메뉴 건너뛰기




Volumn 63, Issue 2, 2012, Pages 629-646

Optimal design of flood-control multi-reservoir system on a watershed scale

Author keywords

Flood; Hazard; Multi reservoir; Natural; Optimization; Pareto; Simulation

Indexed keywords

FLOOD CONTROL; HYDRODYNAMICS; MULTIRESERVOIR SYSTEM; NATURAL HAZARD; NUMERICAL MODEL; OPTIMIZATION; WATERSHED;

EID: 84864407881     PISSN: 0921030X     EISSN: None     Source Type: Journal    
DOI: 10.1007/s11069-012-0169-6     Document Type: Article
Times cited : (40)

References (53)
  • 1
    • 0034306790 scopus 로고    scopus 로고
    • Multi-stage flood routing for gated reservoirs and conjunctive optimization of hydroelectricity income with flood losses
    • Acanal N, Yurtal R, Haktanir T (2000) Multi-stage flood routing for gated reservoirs and conjunctive optimization of hydroelectricity income with flood losses. J Hydrol Sci 45(5): 675-688.
    • (2000) J Hydrol Sci , vol.45 , Issue.5 , pp. 675-688
    • Acanal, N.1    Yurtal, R.2    Haktanir, T.3
  • 2
    • 0028174441 scopus 로고
    • Optimizing river diversion under hydraulic and hydrologic uncertainties
    • Afshar A, Barkhordary A, Marino MA (1994) Optimizing river diversion under hydraulic and hydrologic uncertainties. J Water Resour Plan Manag ASCE 120(1): 36-47.
    • (1994) J Water Resour Plan Manag ASCE , vol.120 , Issue.1 , pp. 36-47
    • Afshar, A.1    Barkhordary, A.2    Marino, M.A.3
  • 3
    • 70449569422 scopus 로고    scopus 로고
    • Non-dominated archiving multi-colony ant algorithm for multi-objective optimization: Application to multi-purpose reservoir operation
    • Afshar A, Sharifi F, Jalali MR (2009a) Non-dominated archiving multi-colony ant algorithm for multi-objective optimization: Application to multi-purpose reservoir operation. Eng Optim 41(4): 313-325.
    • (2009) Eng Optim , vol.41 , Issue.4 , pp. 313-325
    • Afshar, A.1    Sharifi, F.2    Jalali, M.R.3
  • 4
    • 61449152197 scopus 로고    scopus 로고
    • Risk-based optimization of large flood-diversion systems using genetic algorithms
    • Afshar A, Rasekh A, Afshar MH (2009b) Risk-based optimization of large flood-diversion systems using genetic algorithms. Eng Optim 41(3): 259-273.
    • (2009) Eng Optim , vol.41 , Issue.3 , pp. 259-273
    • Afshar, A.1    Rasekh, A.2    Afshar, M.H.3
  • 5
    • 77955682503 scopus 로고    scopus 로고
    • State of the art for genetic algorithms and beyond in water resources planning and management
    • ASCE Task Committee on Evolutionary Computation in Environmental and Water Resources Engineering, doi: 10.1061/(ASCE)WR.1943-5452.0000053
    • ASCE Task Committee on Evolutionary Computation in Environmental and Water Resources Engineering (2009) State of the art for genetic algorithms and beyond in water resources planning and management. J Water Resour Plan Manag ASCE. doi: 10.1061/(ASCE)WR.1943-5452.0000053.
    • (2009) J Water Resour Plan Manag ASCE
  • 6
    • 33144459790 scopus 로고    scopus 로고
    • Alternative decision making in water distribution network with NSGA-II
    • Atiquzzaman M, Liong S-Y, Yu X (2006) Alternative decision making in water distribution network with NSGA-II. J Water Resour Plan Manag 132(2): 122-126.
    • (2006) J Water Resour Plan Manag , vol.132 , Issue.2 , pp. 122-126
    • Atiquzzaman, M.1    Liong, S.-Y.2    Yu, X.3
  • 7
    • 0017933338 scopus 로고
    • Nonstructural floodplain planning
    • Bialas WF, Loucks DP (1978) Nonstructural floodplain planning. J Water Resour Res 14(1): 67-74.
    • (1978) J Water Resour Res , vol.14 , Issue.1 , pp. 67-74
    • Bialas, W.F.1    Loucks, D.P.2
  • 8
    • 84971288687 scopus 로고    scopus 로고
    • Bureau of Technical Affairs and Standards, No. 215, Management and Planning Organization, Ministry of Energy, Islamic Republic of Iran
    • Bureau of Technical Affairs and Standards (2001) Basic computational measures in economic analysis of water resources projects. No. 215, Management and Planning Organization, Ministry of Energy, Islamic Republic of Iran.
