.), 73 (12), 46-52.
    • (2003) Civ. Eng. (N.Y.) , vol.73 , Issue.12 , pp. 46-52
    • Bernstein, H.1
  • 3
    • 84869257552 scopus 로고    scopus 로고
    • Bureau of Labor Statistics (BLS).. United States Dept. of Labor Bureau of Labor Statistics, 〈〉 (July 28, 2006).
    • Bureau of Labor Statistics (BLS). (2006). United States Dept. of Labor Bureau of Labor Statistics, 〈 www.bls.gov 〉 (July 28, 2006).
    • (2006)
  • 5
    • 0003354739 scopus 로고
    • Productivity and price trends in construction since 1947
    • Dacy, D. (1965). " Productivity and price trends in construction since 1947.." Rev. Econ. Stat., 47 (4), 406-411.
    • (1965) Rev. Econ. Stat. , vol.47 , Issue.4 , pp. 406-411
    • Dacy, D.1
  • 6
    • 2342443555 scopus 로고    scopus 로고
    • Partial factor productivity and equipment technology change at the activity level in the U.S. construction industry
    • Goodrum, P., and Haas, C. (2002) " Partial factor productivity and equipment technology change at the activity level in the U.S. construction industry.." J. Constr. Eng. Manage., 128 (6), 463-472.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.6 , pp. 463-472
    • Goodrum, P.1    Haas, C.2
  • 7
    • 13944271409 scopus 로고    scopus 로고
    • The long-term impact of equipment technology on labor productivity in the U.S. construction Industry at the activity level
    • Goodrum, P., and Haas, C. (2004). " The long-term impact of equipment technology on labor productivity in the U.S. construction Industry at the activity level.." J. Constr. Eng. Manage., 131 (1), 124-131.
    • (2004) J. Constr. Eng. Manage. , vol.131 , Issue.1 , pp. 124-131
    • Goodrum, P.1    Haas, C.2
  • 8
    • 0036648366 scopus 로고    scopus 로고
    • The divergence in aggregate and activity estimates of U.S. construction productivity
    • ".
    • Goodrum, P., Haas, C., and Glover, R. (2002). " The divergence in aggregate and activity estimates of U.S. construction productivity.." Constr. Manage. Econom., 20 (5), 415-423.
    • (2002) Constr. Manage. Econom. , vol.20 , Issue.5 , pp. 415-423
    • Goodrum, P.1    Haas, C.2    Glover, R.3
  • 9
    • 2142819365 scopus 로고
    • A new view of real investment in structures, 1919-1966
    • Gordon, R. (1968). " A new view of real investment in structures, 1919-1966.." Rev. Econ. Stat., 50 (4), 417-428.
    • (1968) Rev. Econ. Stat. , vol.50 , Issue.4 , pp. 417-428
    • Gordon, R.1
  • 10
    • 33745870143 scopus 로고    scopus 로고
    • Inflation maintains strong momentum
    • Grogan, T. (2006). " Inflation maintains strong momentum.." Eng. News-Rec., 256 (25), 67.
    • (2006) Eng. News-Rec. , vol.256 , Issue.25 , pp. 67
    • Grogan, T.1
  • 11
    • 11244325052 scopus 로고    scopus 로고
    • Bias in aggregate productivity trends revisited
    • U.S. Bureau of Labor Statistics, March.
    • Gullickson, W., and Harper, M. (2002). " Bias in aggregate productivity trends revisited.." Monthly labor review, U.S. Bureau of Labor Statistics, March, 32-40.
    • (2002) Monthly Labor Review , pp. 32-40
    • Gullickson, W.1    Harper, M.2
  • 14
    • 0018663078 scopus 로고
    • Productivity and technology in construction
    • Koch, J., and Moavenzadeh, F. (1979). " Productivity and technology in construction.." J. Constr. Div., 105 (4), 351-366.
    • (1979) J. Constr. Div. , vol.105 , Issue.4 , pp. 351-366
    • Koch, J.1    Moavenzadeh, F.2
  • 15
    • 13944258129 scopus 로고    scopus 로고
    • Project performance versus use of technologies at project and phase levels
    • O'Connor, J., and Yang, L. (2004). " Project performance versus use of technologies at project and phase levels.." J. Constr. Eng. Manage., 130 (3), 322-329
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.3 , pp. 322-329
    • O'Connor, J.1    Yang, L.2
  • 17
    • 0003286176 scopus 로고
    • Is construction technologically stagnant?
    • J. Lange and D. Mills, eds., Lexington Books, Lexington, Mass., 90.
    • Rosefielde, S., and Mills, D. (1979). " Is construction technologically stagnant? " The construction industry: Balance wheel of the economy, J. Lange, and, D. Mills, eds., Lexington Books, Lexington, Mass., 90.
    • (1979) The Construction Industry: Balance Wheel of the Economy
    • Rosefielde, S.1    Mills, D.2
  • 20
    • 0000869144 scopus 로고
    • An examination of the productivity decline in the construction industry
    • Stokes, H. (1981). " An examination of the productivity decline in the construction industry.." Rev. Econ. Stat., 63 (4), 495-502.
    • (1981) Rev. Econ. Stat. , vol.63 , Issue.4 , pp. 495-502
    • Stokes, H.1
  • 21
    • 13944272712 scopus 로고    scopus 로고
    • Productivity trends in the construction industry
    • San Francisco.
    • Teicholz, P. (2000). " Productivity trends in the construction industry.." Proc., 2000 AISC Annual Convention, San Francisco,.
    • (2000) Proc., 2000 AISC Annual Convention
    • Teicholz, P.1
  • 22
    • 0023559504 scopus 로고
    • Factor model of construction productivity
    • Thomas, H., and Yiakoumis, I. (1987). " Factor model of construction productivity.." J. Constr. Eng. Manage., 113 (4), 626-644.
    • (1987) J. Constr. Eng. Manage. , vol.113 , Issue.4 , pp. 626-644
    • Thomas, H.1    Yiakoumis, I.2
  • 23
    • 0025694102 scopus 로고
    • Modeling construction labor productivity
    • ".
    • Thomas, R. H., (1990). " Modeling construction labor productivity.." J. Constr. Eng. Manage., 116 (4), 705-726.
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.4 , pp. 705-726
    • Thomas, R.H.1
  • 24
    • 62549146512 scopus 로고    scopus 로고
    • Accurate productivity measures are elusive
    • Tuchman, J. (2003). " Accurate productivity measures are elusive.." Eng. News-Rec., 250 (18), 10.
    • (2003) Eng. News-Rec. , vol.250 , Issue.18 , pp. 10
    • Tuchman, J.1
  • 25
    • 3142680315 scopus 로고    scopus 로고
    • Study concludes productivity is up, just not enough
    • Tuchman, J. (2004). " Study concludes productivity is up, just not enough.." Eng. News-Rec., 253 (1), 18.
    • (2004) Eng. News-Rec. , vol.253 , Issue.1 , pp. 18
    • Tuchman, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.