    • (2001) Basic Computational Measures In Economic Analysis of Water Resources Projects
  • 9
    • 9144251193 scopus 로고    scopus 로고
    • Quantifying the benefit of a flood warning system
    • doi: 10.1061/(ASCE)1527-6988(2004)5: 3(131)
    • Carsell KM, Pingel ND, Ford DT (2004) Quantifying the benefit of a flood warning system. Nat Hazards Rev 5(3): 131-140. doi: 10.1061/(ASCE)1527-6988(2004)5: 3(131).
    • (2004) Nat Hazards Rev , vol.5 , Issue.3 , pp. 131-140
    • Carsell, K.M.1    Pingel, N.D.2    Ford, D.T.3
  • 10
    • 43449094328 scopus 로고    scopus 로고
    • Guiding rational reservoir flood operation using penalty-type genetic algorithm
    • Chang LC (2008) Guiding rational reservoir flood operation using penalty-type genetic algorithm. J Hydrol 354: 65-74.
    • (2008) J Hydrol , vol.354 , pp. 65-74
    • Chang, L.C.1
  • 11
    • 4544247605 scopus 로고    scopus 로고
    • Flood control management system for reservoirs
    • Cheng CT, Chau KW (2004) Flood control management system for reservoirs. Environ Model Softw 19: 1141-1150.
    • (2004) Environ Model Softw , vol.19 , pp. 1141-1150
    • Cheng, C.T.1    Chau, K.W.2
  • 12
    • 38649121509 scopus 로고    scopus 로고
    • Decision-tree analysis on optimal release of reservoir storage under typhoon warnings
    • doi:10.1007/s11069-007-9142-1
    • Cheng C, Hsu N, Wei C (2008) Decision-tree analysis on optimal release of reservoir storage under typhoon warnings. J Nat Hazard 44: 65-84. doi: 10. 1007/s11069-007-9142-1.
    • (2008) J Nat Hazard , vol.44 , pp. 65-84
    • Cheng, C.1    Hsu, N.2    Wei, C.3
  • 14
    • 79960389349 scopus 로고    scopus 로고
    • USACE experience in implementing risk analysis for flood damage reduction projects
    • Davis D, Faber BA, Stedinger JR (2008) USACE experience in implementing risk analysis for flood damage reduction projects. J Contemp Water Res Edu 140: 3-14.
    • (2008) J Contemp Water Res Edu , vol.140 , pp. 3-14
    • Davis, D.1    Faber, B.A.2    Stedinger, J.R.3
  • 15
    • 2142732210 scopus 로고
    • A recursive programming model for non-structural flood damage control
    • doi:10.1029/WR006i005p01262
    • Day JC (1970) A recursive programming model for non-structural flood damage control. J Water Resour Res 4(5): 1262-1271. doi: 10. 1029/WR006i005p01262.
    • (1970) J Water Resour Res , vol.4 , Issue.5 , pp. 1262-1271
    • Day, J.C.1
  • 17
    • 84864414267 scopus 로고    scopus 로고
    • FEMA, June 1998, Federal emergency management agency, Mitigation Directorate, 500 C Street, SW., Washington, DC
    • FEMA (1998) Homeowner's guide for retrofitting, six ways to protect your house from flooding, June 1998, Federal emergency management agency, Mitigation Directorate, 500 C Street, SW., Washington, DC 20472.
    • (1998) Homeowner's Guide For Retrofitting, Six Ways to Protect Your House From Flooding , pp. 20472
  • 18
    • 85009632244 scopus 로고    scopus 로고
    • Risk-based floodplain management: a case study from Greece
    • (IAHR & INBO)
    • Ganoulis J (2003) Risk-based floodplain management: a case study from Greece. Int J River Basin Manag 1(1): 41-47 (IAHR & INBO).
    • (2003) Int J River Basin Manag , vol.1 , Issue.1 , pp. 41-47
    • Ganoulis, J.1
  • 19
    • 79959236434 scopus 로고    scopus 로고
    • Probabilistic rainfall thresholds for flood forecasting: evaluating different methodologies for modeling rainfall spatial dependence
    • Golian S, Saghafian B, Elmi M, Maknoon R (2011) Probabilistic rainfall thresholds for flood forecasting: evaluating different methodologies for modeling rainfall spatial dependence. Hydrol Process 25: 2046-2055.
    • (2011) Hydrol Process , vol.25 , pp. 2046-2055
    • Golian, S.1    Saghafian, B.2    Elmi, M.3    Maknoon, R.4
  • 20
    • 13444276610 scopus 로고    scopus 로고
    • Assessment of flood control and management options
    • Flood Hazard Research Centre, Middlesex University, 19 June 2000
    • Green CH, Parker DJ, Tunstall SM (2000) Assessment of flood control and management options. World Commission on Dams, Flood Hazard Research Centre, Middlesex University, 19 June 2000.
    • (2000) World Commission On Dams
    • Green, C.H.1    Parker, D.J.2    Tunstall, S.M.3
  • 21
    • 34548486926 scopus 로고    scopus 로고
    • Controlling spillway gates of dams by using fuzzy logic controller with optimum rule number
    • doi: 10.1016/j.asoc.2007.01.004
    • Karaboga D, Bagis A, Haktanir T (2007) Controlling spillway gates of dams by using fuzzy logic controller with optimum rule number. Appl Soft Comput J. doi: 10.1016/j.asoc.2007.01.004.
    • (2007) Appl Soft Comput J
    • Karaboga, D.1    Bagis, A.2    Haktanir, T.3
  • 22
    • 67649781835 scopus 로고    scopus 로고
    • Development of optimization schemes for floodplain management; A case study
    • doi: 10.1007/s11269-008-9350-9
    • Karamouz M, Abesi O, Moridi A, Ahmadi A (2008) Development of optimization schemes for floodplain management; A case study. J Water Resour Manag. doi: 10.1007/s11269-008-9350-9.
    • (2008) J Water Resour Manag
    • Karamouz, M.1    Abesi, O.2    Moridi, A.3    Ahmadi, A.4
  • 24
    • 77952237565 scopus 로고    scopus 로고
    • Optimal reservoir operation for flood control using folded dynamic programming
    • Kumar DN, Baliarsingh F, Raju KS (2010) Optimal reservoir operation for flood control using folded dynamic programming. Water Resour Manag 24: 1045-1064.
    • (2010) Water Resour Manag , vol.24 , pp. 1045-1064
    • Kumar, D.N.1    Baliarsingh, F.2    Raju, K.S.3
  • 25
    • 77949291019 scopus 로고    scopus 로고
    • Novel multi objective shuffled frog leaping algorithm with application to reservoir flood control operation
    • Li Y, Zhou J, Zhang Y, Qin H, Liu L (2010) Novel multi objective shuffled frog leaping algorithm with application to reservoir flood control operation. J Water Resour Plan Manag ASCE 136(2): 217-226.
    • (2010) J Water Resour Plan Manag ASCE , vol.136 , Issue.2 , pp. 217-226
    • Li, Y.1    Zhou, J.2    Zhang, Y.3    Qin, H.4    Liu, L.5
  • 26
    • 0036565831 scopus 로고    scopus 로고
    • Floodplain planning with risk-based optimization
    • doi: 10.1061/(ASCE)0733-9496(2002)128: 3(202)
    • Lund JR (2002) Floodplain planning with risk-based optimization. J Water Resour Plan Manag 128(3): 202-207. doi: 10.1061/(ASCE)0733-9496(2002)128: 3(202).
    • (2002) J Water Resour Plan Manag , vol.128 , Issue.3 , pp. 202-207
    • Lund, J.R.1
  • 28
    • 77951976848 scopus 로고    scopus 로고
    • A real-time operation optimization model for flood management in river-reservoir systems
    • doi:10.1007/s11069-009-9442-8
    • Malekmohammadi B, Zahraie B, Kerachian R (2009) A real-time operation optimization model for flood management in river-reservoir systems. Nat Hazards 53: 459-482. doi: 10. 1007/s11069-009-9442-8.
    • (2009) Nat Hazards , vol.53 , pp. 459-482
    • Malekmohammadi, B.1    Zahraie, B.2    Kerachian, R.3
  • 31
    • 2142785166 scopus 로고
    • Dynamic programming for flood control planning: The optimal mix of adjustments to flood
    • In: Esogbue AO, Prentice-Hall, Englewood Cliffs, NJ
    • Morin TL, Meier WL, Nagaraj KS (1989) Dynamic programming for flood control planning: the optimal mix of adjustments to flood. In: Esogbue AO (ed) Dynamic programming for optimal water resources systems analysis. Prentice-Hall, Englewood Cliffs, NJ, pp 286-306.
    • (1989) Dynamic Programming For Optimal Water Resources Systems Analysis , pp. 286-306
    • Morin, T.L.1    Meier, W.L.2    Nagaraj, K.S.3
  • 32
    • 33745951827 scopus 로고    scopus 로고
    • Non-uniform flow effect on optimal waste load allocation in rivers
    • Murty YSR, MurtyBhallamudi S, Srinivasan K (2006) Non-uniform flow effect on optimal waste load allocation in rivers. Water Resour Manag 20(4): 509-530.
    • (2006) Water Resour Manag , vol.20 , Issue.4 , pp. 509-530
    • Murty, Y.S.R.1    Murtybhallamudi, S.2    Srinivasan, K.3
  • 33
    • 33947164707 scopus 로고    scopus 로고
    • Simulation and optimization modeling approach for operation of the HoaBinh reservoir, Vietnam
    • Ngo LL, Madsen H, Rosbjerg D (2007) Simulation and optimization modeling approach for operation of the HoaBinh reservoir, Vietnam. J Hydrol 336: 269-281.
    • (2007) J Hydrol , vol.336 , pp. 269-281
    • Ngo, L.L.1    Madsen, H.2    Rosbjerg, D.3
  • 34
    • 67650588333 scopus 로고    scopus 로고
    • A stochastic conflict resolution model for trading pollutant discharge permits in river systems
    • Niksokhan MH, Kerachian R, Amin P (2009) A stochastic conflict resolution model for trading pollutant discharge permits in river systems. Environ Monit Assess 154: 219-232.
    • (2009) Environ Monit Assess , vol.154 , pp. 219-232
    • Niksokhan, M.H.1    Kerachian, R.2    Amin, P.3
  • 36
    • 20344398219 scopus 로고    scopus 로고
    • Estimating forecast lead time
    • doi: 10.1061/(ASCE)1527-6988(2005)6:2(60)
    • Pingel N, Jones C, Ford D (2005) Estimating forecast lead time. Nat Hazard Rev ASCE 6(2): 60-66. doi: 10.1061/(ASCE)1527-6988(2005)6:2(60).
    • (2005) Nat Hazard Rev ASCE , vol.6 , Issue.2 , pp. 60-66
    • Pingel, N.1    Jones, C.2    Ford, D.3
  • 37
    • 77955774403 scopus 로고    scopus 로고
    • Risk-cost optimization of hydraulic structures: Methodology and case study
    • doi: 10. 1007/s11269-010-9582-3
    • Rasekh A, Afshar A, Afshar MH (2010) Risk-cost optimization of hydraulic structures: methodology and case study. Water Resour Manag. doi: 10. 1007/s11269-010-9582-3.
    • (2010) Water Resour Manag
    • Rasekh, A.1    Afshar, A.2    Afshar, M.H.3
  • 38
    • 33847134303 scopus 로고    scopus 로고
    • Multi-objective differential evolution with application to reservoir system optimization
    • Reddy MJ, Kumar DN (2007) Multi-objective differential evolution with application to reservoir system optimization. J Comput Civ Eng ASCE 21(2): 136-146.
    • (2007) J Comput Civ Eng ASCE , vol.21 , Issue.2 , pp. 136-146
    • Reddy, M.J.1    Kumar, D.N.2
  • 39
    • 1842787606 scopus 로고    scopus 로고
    • Striking the balance: long-term groundwater monitoring design for conflicting objectives
    • Reed PM, Minsker BS (2004) Striking the balance: long-term groundwater monitoring design for conflicting objectives. J Water Resour Plan Manag ASCE 130(2): 140-149.
    • (2004) J Water Resour Plan Manag ASCE , vol.130 , Issue.2 , pp. 140-149
    • Reed, P.M.1    Minsker, B.S.2
  • 41
    • 50149115590 scopus 로고    scopus 로고
    • Optimizing retention basin networks
    • doi:10.1061/(ASCE)0733-9496(2008)134:5(432)
    • Travis QB, Mays LW (2008) Optimizing retention basin networks. J Water Resour Plan Manag 134(5): 432-439. doi:10.1061/(ASCE)0733-9496(2008)134:5(432).
    • (2008) J Water Resour Plan Manag , vol.134 , Issue.5 , pp. 432-439
    • Travis, Q.B.1    Mays, L.W.2
  • 42
    • 0023421456 scopus 로고
    • Effects of uncertainties on optimal risk-based design of hydraulic structures
    • Tung YK (1987) Effects of uncertainties on optimal risk-based design of hydraulic structures. J Water Resour Plan Manag ASCE 113(5): 709-722.
    • (1987) J Water Resour Plan Manag ASCE , vol.113 , Issue.5 , pp. 709-722
    • Tung, Y.K.1
  • 43
    • 0019376844 scopus 로고
    • Optimal risk-based design of flood levee systems
    • Tung YK, Mays LW (1981) Optimal risk-based design of flood levee systems. J Water Resour Res 17(4): 843-852.
    • (1981) J Water Resour Res , vol.17 , Issue.4 , pp. 843-852
    • Tung, Y.K.1    Mays, L.W.2
  • 46
    • 77955592755 scopus 로고    scopus 로고
    • Optimal dam operation during flood season using a distributed hydrological model and a heuristic algorithm
    • Valeriano OCS, Koike T, Yang K, Yang D (2010) Optimal dam operation during flood season using a distributed hydrological model and a heuristic algorithm. ASCE J Hydrol Eng 15(7): 580-586.
    • (2010) ASCE J Hydrol Eng , vol.15 , Issue.7 , pp. 580-586
    • Valeriano, O.C.S.1    Koike, T.2    Yang, K.3    Yang, D.4
  • 47
    • 54049139292 scopus 로고    scopus 로고
    • Multireservoir flood-control optimization with neural-based linear channel level routing under tidal effects
    • doi:10.1007/s11269-008-9246-8
    • Wei C, Hsu N (2008) Multireservoir flood-control optimization with neural-based linear channel level routing under tidal effects. Water Resour Manag 22: 1625-1647. doi: 10. 1007/s11269-008-9246-8.
    • (2008) Water Resour Manag , vol.22 , pp. 1625-1647
    • Wei, C.1    Hsu, N.2
  • 48
    • 58849099177 scopus 로고    scopus 로고
    • Optimal tree-based release rules for real-time flood control operations on a multipurpose multireservoir system
    • Wei C, Hsu N (2009) Optimal tree-based release rules for real-time flood control operations on a multipurpose multireservoir system. J Hydrol 365: 213-224.
    • (2009) J Hydrol , vol.365 , pp. 213-224
    • Wei, C.1    Hsu, N.2
  • 49
    • 84864401105 scopus 로고    scopus 로고
    • WRI, Report of hydraulic modeling and flood zoning, Water Research Institute, Ministry of Energy, Iran
    • WRI (2011a) Integrated flood management, case study: Kan basin. Report of hydraulic modeling and flood zoning, Water Research Institute, Ministry of Energy, Iran.
    • (2011) Integrated Flood Management, Case Study: Kan Basin
  • 50
    • 84864401105 scopus 로고    scopus 로고
    • WRI, Report of flood vulnerability assessment, Water Research Institute, Ministry of Energy, Iran
    • WRI (2011b) Integrated flood management, case study: Kan basin. Report of flood vulnerability assessment, Water Research Institute, Ministry of Energy, Iran.
    • (2011) Integrated Flood Management, Case Study: Kan Basin
  • 51
    • 84864401105 scopus 로고    scopus 로고
    • WRI, Report of assigning the feasibility of flood mitigation measures. Water Research Institute, Ministry of Energy, Iran
    • WRI (2011c) Integrated flood management, case study: Kan basin. Report of assigning the feasibility of flood mitigation measures. Water Research Institute, Ministry of Energy, Iran.
    • (2011) Integrated Flood Management, Case Study: Kan Basin
  • 52
    • 84864401105 scopus 로고    scopus 로고
    • WRI, Report of economical analysis of flood mitigation measures. Water Research Institute, Ministry of Energy, Iran
    • WRI (2011d) Integrated flood management, case study: Kan basin. Report of economical analysis of flood mitigation measures. Water Research Institute, Ministry of Energy, Iran.
    • (2011) Integrated Flood Management, Case Study: Kan Basin
  • 53
    • 33645834140 scopus 로고    scopus 로고
    • Multiobjective optimal waste load allocation models for rivers using nondominated sorting genetic algorithm-II
    • Yandamuri SRM, Srinivasan K, Bhallamudi SM (2006) Multiobjective optimal waste load allocation models for rivers using nondominated sorting genetic algorithm-II. J Water Resour Plan Manag ASCE 132(3): 133-143.
    • (2006) J Water Resour Plan Manag ASCE , vol.132 , Issue.3 , pp. 133-143
    • Yandamuri, S.R.M.1    Srinivasan, K.2    Bhallamudi, S.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.